Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                               PROPOSAL                                         COMPLIANCE
  (a)    adversely affect the function of                                                         Please refer to the attached Civil Engineering
         the service;                                                                             Report for further details.
  (b)    place an additional load on the
         service; and
  (c)    unduly    increase            future
         maintenance costs.
 PO2                                            AO2.1                                             AO2.1
 Maintenance access is provided to all          For trunk infrastructure, a registered            The proposal will maintain the existing          ☒Compliant
 stormwater drains, overland flow paths         easement in favour of Council is created          easement over the drainage infrastructure        ☐N/A
 and associated structures.                     over all underground infrastructure located       and will provide an easement over lot 5 for
                                                in private property.                              services to lot 4.                               ☐Performance Solution

                                                AO2.2                                             AO2.2                                            ☒Compliant
                                                The width of the easement required is in          Proposed easements will be suitably sized        ☐N/A
                                                accordance with Council’s Planning Scheme         and designed in accordance with the relevant
                                                                                                                                                   ☐Performance Solution
                                                Policy PSP6 Engineering Design Standards –        requirements.
                                                Roads, drainage and earthworks.
                                                AO2.3                                             AO2.3                                            ☒Compliant
                                                The easement is centred over the centreline       Proposed easements will be suitably sized        ☐N/A
                                                of the infrastructure.                            and designed in accordance with the relevant
                                                                                                                                                   ☐Performance Solution
                                                                                                  requirements.




                                                        BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                                    NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                                 E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.