Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE system that delivers water for optimum accordance with the relevant requirements plant growth and minimum evaporation. where required. AO2.7 AO2.7 ☒Compliant Edges of different surfaces and gardens are The proposal will provide landscaping that is ☐N/A defined to assist with maintenance. designed, planted and maintained in ☐Performance Solution accordance with the relevant requirements where required. AO2.8 AO2.8 ☐Compliant For retaining walls, rock facing or mass rock The proposed does not require retaining ☒N/A walls are used rather than rendered block, walls. ☐Performance Solution concrete or other urban style walls. AO2.9 AO2.9 ☐Compliant Timbers and other natural materials that The proposal does not provide new buildings. ☒N/A reflect the colours and textures of the ☐Performance Solution landscape are incorporated. AO2.10 AO2.10 ☐Compliant Timbers which are allowed to fade to grey The proposal does not provide new buildings. ☒N/A and metals that are designed to rust are ☐Performance Solution used rather than materials which require regular treatment or maintenance. Street Trees AO3.1 AO3.1 PO3 A minimum of 2 street trees are provided The proposal may provide street trees where ☒Compliant Street trees within road reserves per lot or every 8 metres of frontage, relevant and required as part of the ☐N/A provide effective canopy shading whichever is the greater. development. ☐Performance Solution BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.