Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                        COMPLIANCE
 having regard to the size and scale of
 the road reserve and the location of      AO3.2                                             AO3.2                                           ☒Compliant
 services and other structures.
                                           Street trees are planted a minimum of 1m          The proposal may provide street trees where     ☐N/A
                                           from the back of the kerb in the road reserve     relevant and required as part of the            ☐Performance Solution
                                           verge and are of a species that do not impact     development.
                                           on services.
 PO4                                       AO4                                               AO4
 Street trees in towns and villages, are   Where a street or locality has an identified      The proposal will provide landscaping that is   ☒Compliant
 consistent     with    the     existing   character derived from existing vegetation,       designed, planted and maintained in             ☐N/A
 streetscape character.                    similar or identical species are used.            accordance with the relevant requirements       ☐Performance Solution
                                                                                             where required.
 Safety and security                       AO5.1                                             AO5.1
 PO5                                       Landscaping features like planting, changes       The proposal will provide landscaping that is   ☒Compliant
 Landscaping is designed and located to    of material and texture, pedestrian shelter,      designed, planted and maintained in             ☐N/A
 maximise the safety and security of       changes of level, artwork, signage, low walls,    accordance with the relevant requirements       ☐Performance Solution
 public and private areas by—              seating and the like define desired               where required.
                                           movement areas and delineate public and
 a) clearly defining the boundaries
                                           private areas.
    between private and public spaces;
 b) promoting casual surveillance of
    buildings and public areas from the    AO5.2                                             AO5.2                                           ☒Compliant
    street and other public areas for      Landscaping allows adequate visibility for The proposal will provide landscaping that is          ☐N/A
    personal security reasons;             casual surveillance of public and semi-public designed, planted and maintained in                 ☐Performance Solution
 c) avoiding concealment spots;            spaces.                                       accordance with the relevant requirements
                                                                                         where required.
 d) maintaining safe sight distances to
    and from road and building             AO5.3                                             AO5.3                                           ☒Compliant
    corners, car park entrances and                                                          The proposal will provide landscaping that is   ☐N/A
    driveways;                                                                               designed, planted and maintained in             ☐Performance Solution



                                                   BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                               NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                            E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.