Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                  COMPLIANCE
                                           AO9.3                                             AO9.3                                     ☐Compliant
                                           Pathways are provided to cater for shared         The proposal is not required to provide   ☒N/A
                                           use and cater for both commuting and              pathways for walking or cycling.          ☐Performance Solution
                                           recreational usage


                                           AO9.4                                             AO9.4                                     ☐Compliant
                                           Pathways have ramps at all kerbs designed The proposal is not required to provide           ☒N/A
                                           for wheelchair and pram access across pathways for walking or cycling.                      ☐Performance Solution
                                           roads.


                                           AO9.5                                             AO9.5                                     ☐Compliant
                                           Development    has     convenient          and The proposal is not required to provide      ☒N/A
                                           prominent pedestrian entrances that:           pathways for walking or cycling.             ☐Performance Solution
                                           a) are orientated towards the street; and
                                           b) cater for universal access.


                                           AO9.6                                             AO9.6                                     ☐Compliant
                                           Pathways are adequately lit and have              The proposal is not required to provide   ☒N/A
                                           navigational signs.                               pathways for walking or cycling.          ☐Performance Solution


                                           AO9.7                                             AO9.7                                     ☐Compliant
                                           Pedestrian and cycle pathways are designed        The proposal is not required to provide   ☒N/A
                                           and constructed to:                               pathways for walking or cycling.          ☐Performance Solution
                                           a) provide a stable, smooth surface,
                                              including across driveways, sections and
                                              joins;



                                                   BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                               NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                            E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.