Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PURPOSE & OVERALL OUTCOMES PROPOSAL COMPLIANCE b) Stormwater drainage systems are designed and constructed to effectively manage or convey stormwater in a way that protects people, property and the natural environment; c) Stormwater infrastructure and treatment systems are compatible with existing infrastructure and are designed and constructed to be cost effective across their design life; d) Stormwater design and management incorporates consideration of climate change impacts to ensure the intended function and capacity of the stormwater infrastructure and treatment systems are maintained over time; e) Stormwater infrastructure provides an appropriate level of flood immunity for roads based on desired standards of service identified for different flood hazard areas; f) Stormwater treatment systems are visually integrated into all development designs in a manner that incorporates natural features and habitats, as well as education opportunities to raise awareness of the connection of the development to its receiving waters; g) Stormwater treatment systems are multi-functional providing for stormwater conveyance, protection of ecologically important areas, passive recreation and erosion and sediment control; h) Hydrologic regimes are maintained to pre-development conditions to maintain waterway stability, protect ecology and groundwater dependent ecosystems, maintain suitable BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.