Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PURPOSE & OVERALL OUTCOMES PROPOSAL COMPLIANCE fish passage, and mitigate flood risk to people and property; and i) Development is designed, constructed and operated to facilitate erosion and drainage control and avoid release of prescribed water contaminants into receiving waters. 2.7.2 Performance Outcomes & Acceptable Outcomes PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE Stormwater drainage design AO1 AO1 PO1 A stormwater management plan is prepared The proposal provides a suitable stormwater ☒Compliant The development and its stormwater consistent management system as identified in the ☐N/A management system is planned and with PSP6 Engineering Design Standards - attached Civil Engineering Report. ☐Performance Solution designed having regard to: Roads, drainage and earthworks. a) the natural features of the site; b) the need to avoid impacts and potential risks to ecologically important areas; c) the likely effectiveness of erosion and sediment control and stormwater drainage measures during rainfall events during and post construction; and d) the need to protect environmental values and water quality of BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.