Skip to the record
Every meeting, every word.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                               PROPOSAL                                      COMPLIANCE
      receiving waters both during and
      post construction.
 PO2                                            AO2.1                                             AO2.1
 Stormwater drainage infrastructure is          Stormwater drainage planning, design and          The proposal provides a suitable stormwater   ☒Compliant
 planned, designed and constructed to:          construction is in accordance with PSP6           management system as identified in the        ☐N/A
 a) incorporate      allowance   for            Engineering Design Standards - Roads,             attached Civil Engineering Report.
                                                drainage and earthworks and the latest                                                          ☐Performance Solution
    increased flood risk and tidal
    inundation through pipework as a            version of the Queensland Urban Drainage
    result of climate change and sea            Design Manual.
    level rise;
 b) ensure the development                 is   AO2.2                                             AO2.2                                         ☒Compliant
    adequately drained; and                     The stormwater drainage system connects           The proposal provides a suitable stormwater   ☐N/A
 c) ensure stormwater is managed                to a lawful point of discharge in accordance      management system as identified in the
                                                                                                                                                ☐Performance Solution
    and lawfully discharged without             with PSP6 Engineering Design Standards -          attached Civil Engineering Report.
    altering stormwater drainage                Roads, drainage and earthworks.
    characteristics external to the site.
                                                AO2.3                                             AO2.3                                         ☒Compliant
                                                Stormwater flows discharging from the             The proposal provides a suitable stormwater   ☐N/A
                                                development are demonstrated to be                management system as identified in the
                                                                                                                                                ☐Performance Solution
                                                consistent       with pre-development             attached Civil Engineering Report.
                                                characteristics.


                                                AO2.4                                             AO2.4                                         ☒Compliant
                                                Development provides for the management           The proposal provides a suitable stormwater   ☐N/A
                                                of stormwater to incorporate appropriate          management system as identified in the
                                                                                                                                                ☐Performance Solution
                                                allowance for climate change impacts              attached Civil Engineering Report.
                                                (including rainfall intensity and sea level



                                                        BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                                    NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                                 E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.