Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                            ACCEPTABLE OUTCOMES                               PROPOSAL                                      COMPLIANCE
      stormwater          through          the   AO11.3                                            AO11.3                                        ☒Compliant
      development;                               Bank and bed stability and planting densities     The proposal provides a suitable stormwater   ☐N/A
 e) landscaping that incorporates local          result in a stable channel over the long term     management system as identified in the
                                                                                                                                                 ☐Performance Solution
    native species; and                          and minimal potential for pest plant species.     attached Civil Engineering Report.
 f)   bed and bank stability.
                                                 AO11.4                                            AO11.4                                        ☒Compliant
                                                 Water Sensitive Design measures are               The proposal provides a suitable stormwater   ☐N/A
                                                 incorporated into the development, as             management system as identified in the
                                                                                                                                                 ☐Performance Solution
                                                 detailed in the document Water Sensitive          attached Civil Engineering Report.
                                                 Designs small improvements, new ideas,
                                                 concepts and sketch designs for stormwater
                                                 filtration systems (Healthy Waterways
                                                 Water by Design).


                                                 AO11.5                                            AO11.5                                        ☒Compliant
                                                 Floodplain management is designed in              The proposal provides a suitable stormwater   ☐N/A
                                                 accordance with the Framework for the             management system as identified in the
                                                                                                                                                 ☐Performance Solution
                                                 Integration of Flood and Stormwater               attached Civil Engineering Report.
                                                 Management into Open Space published by
                                                 Healthy Waterways Water by Design
                                                 (version current at the time of development
                                                 application)
 PO12                                            AO12.1                                            AO12.1                                        ☒Compliant
 Development     protects in-stream              Where run-off from or within the site passes      The proposal provides a suitable stormwater   ☐N/A
 ecology    by    maintaining      pre-          through or drains to natural channels,            management system as identified in the
                                                                                                                                                 ☐Performance Solution
 development low flow discharge                  waterways or wetlands, development                attached Civil Engineering Report.
 regimes and maintaining fish passages.          protects in- steam ecology by maintaining
                                                 pre-development low flow discharge



                                                         BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                                     NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                                  E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.