Skip to the record
Search everything, all in one place.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                      COMPLIANCE
                                           regimes in accordance with the frequent
                                           flow management objectives in PSP6
                                           Engineering Design Standards - Roads,
                                           drainage and earthworks


                                           AO12.2                                            AO12.2                                        ☒Compliant
                                           Instream structures such as roads, bridges,       The proposal provides a suitable stormwater   ☐N/A
                                           culverts,     and     other    stormwater         management system as identified in the
                                                                                                                                           ☐Performance Solution
                                           infrastructure do not cause barriers to fish      attached Civil Engineering Report.
                                           passage and facilitate the movement of
                                           terrestrial and aquatic fauna along
                                           waterway corridors.


                                           AO12.3                                            AO12.3                                        ☒Compliant
                                           Benthic substrate retains a continuous            The proposal provides a suitable stormwater   ☐N/A
                                           grade with the direction of flow consistent       management system as identified in the
                                                                                                                                           ☐Performance Solution
                                           with the natural bed profile.                     attached Civil Engineering Report.


 PO13                                      AO13.1                                            AO13.1                                        ☒Compliant
 Development       is designed and         The location and form of stormwater               The proposal provides a suitable stormwater   ☐N/A
 constructed to maintain surface and       discharge points do not alter the                 management system as identified in the
                                                                                                                                           ☐Performance Solution
 ground water balances that sustain the    pre-development hydrology of receiving            attached Civil Engineering Report.
 environmental values of water             surface water or groundwater.
 dependent ecosystems, including
 downstream aquatic, riparian, wetland
                                           AO13.2                                            AO13.2                                        ☒Compliant
 and terrestrial ecosystems.
                                           Developments located on groundwater                                                             ☐N/A
                                           recharge or discharge areas are designed
                                                                                                                                           ☐Performance Solution


                                                   BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                               NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                            E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.