Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE AO14.3 AO14.3 ☐Compliant For buildings: The proposal does not provide buildings. ☒N/A a) upstream runoff is diverted around the ☐Performance Solution construction site; b) sediment barriers are provided downslope of disturbed areas to prevent sediment washing into gutters, drains and waterways , wetlands or drainage lines either on or off the site; and c) temporary or permanent downpipes are connected to the stormwater system before laying the roof; or d) localised erosion is avoided by directing flow from downpipes over non-erosive areas. AO14.4 AO14.4 ☒Compliant Chemical flocculants used as part of an The proposal will ensure appropriate ☐N/A erosion and sediment control plan do not construction methods are used in accordance ☐Performance Solution harm the environmental values within with the relevant requirements. receiving waters. AO14.5 AO14.5 ☒Compliant Appropriately sized litter containment The proposal will ensure appropriate ☐N/A areas, with provision for sorting recyclables construction methods are used in accordance ☐Performance Solution with the relevant requirements. BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.