Skip to the record
Every meeting, every word.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                      COMPLIANCE
                                           and managed in accordance with a                  The proposal provides a suitable stormwater
                                           groundwater recharge and discharge                management system as identified in the
                                           management plan prepared by a suitably            attached Civil Engineering Report.
                                           experienced and qualified groundwater
                                           hydrologist. The groundwater recharge or
                                           discharge must demonstrate that      the
                                           development does not affect groundwater
                                           balances beyond the property boundaries.


 Construction and establishment of         AO14.1                                            AO14.1                                        ☒Compliant
 stormwater management systems             An erosion and sediment control plan               The proposal will ensure appropriate         ☐N/A
 PO14                                      prepared in accordance with the                   construction methods are used in accordance
                                                                                                                                           ☐Performance Solution
 Construction methods provide for          International Erosion Control Association         with the relevant requirements.
 appropriate controls to avoid entry and   Best Practice Books demonstrates that the
 transport of litter, sediment, and        capture and release of stormwater achieves
 associated      prescribed       water    the design objectives listed in Table A:
 contaminants into receiving waters.       Construction     phase     –  stormwater
                                           management design objectives of the State
                                           Planning Policy (Appendix 2).


                                           AO14.2                                            AO14.2                                        ☒Compliant
                                           Construction works are designed and The proposal will ensure appropriate                        ☐N/A
                                           managed to restrict the extent of clearing construction methods are used in accordance
                                                                                                                                           ☐Performance Solution
                                           and soil exposure to the minimum necessary with the relevant requirements.
                                           for access, and safe construction at any one
                                           time.




                                                   BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                               NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                            E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.