Original source · versioned page text
2018-03-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 MARCH 2018 Safety Issues At the meeting on 15 February 2018, the Department reiterated its concerns regarding the safe movement of vehicles and vessels onto the QBFP site and its desire to secure access and control of the area for improved safety. The legal street access to the site is 2 Russell Street, however, the site is currently accessed via a concrete driveway from the Holiday Park (see Attachment 2) and accordingly, the Department wishes to secure access and control of this driveway. In the Department’s view, the area experiences significant tourist vehicle and pedestrian traffic requiring QBFP to transit this area with restricted visibility while reversing a vehicle/vessel into the driveway. The Department proposed that to achieve improved safety outcomes the creation of a road opening or easement over the current driveway was required in favour of the Department. Discussion Creation of an easement or road opening over the current driveway would not alleviate the Department’s safety concerns. Council has no objection to QBFP continuing to access the Holiday Park given the infrequent nature of the use to reverse vehicles/vessels onto the site. Practical measures such as spotters, etc. are preferred to land tenure instruments that: Remove Council control over a portion of the Holiday Park; Encumbers the lot creating unnecessary complexity; Reduce the size of the Holiday Park encouraging the parking of QBFP vehicles on the driveway; and Enlivens the future possibility of the installation of gates/fences to form a buffer around the driveway to ‘enhance safety’. If this were to occur, it would create an unnatural break in the Holiday Park reserve. One option to provide ongoing and secure access for QBFP through the Holiday Park is the development of a Deed of Agreement. Specifically, the Deed of Agreement: 1. Is legally binding; 2. Is not a registered dealing on the title; 3. Retains the complete Holiday Park land holding as envisaged in its reserve status and by the State Government’s Queensland Heritage listing; and 4. Allows the Department to make a Material Change of Use application satisfying development conditions for access. A Deed of Agreement will be discussed further with the Department should they wish to pursue this option. Conclusion Construction of the new building has occurred without any consideration of the Noosa Plan nor consultation with Council or the community. The building visually dominates the site and does not protect the visual amenity of neighbouring properties or the Noosa River. The size, bulk and appearance of the building constitutes a material change of use and requires a Development Permit under the Noosa Plan. The original 80ha reserve for public purposes (which included the Noosa River Holiday Park) was developed in 1980 and just under 3ha remains within the Holiday Park reserve. Requests by the State Government to further reduce the size of the Holiday Park and encumber the reserve by establishing a formal easement or opening a road (which may have unintended future consequences such as gates or fences) to facilitate access are not supported. Page 20 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.