Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2015-04-28 Infrastructure & Services Committee Agenda

of 100

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   28 APRIL 2015




                                                     Page 58 of 100

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                        28 APRIL 2015

        Weyba Creek Bank Stabilisation Project
        e  Safety. Some branches with rope               Duration of work
           risk of breaking off.                         due for completion by September 2015,
                                                         weather permitting.
        e  Hidden dangers. Dead trees in-stream
           are hidden from view at high tide and are     Work on the fishing structure is due for
           potentially dangerous.                        completion by June 2015, weather
                                                         permitting.
        While Council acknowledges the                      Rime        :      cap           ;
        recreational value placed on this section of              cei?                    ify
        Weyba Creek by the community, the area is              ee ola  ‘                  f     t
        being loved to death and Council has                  Sati                             as
        chosen to intervene to ensure public safety          Sn es            oe          ae
        on public land.                                   —     a             A) v
                ene Ni F a      ; ye    Y TZ                      ae       a ee = 4
            ox  ay Cain: iP             AAD G             ceramics:                     —
                  Bone       |       hee                   —                         a. cae
                               = Bar   7 ie  |            a        ¥                    ~¥
                                      a      R               hg eal  Ee          SOR es GRC Pe
                                                          - =a 3                    re ee
                                             sts                   ae ee
                                          ee              =     oT ee              Ls             |
                '                      -  .   }            .  os 5 WR Ns be nant os     >        aj
               at                                                tc   ea           ee
               wei.                =                             EN SY SoS Bet
                                 > 34                      “ Seen: 2S         om         ~ SS
            aa           >         7                      koi       Se           wae

             =       a  nie Se                            See WN om is °y        sy
          as      i                                       a ee               tae
             Pe   ee se                                                          oo.
                 a      Poa,        s       e            Aki         t of th      t is the d     f
              7   ee              ek    ee                  ey aspect of  the project is the design o
              Re           Se a>         4               the recreational/fishing structure. Council is
                ;         4    £o%, the  .               obliged to adhere to the design constraints
           aii                 ;     scciaaeate          imposed by State government agencies as
        Proposed work                                    Weyba Creek is a declared Fish Habitat
        It is Council’s intention to provide a safe,     Area.
        long-term access solution to the creek which
        in turn will protect the natural values of the   A Community Information Day will be
        ae       |                                       conducted onsite by Council to discuss the
        The work involves:                                   :       :                      oe
                    ;                     :              detailed design before a formal application
        e  The ongoing removal of rope swings                           ie         .
           f         .                                   for construction is lodged with the State.
            rom trees in the Reserve.
      _e   Design and construction of a                  Further inf     ti
   y ,     recreational/fishing structure.                uraner informasion 7      ;
  :     e  Closure of the surrounding riparian areas     Please contact Council's project ee Jan
           for rehabilitation purposes.                  Maddin on 5329 6221 or by email
                                                         [email protected] COUNCIL             PO Box 141               P. (07) 5329 6500     [email protected]
        :     ara                 TEWANTIN QLD 4565        F. (07) 5329 6501     Www.noosa.qid.gov.au

                                                                                          Page 58 of 100
Log in to download the original file

2015-04-28 Infrastructure & Services Committee Agenda(PDF, 10MB).pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.