Original source · versioned page text
2015-04-28 Infrastructure & Services Committee Agenda
The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 28 APRIL 2015
Page 58 of 100
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 28 APRIL 2015
Weyba Creek Bank Stabilisation Project
e Safety. Some branches with rope Duration of work
risk of breaking off. due for completion by September 2015,
weather permitting.
e Hidden dangers. Dead trees in-stream
are hidden from view at high tide and are Work on the fishing structure is due for
potentially dangerous. completion by June 2015, weather
permitting.
While Council acknowledges the Rime : cap ;
recreational value placed on this section of cei? ify
Weyba Creek by the community, the area is ee ola ‘ f t
being loved to death and Council has Sati as
chosen to intervene to ensure public safety Sn es oe ae
on public land. — a A) v
ene Ni F a ; ye Y TZ ae a ee = 4
ox ay Cain: iP AAD G ceramics: —
Bone | hee — a. cae
= Bar 7 ie | a ¥ ~¥
a R hg eal Ee SOR es GRC Pe
- =a 3 re ee
sts ae ee
ee = oT ee Ls |
' - . } . os 5 WR Ns be nant os > aj
at tc ea ee
wei. = EN SY SoS Bet
> 34 “ Seen: 2S om ~ SS
aa > 7 koi Se wae
= a nie Se See WN om is °y sy
as i a ee tae
Pe ee se oo.
a Poa, s e Aki t of th t is the d f
7 ee ek ee ey aspect of the project is the design o
Re Se a> 4 the recreational/fishing structure. Council is
; 4 £o%, the . obliged to adhere to the design constraints
aii ; scciaaeate imposed by State government agencies as
Proposed work Weyba Creek is a declared Fish Habitat
It is Council’s intention to provide a safe, Area.
long-term access solution to the creek which
in turn will protect the natural values of the A Community Information Day will be
ae | conducted onsite by Council to discuss the
The work involves: : : oe
; : detailed design before a formal application
e The ongoing removal of rope swings ie .
f . for construction is lodged with the State.
rom trees in the Reserve.
_e Design and construction of a Further inf ti
y , recreational/fishing structure. uraner informasion 7 ;
: e Closure of the surrounding riparian areas Please contact Council's project ee Jan
for rehabilitation purposes. Maddin on 5329 6221 or by email
[email protected] COUNCIL PO Box 141 P. (07) 5329 6500 [email protected]
: ara TEWANTIN QLD 4565 F. (07) 5329 6501 Www.noosa.qid.gov.au
Page 58 of 100See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.