7.4 ASS Investigation Results A total of 32 samples were recovered and assessed by pH field screen analyses. Existing soil pH (pHF) ranged from 6.5 to 11, indicating mostly alkaline to slightly acidic conditions are present at the site. It is noted that the alkaline conditions may be a result of previous ASS treatment of the fill materials (i.e. addition of lime during the canal construction works), which was also evidenced by Acid Neutralising Capacity (ANC) being present in all of the quantitative laboratory test results. Quantitative laboratory analyses were completed on six samples using the Chromium Reducible Sulfur (SCR) suite of testing to quantify the severity and nature of any acidity or potential acidity present in the soil profile. Actual acidity was assessed using Titratable Actual Acidity (TAA), and potassium-chloride extractable sulfur (SKCl) was used to assess the nature of the measured actual acidity. Potential acidity was measured by the CRS method which specifically measures inorganic oxidisable sulfur. These methods are set out in the QASSIT guidelines and associated ASS management documents. Based on the nature of the proposed disturbance, an action criterion of 0.03%S (18 mol H+ per tonne) was adopted for comparison with the combined actual and potential acidity results. It is noted that the potential acidity exceeded the action criteria in two of the six samples tested, both of which were in existing fill materials recovered from borehole BH1. However, all of the samples tested returned ANC values exceeding the combined net acidity, which is inferred to be due to previous ASS treatment. The combined actual and potential acidity therefore did not exceed the action criteria in any samples. ASS laboratory test results are summarised in Table B1 in Appendix B along with laboratory certificates. 7.5 Risk Characterisation Laboratory test results indicate that the site soils above 4 m BGL have minimal acid generating capacity given that the existing ANC levels exceeded the net acidity levels. As such, these soils do not require specific management strategies under Queensland’s ASS legislation and guidelines. An ASS management plan is therefore not required, and no lime treatment is necessary for soils above 4 m BGL. Should excavations exceeding 50 m3 extend below 4 m BGL, Tectonic should be notified to assess the implications associated with ASS and treatment strategies. 7.6 Water Quality Management Erosion and sediment control measures are expected to be applied in accordance with current industry best practice to contain and control site runoff waters during construction. Water collected by dewatering works and from other site areas is to be contained, tested and treated (if necessary) prior to discharge off-site or re-use on-site. Uncontrolled discharge of water from excavation areas, or exposed works areas must not be allowed to occur. If discharge from the site is required, performance criteria detailed in Table 6 overleaf below must be met prior to release. Geo-environmental Investigation Proposed Residence 11 March 2025 | 25040-001-Rev0 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geo-environmental Investigation.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.