5. Existing trees on the site and within road reserves are to be retained, except
where required to be removed due to building operations or the conduct of the
approved use.
Land Development
Roof Water & Stormwater Drainage
6. Roof runoff from the new roofed areas and any new surface runoff shall be
directed to the existing stormwater disposal system for the site.
Sewer Mains
7. To ensure Council’s sewer main is accessible for maintenance purposes and is
protected from risk of damage no structures requiring a building permit (eg.
buildings, roof overhangs, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever
is the greater. In this regard the existing sewer main that traverses the site at the
rear and the ‘zone of influence’ (taken as the area within a 45-degree angle
measured from the invert of the sewer main to the finished surface level) shall be
accurately located, determined and marked on site by a licensed Surveyor.
Erosion and Sediment Control
8. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel
access to the site and controlled disposal of waste, will be necessary.
Contributions Towards Council Infrastructure
9. Monetary contributions shall be paid to Noosa Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the
time of payment. An estimate only of the contribution amounts under the current
Council policies and requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $340
PSP16 – Sewerage Headworks Contributions $664
PSP17 – Water Supply Headworks Contributions $769
PSP20 – Pathway Trunk Network Contributions $343
TOTAL Contribution Amount = $ 2,116
Please note, that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from June 2007 until the date of payment.
All contributions must be paid prior to the commencement of the use.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%.
Should the contributions not be paid at the due time, Council shall call upon the
trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given
for the bonding of contributions will incur an administration fee in accordance with
Council’s Land Development Commercial & Regulatory Fees at the time of
lodgement.
In the event that the Development Permit for Material Change of Use of Premises
lapses or is cancelled, the trading bank guarantee will be returned.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council Decision - Changes - old apps - 005.1989.00000112.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15 KB (small file)
- File type
No other editions are linked here.