5.      Existing trees on the site and within road reserves are to be retained, except
        where required to be removed due to building operations or the conduct of the
        approved use.
Land Development
Roof Water & Stormwater Drainage
6.      Roof runoff from the new roofed areas and any new surface runoff shall be
        directed to the existing stormwater disposal system for the site.
Sewer Mains
7.      To ensure Council’s sewer main is accessible for maintenance purposes and is
        protected from risk of damage no structures requiring a building permit (eg.
        buildings, roof overhangs, raised terraces, etc) shall be constructed within this
        ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever
        is the greater. In this regard the existing sewer main that traverses the site at the
        rear and the ‘zone of influence’ (taken as the area within a 45-degree angle
        measured from the invert of the sewer main to the finished surface level) shall be
        accurately located, determined and marked on site by a licensed Surveyor.
Erosion and Sediment Control
8.      Any person acting on this permit shall prevent erosion and sediment export from
        leaving the site. Site control measures such as silt fencing, controlled gravel
        access to the site and controlled disposal of waste, will be necessary.
Contributions Towards Council Infrastructure
9.      Monetary contributions shall be paid to Noosa Council towards the cost of
        providing and/or upgrading various infrastructure at the rates applicable at the
        time of payment. An estimate only of the contribution amounts under the current
        Council policies and requirements is outlined in the table below:

         Contribution Required For:                                              Amount:
         PSP12 – Public Open Space Contributions (Park)                          $340
         PSP16 – Sewerage Headworks Contributions                                $664
         PSP17 – Water Supply Headworks Contributions                            $769
         PSP20 – Pathway Trunk Network Contributions                             $343
         TOTAL Contribution Amount =                                             $ 2,116
         Please note, that these amounts are all subject to variations in the Consumer Price Index,
         All Groups Brisbane from June 2007 until the date of payment.
        All contributions must be paid prior to the commencement of the use.
        Alternatively a trading bank guarantee shall be submitted to Council plus 20%.
        Should the contributions not be paid at the due time, Council shall call upon the
        trading bank guarantee in full.
        Processing of bonds for security where specific Council approval has been given
        for the bonding of contributions will incur an administration fee in accordance with
        Council’s Land Development Commercial & Regulatory Fees at the time of
        lodgement.
        In the event that the Development Permit for Material Change of Use of Premises
        lapses or is cancelled, the trading bank guarantee will be returned.




     Award Winner - Australian Clean Beach
       Challenge 2004 Litter Prevention

Used in these records

About this file

File size
15 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council Decision - Changes - old apps - 005.1989.00000112.002 [As Published].pdf · 15 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.