Original source · versioned page text
Amended Landscape Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn15 JIRRIMA CRES, COOROIBAH Re abilitation OP Plan Oct 2021 INFORMATION REQUEST DATED 15.12.21 - TABLE OF RESPONSES ISSUE 1 REFER TO ECOLOGICAL REPORT Doc ISSUE 2 REFER TO LD2 & LD3 WHICH INCLUDES DETAILED INFORMATION ON LD2 THE 'EXISTING VEGETATION OUTSIDE OF RIPARIAN ZONE' AND THE LD3 VEGETATION MANAGEMENT THAT IS PROPOSED WITHIN THOSE ZONES ISSUE 3 LD1 SHOWS THE TWO RIPARIAN BUFFER ZONE AREAS AS VEGETATION LD1 PROTECTION COVENANT ISSUE 4 FENCE UPDATED ON LP1 & LP2 TO SPECIFY FAUNA FRIENDLY FENCE. LP1 DETAIL INCLUDED ON LD3 LP2 ISSUE 5 REFERENCING TYPO UPDATED LD4 RIPARIAN ZONE 2. RIPARIAN ZONE 1. ISSUE 6 OFFSET TREES POT SIZE UPDATED TO SHOW 45L LD4 COVENANT AREA B COVENANT AREA A ISSUE 7 PLANT SPACING UPDATED TO REFLECT RFI RECOMMENDATION LD4 44 ISSUE 8 PLANT SUBSTITUTIONS UPDATED AS PER RECOMMENDED COUNCIL RFI LD4 RP136462 ISSUE 9 SPECIFICATION NOTES UPDATED AS PER COUNCIL RFI LD2 The following landscape operational works plan package consists of the following schedule of drawings; LD1 eneral Notes LD2 eneral Notes LD3 Finis es Sc edule aintenance Notes Typical etail LD4 Plant Sc edules LP1-2 andscape Plans This package has been developed to comply with; JIRRIMA CRESCENT LOT 2 LOT 1 P 21 0040 101 SP191688 LP2 LP1 Noosa Plan 2020 Invasive Plants isted in t e Biosecurity Act 2014 Noosa Biosecurity Plan 2020 Sources; CA con Surveying To n Planning Sample Approvals; · Furnis A it follo ing samples for A approval prior to construction; EMT A Composted Forest itter EMT A SP156380 100 SP156380 RESIDENTIAL LAND OUTSIDE OF RIPARIAN ZONE 11 10 SP156380 SP156380 15 JIRRIMA CRES, COOROIBAH, QLD SHEET KEY LAYOUT N.T.S SITE LOCATION N.T.S Lot 43 RP 136461 Client Project NORTH TITLE: JOB No.: S21091111 anembo consultants FILE: 220119 Rhiana Magee 15 Jirrima Cr, Cooroibah C 19.01.22 COUNCIL RFI CK TH DWG. No. LD1 Landscape Architects Environmental Project Management This document is the copyright of anembo consultants & shall LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH SHEET 1 OF 6 anembo consultants pty.ltd. Sunshine Coast: PO Box 24 A.B.N. 75 089 473 156 Moffat Beach QLD 4551 not be copied without written approval, nor shall it be used except for the development and the site specified. Scale & OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH - Ph: 07 5437 0000 can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 GENERAL NOTES -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
T ice eekly during prolonged rain
PROJECT SPECIFICATIONS · All stockpiles are to be protected it suitable erosion control devices graded to TREE PROTECTION MEASURES OPERATIONS - DISTURBED AREAS
This plan has been developed to comply with the Noosa Shire Council ensure control of runoff · T e follo ing tree protection measures must at all times be ad ered to during any · Identify eeds If unsure consult A All ot er vegetation to be protected and
Planning Scheme as applicable where practical · Coordinate installation of sediment erosion control devices it civil contractor to on site orks generally in accordance it AS49 0 2009 protection of trees on retained
ABBREVIATIONS ensure compatibility consistency in control measures development sites A ill advise ere measures are required at Pre start but is · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
AS Australian Standard ot dipped · All e posed surfaces once completed s all be immediately stabili ed to prevent generally to standard s of e isting trees t at are s o n as re abilitation areas · ecompact ground and cultivate to 5mm deep
EP Establis ment Period A andscape Arc itect erosion · Prior to commencement of orks t e contractor to organise a pre construction · rade ground surface to create smoot falls a ay from pat s ere necessary
N A Not applicable OC On centre meeting to identify trees for protection removal and or pruning · Remove all ant ropogenic rubbis
P aintenace Period m2 Square metres EDGING · Protective fencing is to be installed around t e tree protection one generally in · Obtain a report by a qualified person identifying at tree maintenance measures
m3 Cubic etres T P Typical Spade Edge accordance it AS49 0 2009 prior to site establis ment and remain intact and are required and utili e a qualified person to conduct t e orks
NATA National Association of Testing Aut orities S PER Superintendent · Install Spade Cut edge as located on plans as per detail monitored and certified by t e project arborist until completion of orks · op dead dying or dangerous limbs or trees as required to remove risk of injury to
uPVC nplasticised polyvinyl C loride Pipe NSC Noosa S ire Council · Refer to etail for protective fencing specifications users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
B ater by esign AO andscape Assessment Officer REHABILITATION AREAS · Any orks it in t e tree protection one to be supervised by t e project arborist ground surface it in regeneration ones at least 5 meters from pat s and ot er
Soil · Activities it in t e tree protection one are to be aut orised and supervised by t e infrastructure
PROJECT PLANNING CONDITIONS - DEMONSTRATION OF COMPLIANCE · Civil engineering eart ork operations ill ave arvested stockpiled site topsoils project arborist No compaction from ve icles pedestrian movement stockpiling of · All felled vegetation is to be retained on site resultant mulc is to be used in
· Apart from declared eeds all e isting vegetation s all be retained as been andscape contractor to coordinate it civil contractor to ensure topsoil is top soil e cavation no dumping of aste or cutting it in t e root one s is to revegetation landscaping or soil stabilisation activities
identified it retention protection measures for suc are nominated erein re installed per t e follo ing specifications in respective landscape areas occur · Add 100mm ulc to all disturbed areas
· Identified areas are confined to areas of eed management t ose nominated on · Clear remove all non organic deleterious and large organic matter suc as rocks · Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e
t ese plans it associated orks described erein greater t an 40mm diameter tree roots trunks limbs and stumps from all areas to project arborist to ensure t at t e correct arboreal tec niques are utilised OPERATIONS - UNDISTURBED AREAS
· Plant sc edules are as per; be landscaped · Identify eeds If unsure consult A All ot er vegetation to be protected and
· E cavate and remove off site any remaining fill to turf and garden areas to ensure VEGETATION MANAGEMENT PROTECTION PROGRAM
retained
correct dept s for topsoils · Treat all eeds and pasture grasses Refer to eed Removal Sc edule
RE 12 3 4 Issue Vegetation management - clearing & protection
All required species substitutions are to be confirmed in riting · andscape contractor to conduct soils analyses tests to stockpiled topsoils and · Remove all ant ropogenic rubbis
from council s parks branc prior to t e commence of any landscape ork ameliorate per recommendations prior to re spreading Furnis la it results · op dead dying or dangerous limbs or trees as required to remove risk of injury to
andscape contractor to allo for for p balancing nutrient ameliorations all soil Objective Identify areas of vegetation individual trees to be
protected retained it in t e development areas t ose users of t e area Cut up aste material into 1 2 meter lengt s and place flat on
testing to be conducted by a lab accredited by NATA ground surface it in regeneration ones at least 5 meters from pat s and ot er
to be cleared
Ensure t at orkers understand t e requirements of infrastructure
Cultivate · All felled vegetation is to be retained on site mulc is to be used in revegetation
PROJECT DESCRIPTION · Cultivate ground in all disturbed areas to a dept ere possible to 5mm dept for
protection retention install protective devices to
THIS WORK COMPRISES OF; ensure no accidental damage occurs landscaping or soil stabilisation activities
inspection before installation of soil re ab Ensure t at clearing met ods are appropriate for areas · Identify location for supplement planting for canopy integrity
· Avoiding any root systems being cleared especially in t e vicinity of areas to be
1) CONSTRUCTION WORKS: WEED REMOVAL SCHEDULE
a Retaining associated drainage protected
Mulch Ensure t at t e ork program is suc as to minimise t e Task Operation Frequency
b Installation of slope drainage stabilisation products
· Organic and inorganic mulc es are required to be installed over all garden areas time bet een en clearing occurs t e cleared ground Remove entire plant by and Alternatively kill Follo ing
c Tree protection fencing Herbaceous plant it erbicide application using ick iper identification of
ere s o n on t e dra ings is stabilised to reduce t e c ances of silt movement
· All mulc es supplied must be clean free from live eeds eed seeds specifically Ensure t at cleared material is mulc ed or ood c ipped and small or ooded spray no le For erbaceous eeds eeds As
REHABILITATION OF EXISTING VEGETATION WORKS; as appropriate or disposed of in an approved manner weed control cut or scrape stem and paint it 1:1 mi of required to kill
nutsedge pests soil borne viruses and diseases Furt er S PER it certifications
a Installation of supplementary trees s rubs to improve canopy e tent glyp osate and ater eeds
respectively for approval prior to installations
bio diversity Ensure vegetation to be retained is correctly identified rill and fill or frilling erbicide is delivered into Follo ing
ulc types include: Tasks
· Forest Blend ulc 100mm dept to all revegetation areas clearly marked protective devices are installed sap ood via drilled oles or frill cut pockets identification of
Large and
REVEGETATION OF DEGRADED LAND; maintained in functional condition
· Supply install to s ale areas a layer of 50 100mm gravel spalls to 150mm dept woody weed immediately after ound is made If eeds As
a Installation of supplementary trees s rubs to create ne canopy and Vegetation to be retained protected s all be as accessibility permits cut stump met od Cut required to kill
control
increase bio diversity nominated per plan field adjusted on site by la tree 30mm above ground and paint stump it eeds
TUBESTOCK PLANTING, SETOUT & TREE GUARD
Protection fence s all be used to protect vegetation undiluted glyp osate
· Bamboo stake setout of trees and s rubs for approval by S PER nominated for retention Fence to be as per detail
2) VEGETATION MANAGEMENT & PROTECTION;
· Setout to be staggered and random to account for terrain variation and replicate Remove aste material containing flo ers or Follo ing
Remove or seeds or eed species from site t at can s oot
natural c aracter Integrity of protection devices identification of
3) WEED MANAGEMENT - CONSTRUCTION PHASE Performance manage
· Install tubes per re abilitation sc edules densities specifications details Retained vegetation trees retained in good ealt it
from pieces of plant ispose of at approved eeds As
a eed management under e isting canopy of all oody oods and indicators vegetative facility aste material to be covered en
· Install tree guard in nominated location as per detail no scars from eart orks mac inery waste
required to kill
reduction of erbaceous grassy eeds removing from site
· aintain as per sc edule eeds
andscape contractor to ater plantings during construction period eekly inspection log by responsible person
4) WEED & LANDSCAPE MANAGEMENT - MAINTENANCE PHASE Frequency
VEGETATION PERFORMANCE OBJECTIVES - Criteria applies to tubestock planting · ere furt er detail is required follo industry standards and met odologies or
contact S PER
1. CONSTRUCTION WORKS Trees: At end of 12 month At end of 2 yr 3 Yr Off Responsible person for contractor reporting to super
Responsible
PRELIMINARIES Criteria establishment establishment maintenance
· Refer to plans by ot ers for all services locations footpat orks levels ot er t an
person WEED MANAGEMENT - MAINTENANCE PHASE
and maintenance and maintenance Objective · T is plan as been developed to specify regeneration operations for t e e isting
t ose indicated on t ese plans boundaries All services related infrastructure ont ly for eac separable portion of contract to site
period period Reporting riparian one
including street lig ting s o n on t ese plans are indicative only construction manager
Percentage of 95% 90% 85% · NOTE: T e regeneration plan must be read in conjunction it t e operational orks
· Call dial before you dig 11 00 prior to any excavation.
plants alive ake good or replace any damage to trees or vegetation landscaping decision notice and site environmental management plan
· Plan dimensions take precedence over scaled dimensions Corrective
and healthy t at are marked for protection and retention; reinstate
· Prior to commencing construction orks verify in t e field dimensions levels action
protective devices OBJECTIVES
location of site services refer engineer s dra ings generally Average height 1000mm 2000mm 3000mm
1 To en ance t e ecological value of t e locality
· Contractor to revie all sc edules erein to confirm t eir correlation to t ese plans
Shrubs: At end of 12 month At end of 12 month Off 2 To remove eeds and minimise future incursion
ere discrepancies occur it in landscape documentation refer to A prior to WEED MANAGEMENT - CONSTRUCTION PHASE
Criteria establishment establishment maintenance 3 Encourage natural recruitment and regeneration
provision of tender pricing or construction · T is plan as been developed to specify regeneration operations for t e e isting
and maintenance and maintenance Objective 4 Re abilitate degraded areas
· All proposed fence alignments e cept vegetation protection fencing are to be riparian one
period period 5 Satisfy t e recreational requirements of residents as ell as t e ecological
pegged by a licensed surveyor in coordination it project surveyor · NOTE: T e regeneration plan must be read in conjunction it t e operational orks requirements of a flora and fauna reserve
Percentage of 95% 90% 85% landscaping decision notice and site environmental management plan
SEDIMENT & EROSION CONTROL plants alive
· From practical completion all maintenance activities as per follo ing sc edule need
· ere applicable T e landscape contractor to implement maintain for t e and healthy OBJECTIVES to be conducted until project completion
contract duration best practice erosion sediment control measures in accordance 1 To en ance t e ecological value of t e locality
it t e manual for erosion sediment control maroon manual good Average height
400mm 1000mm 1200mm 2 To remove eeds and minimise future incursion
environmental practice t e consulting civil engineers specification for erosion or width
3 Encourage natural recruitment and regeneration
sediment control Penalties fines for non compliance ill apply 2. RIPARIAN ZONES A & B 4 Re abilitate degraded areas
· Install silt control fencing in accordance it site environmental management plan 5 Satisfy t e recreational requirements of residents as ell as t e ecological
local aut ority regulations VEGETATION MANAGEMENT & PROTECTION
requirements of a flora and fauna reserve
· Sediment erosion control devices to be installed ere necessary as directed on · Native vegetation e ists on site In order to ma imise t e retained ecological values
site by super for t e site nominated e isting vegetation requires protection management
· Natural vegetation regeneration needs to be encouraged PRELIMINARIES
· All sediment erosion control devices are to be installed in accordance it · Before ork commences t e S PER is to organise a pre start meeting it t e
manufacturer s specifications · Site eed removal is important to allo regeneration
· Vegetation to be protected is plan nominated predominately native species in a landscape arc itect and NSC environment landscape officer to establis scope of
· T e contractor is responsible for ensuring sediment erosion control devices are orks management procedures and clarify any issues
inspected maintained ealt y safe condition t at are not located so as to interfere it required
approved site orks · ere any discrepancies occur refer to A
· T e follo ing table summari es t e vegetation management program elements;
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 220119
Rhiana Magee 15 Jirrima Cr, Cooroibah C 19.01.22 COUNCIL RFI CK TH DWG. No. LD2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH SHEET 2 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 GENERAL NOTES -
Page 3
3. RESIDENTIAL LANDSCAPE ZONE VEGETATION RIPARIAN BUFFER AREA & WATERWAY AS PER NOOSA PLAN 2020 INTERACTIVE MAPS
3x Tube dia.
MANAGEMENT & PROTECTION
· T is plan as been developed to specify vegetation management for t e e isting
vegetation outside of Riparian one TUBESTOCK PLANT, REFER TO PLANT
· NOTE: T e landscape plan must be read in conjunction it t e operational orks SCHEDULE FOR SPECIES
landscaping decision notice and Ecological Assessment Report
FORM SHALLOW SAUCER SHAPED
DEPRESSION AROUND PLANT BASE
OBJECTIVES
1 To en ance t e ecological value of t e locality 100mm DEEP ORGANIC MULCH PER AS
SPECIFIED. KEEP MINIMUM 50mm
2 To remove eeds and minimise future incursion
CLEAR OF PLANT STEM. DO NOT
3 Encourage natural recruitment and regeneration MULCH BIO-AREA MEDIA SAND.
4 Re abilitate degraded areas
5 Satisfy t e recreational requirements of residents as ell as t e ecological
requirements of a flora and fauna reserve 15 JIRRIMA CR CULTIVATED SUBGRADE TO 150mm
PRELIMINARIES TOPSOIL AS SPECIFIED
· Before ork commences t e S PER is to organise a pre start meeting it t e
landscape arc itect and NSC environment landscape officer to establis scope of
orks management procedures and clarify any issues 5 gram 'AGRIFORM' TABLET - USE
PHOSPHORUS FREE TABLETS FOR
ere any discrepancies occur refer to A CALLISTEMONS & GREVILLEAS
SUBGRADE
VEGETATION MANAGEMENT & PROTECTION
· Native vegetation e ists on site In order to ma imise t e retained ecological values
for t e site nominated e isting vegetation requires protection management
· Natural vegetation regeneration needs to be encouraged
· Site eed removal is important to allo regeneration 1 TUBESTOCK PLANTING
WEED DISTRIBUTION TABLE:
· Vegetation to be protected is plan nominated predominately native species in a T e follo ing eed istribution table lists of eeds found on site priority control LP3 Typical Section N.T.S.
ealt y safe condition t at are not located so as to interfere it required recommendations and occurance of eeds Refer to Planting Plans for Weed
approved site orks Locations.
TREE PROTECTION MEASURES
VEGETATION RETENTION & REVEGETATION AREAS ANNUAL MAINTENANCE REGIME
· T e follo ing tree protection measures must at all times be ad ered to during any
on site orks generally in accordance it AS49 0 2009 protection of trees on TASK FREQUENCY PERFORMANCE INDICATOR
development sites A ill advise ere measures are required at Pre start but is Brushcutting / Every 2 eeks from October arc Regenerating plants and C C
generally to standard s of e isting trees t at are s o n as re abilitation areas Slashing Every 4 eeks from April September revegetation areas free from 4000mm max
· Prior to commencement of orks t e contractor to organise a pre construction competition it grass Remove
meeting to identify trees for protection removal and or pruning trim over anging branc es
· Protective fencing is to be installed around t e tree protection one generally in t at interfere it brus cutting
accordance it AS49 0 2009 prior to site establis ment and remain intact and slas ing
monitored and certified by t e project arborist until completion of orks Weeding - by Every eek during inimal regro t of eeds No
· Refer to etail for protective fencing specifications hand Establis ment Period Every competition from unc ecked
· Any orks it in t e tree protection one to be supervised by t e project arborist 2 eeks during aintenance eed and grass regro t
· Activities it in t e tree protection one are to be aut orised and supervised by t e Period beyond Remove all no ious ig risk 50 x 50 Star picket Post
project arborist No compaction from ve icles pedestrian movement stockpiling of environmental eeds
top soil e cavation no dumping of aste or cutting it in t e root one s is to Spraying / Every 2 eeks from October No eeds or grass of greater
1500mm High
occur Wick Wiping arc Every 4 eeks from eig t t an plant it in 500mm
· Any orks carried out beneat t e canopy s of t e tree is to be supervised by t e April September se a of plants Remove all no ious
project arborist to ensure t at t e correct arboreal tec niques are utilised Pre emergent erbicide if site is ig risk environmental eeds
eavily eed infested C eck mo ing edge around site
600mm
OPERATIONS - DISTURBED AREAS re spray if required
· Identify eeds If unsure consult A All ot er vegetation to be protected and Re-mulching Allo to carry out at least once during niform 100mm deep to
retained aintenance Period t en once per suppress eed gro t Plain Wire (no barb)
· Treat all eeds and pasture grasses Refer to eed Removal Sc edule year maintain soil moisture
· ecompact ground and cultivate to 5mm deep Every 2 or 3 days during Plants e ibit ealt y gro t
Watering
· rade ground surface to create smoot falls a ay from pat s ere necessary Establis ment Period every eek no signs of ater stress
· Remove all ant ropogenic rubbis during aintenance Period or as 300mm off ground lvl
· Obtain a report by a qualified person identifying at tree maintenance measures required to maintain adequate soil
are required and utili e a qualified person to conduct t e orks moisture
· op dead dying or dangerous limbs or trees as required to remove risk of injury to Fertilising As required ere en plants are Plants e ibit ealt y gro t
users of t e area Cut up aste material into 1 2 meter lengt s and place flat on not responding to slo release no signs of ater stress
ground surface it in regeneration ones at least 5 meters from pat s and ot er fertiliser applied at planting Allo to
infrastructure fertilise once during aintenance
· All felled vegetation is to be retained on site resultant mulc is to be used in Period
2 FAUNA FRIENDLY FENCE
revegetation landscaping or soil stabilisation activities Storm Damage Follo ing storm event eavy rainfall Any damage noted rectified
LP3 Typical Section N.T.S.
· Add 100mm ulc to all disturbed areas Inspection or ig inds
Pruning & To promote ealt y plant gro t Plants ave desired natural
OPERATIONS - UNDISTURBED AREAS Plant ont ly during Establis ment form display ealt y gro t
· Identify eeds If unsure consult A All ot er vegetation to be protected and Maintenance Period Every 3 mont s during Remove vines from young
retained aintenance Period beyond plants FINISHES SCHEDULE
· Treat all eeds and pasture grasses Refer to eed Removal Sc edule CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
· Remove all ant ropogenic rubbis Rubbish As required or after flood event All litter removed disposed of
Top Soil Soil preparation Smoot uniform eed free
properly off site Organic flood Ameliorated site topsoil: Refer to
· op dead dying or dangerous limbs or trees as required to remove risk of injury to Top soil As per Specification per plan topsoil mulc surfaces it no As supplied
debris in trees it in reac specifications
users of t e area Cut up aste material into 1 2 meter lengt s and place flat on nominated areas deleterious materials
en standing to be removed
ground surface it in regeneration ones at least 5 meters from pat s and ot er spread on site niform finis 100mm deep free of deleterious
infrastructure FB Organic Street Tree garden pt and gardens 25mm composted materials Install pinned coir mes over bio retention As supplied
· All felled vegetation is to be retained on site mulc is to be used in revegetation Supplementary As required Replace dead dying ulc Composted Forest itter basic mulc areas project entry batter and
landscaping or soil stabilisation activities Planting damaged or stolen plants storm ater overland flo pat lo flo s ales
Identify location for supplement planting for canopy integrity
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 220119
Rhiana Magee 15 Jirrima Cr, Cooroibah C 19.01.22 COUNCIL RFI CK TH DWG. No. LD3
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH
SCHEDULE OF
FINISHES,
SHEET 3 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH SPECIFICATION NOTES - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 & TYPICAL DETAIL -
Page 4
PLANT SCHEDULE 1 PLANT SCHEDULE 2 PLANT SCHEDULE 3
REHABILITATION ZONE 1 REHABILITATION ZONE 1 - NATIVE LOMANDRA EDGE REHABILITATION ZONE 2
- Trees Rehabilitation - Total Approx Area: 390 m² - Trees Rehabilitation
- RE 12.3.4 - RE 12.3.4
- Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium - Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium
- Total Approx Area: 2529 m² Code GENUS species - Common Name Quantity - Total Approx Area: 1167 m²
Groundcover 1 m2
Code GENUS species - Common Name Quantity O ys O AN RA ystri 390 Code GENUS species - Common Name Quantity
TOTAL 390
Trees @ 1/25m² Trees @ 1/25m²
A lit A OCAS ARINA littoralis Black S eoak 1 A lit A OCAS ARINA littoralis Black S eoak 8
CAS gla CAS ARINA glauca S amp s e oak 1 CAS gla CAS ARINA glauca S amp s e oak 8
E C rob E CA PT S robusta S amp a ogany 1 E C rob E CA PT S robusta S amp a ogany 8
OP sua OP OSTE ON suaveolens 1 OP sua OP OSTE ON suaveolens 8
E qui E A E CA quinquenervia Broad leaved Paperbark 1 E qui E A E CA quinquenervia Broad leaved Paperbark 8
E sal E A E CA salicina illo Bottlebrus 1 E sal E A E CA salicina illo Bottlebrus 8
TOTAL 102 TOTAL 48
PLANT SCHEDULE 4 PLANT SCHEDULE 5 PLANT SCHEDULE 6
REHABILITATION ZONE 2 - NATIVE LOMANDRA EDGE REHABILITATION ZONE 3 REHABILITATION ZONE 3 - NATIVE LOMANDRA EDGE PLANT SCHEDULE 7
REHABILITATION ZONE 3 - NATIVE LOMANDRA EDGE
- Total Approx Area: 90 m² - Trees & Understorey Rehabilitation - Total Approx Area: 16 m²
- RE 12.3.4 - Total Approx Area: 13 m²
- Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium
Code GENUS species - Common Name Quantity - Total Approx Area: 1701 m² Code GENUS species - Common Name Quantity
Code GENUS species - Common Name Quantity
Groundcover 1 m2 Groundcover 1 m2
O ys O AN RA ystri 90 Code GENUS species - Common Name Quantity O ys O AN RA ystri 1 Groundcover 1 m2
TOTAL 90 TOTAL 16 O ys O AN RA ystri 13
Trees @ 1/25m² TOTAL 13
A lit A OCAS ARINA littoralis Black S eoak 11
CAS gla CAS ARINA glauca S amp s e oak 11
E C rob E CA PT S robusta S amp a ogany 11
OP sua OP OSTE ON suaveolens 11
E qui E A E CA quinquenervia Broad leaved Paperbark 11
E sal E A E CA salicina illo Bottlebrus 11
TOTAL 66
OFFSET TABLE
OFFSET RATIO TREES REMOVED TREES OFFSET AREA OF OFFSET
SOUTHERN
1:1 5 5
TREE OFFSET PLANTING BOUNDARY
RE 12 3 4 PLANT SCHEDULE 8
Open forest to oodland of elaleuca quinquenervia and - RE 12.3.4
Eucalyptus robusta Occurs fringing drainage lines and on - Melaleuca quinquenervia, Eucalyptus robusta woodland on coastal alluvium
floodplains in coastal areas BV 1 : 22a
Code GENUS species - Common Name Size Quantity
Trees @ 1/25m²
E qui E A E CA quinquenervia 45 5
TOTAL 5
Client Project TITLE: JOB No.: S21091111
anembo consultants
FILE: 220119
Rhiana Magee 15 Jirrima Cr, Cooroibah C 19.01.22 COUNCIL RFI CK TH DWG. No. LD4
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH SHEET 4 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH - Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 PLANT SCHEDULES -
Page 5
LEGEND
EXISTING VEGETATION OUTSIDE OF
RIPARIAN ZONE
Refer to Plans & Notes
REHABILITATION ZONE 1 E ISTIN FOREST ANA E ENT AREA 1
Refer to Plans, General Notes & Planting Schedule
EE CONTRO RE IRE
N RT RE OF E ER IN NATIVE RE RO T
REHABILITATION ZONE 2 ONITOR ANA E AREA
Refer to Plans, General Notes & Planting Schedule
REHABILITATION ZONE 3
Refer to Plans, General Notes & Planting Schedule CENTRE INE OF CREE ATER A
PROPERT BO N AR
EXISTING FOREST MANAGEMENT AREA 1
Refer to Plans, General Notes & Planting Schedule
F1
EXISTING FOREST MANAGEMENT AREA 2
OT BO N AR
Refer to Plans, General Notes & Planting Schedule
EXISTING FOREST MANAGEMENT AREA 3 F1
Refer to Plans, General Notes & Planting Schedule
EXISTING FOREST MANAGEMENT AREA 4
Refer to Plans, General Notes & Planting Schedule
F1
FAUNA FRIENDLY FENCE.
F1 3 STRAND WIRE (NO BARB). BOTTOM WIRE
300mm OFF GROUND LEVEL
TREES TO BE REMOVED
Refer to Plan & Notes
F1
TREES OFFSET
Refer to Plan, Detail, Notes, Plant Schedule 4
& Finishes Schedule NATIVE RASS E E 2m I T
REFER TO P ANT SC E E2
RIPARIAN BUFFER AREA
Refer to Plans & General Notes
RE ABI ITATION ONE 1
REFER TO P ANT SC E E1
F1
CENTRE LINE OF CREEK WATERWAY
Refer to Plans & General Notes
PROPERTY BOUNDARY FA NA FRIEN FENCE
Refer to Plans & General Notes 3 STRAN IRE NO BARB
F1
IT BOTTO IRE IN
OT 2 OT 1
300mm OFF RO N V
IRRI A CR
F1
F1
F1
F1
F1
1 E qui 1 E qui 1 E qui 1 E qui 1 E qui
VE ETATION PROTECTION COVENANT
F1
F1
E TA PROPOSE RAVE RIVE A
PROPERT BO N AR
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 220119
Rhiana Magee 15 Jirrima Cr, Cooroibah C 19.01.22 COUNCIL RFI CK TH DWG. No. LP1
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH
0 2.5 5 7.5 10 12.5 SHEET 5 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH SCALE 1:500 @ A3 SCALE 1:250 @A1 Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCALE 1:500 @A3
Page 6
LEGEND
EXISTING VEGETATION OUTSIDE OF
PROPERT BO N AR RIPARIAN ZONE
Refer to Plans & Notes
REHABILITATION ZONE 1
Refer to Plans, General Notes & Planting Schedule
FA NA FRIEN FENCE
3 STRAN IRE NO BARB IT BOTTO REHABILITATION ZONE 2
IRE IN 300mm OFF RO N V Refer to Plans, General Notes & Planting Schedule
F1
ATER A
REHABILITATION ZONE 3
VE ETATION PROTECTION COVENANT Refer to Plans, General Notes & Planting Schedule
EXISTING FOREST MANAGEMENT AREA 1
F1
Refer to Plans, General Notes & Planting Schedule
RE ABI ITATION ONE 2
EXISTING FOREST MANAGEMENT AREA 2
REFER TO P ANT SC E E3 Refer to Plans, General Notes & Planting Schedule
NATIVE RASS E E 2m I T
F1
EXISTING FOREST MANAGEMENT AREA 3
REFER TO P ANT SC E E4 Refer to Plans, General Notes & Planting Schedule
EXISTING FOREST MANAGEMENT AREA 4
Refer to Plans, General Notes & Planting Schedule
E ISTIN FOREST ANA E ENT AREA 2
EE CONTRO RE IRE
F1
N RT RE OF E ER IN NATIVE RE RO T FAUNA FRIENDLY FENCE.
F1 3 STRAND WIRE (NO BARB). BOTTOM WIRE
ONITOR ANA E AREA 300mm OFF GROUND LEVEL
TREES TO BE REMOVED
Refer to Plan & Notes
F1 TREES OFFSET
Refer to Plan, Detail, Notes, Plant Schedule 4
& Finishes Schedule
RIPARIAN BUFFER AREA
Refer to Plans & General Notes
CENTRE LINE OF CREEK WATERWAY
RE ABI ITATION ONE 3 Refer to Plans & General Notes
REFER TO P ANT SC E E 5
F1
OT 2
PROPERTY BOUNDARY
Refer to Plans & General Notes
NATIVE RASS E E 2m I T
REFER TO P ANT SC E E
F1
PROPOSE S E
E ISTIN FOREST ANA E ENT AREA 3 PROPOSE PRINCIP E RESI ENCE
EE CONTRO RE IRE
F1
N RT RE OF E ER IN NATIVE RE RO T
ONITOR ANA E AREA
NATIVE RASS E E 2m I T
REFER TO P ANT SC E E
PROPOSE RAVE RIVE A
E ISTIN FOREST ANA E ENT AREA 4
EE CONTRO RE IRE
N RT RE OF E ER IN NATIVE RE RO T
ONITOR ANA E AREA
F1
PROPERT BO N AR
Client Project NORTH TITLE: JOB No.: S21091111
anembo consultants
FILE: 220119
Rhiana Magee 15 Jirrima Cr, Cooroibah C 19.01.22 COUNCIL RFI CK TH DWG. No. LP2
Landscape Architects
Environmental
Project Management
This document is the copyright of anembo consultants & shall
LANDSCAPE REHABILITATION B 13.10.21 COUNCIL SUBMISSION CK TH
0 2.5 5 7.5 10 12.5 SHEET 6 OF 6 anembo consultants pty.ltd.
Sunshine Coast: PO Box 24
A.B.N. 75 089 473 156
Moffat Beach QLD 4551
not be copied without written approval, nor shall it be used
except for the development and the site specified. Scale
& OPERATIONAL WORKS PLAN A 22.09.21 FOR REVIEW CK TH SCALE 1:500 @ A3 SCALE 1:250 @A1 Ph: 07 5437 0000
can not be guaranteed when printing from PDF files. email: [email protected] www.anembo.com
ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD ISSUE DATE DESCRIPTION DRWN CKD APPROVED: T Hindley ALIA 713 LANDSCAPE PLAN SCALE 1:500 @A3