Council archive · source document
Appendix C - Infrastructure Services Report · MCU23/0070
Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
TABLE OF CONTENTS
INTRODUCTION ............................................................................................................................ 1
1.1 OBJECTIVE & SCOPE .......................................................................................................... 1
SITE CHARACTERISTICS ................................................................................................................ 2
2.1 LOCATION .......................................................................................................................... 2
2.2 TOPOGRAPHY & DRAINAGE .............................................................................................. 2
STORMWATER QUANTITY ............................................................................................................ 5
3.1 LAWFUL POINT OF DISCHARGE ........................................................................................ 5
3.2 STORMWATER DISCHARGE STRATEGY ............................................................................. 5
3.3 RATIONAL METHOD CALCULATION .................................................................................. 5
3.4 EXISTING SITE XP-STORM .................................................................................................. 6
3.4.1 CATCHMENT DATA ......................................................................................... 6
3.4.2 RAINFALL DATA ............................................................................................... 6
3.4.3 HYDROLOGICAL LOSSES .................................................................................. 6
3.4.4 BX FACTOR ...................................................................................................... 6
3.4.5 EXISTING PEAK DISCHARGE ............................................................................ 6
3.5 POST-DEVELOPMENT SITE XP-STORM .............................................................................. 7
3.5.1 CATCHMENT DATA ......................................................................................... 7
3.5.2 RAINFALL DATA, HYDROLOGICAL LOSSES & BX FACTOR ............................... 8
3.5.3 DETENTION TANK ........................................................................................... 8
3.5.4 POST-DEVELOPMENT PEAK DISCHARGE ........................................................ 8
3.5.5 DETENTION TANK RESULTS ............................................................................ 9
STORMWATER QUALITY............................................................................................................. 10
4.1 CONSTRUCTION PHASE STORMWATER QUALITY MANAGEMENT ................................ 10
4.1.1 INTRODUCTION............................................................................................. 10
4.1.2 POLLUTANTS ................................................................................................. 10
4.1.3 WATER QUALITY OBJECTIVES ....................................................................... 10
4.1.4 STORMWATER QUALITY MANAGEMENT STRATEGY ................................... 11
4.1.5 MONITORING & MAINTENANCE .................................................................. 11
4.1.6 RESPONSIBILITY & REPORTING ..................................................................... 11
4.2 OPERATIONAL PHASE STORMWATER QUALITY MANAGEMENT ................................... 12
4.3 WATERWAY STABILITY MANAGEMENT .......................................................................... 12
CONCLUSION & RECOMMENDATIONS ...................................................................................... 13
DISCLAIMER ............................................................................................................................... 14
APPENDICES ............................................................................................................................... 15
▪ Appendix A – Existing Site Survey & Proposed Site Plans
▪ Appendix B – Rational Method Calculation
▪ Appendix C – XP-STORM Summary
▪ Appendix D – Concept Stormwater Plans
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Infrastructure Services Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.