Appendix C - Infrastructure Services Report · MCU23/0070

of 51

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

          INTRODUCTION
JFP Urban Consultants Pty Ltd has been commissioned by Cambooya Pty Ltd to compile this Site Based
Stormwater Management Plan (SBSMP) for the proposed development at 36 & 38 Duke Street,
Sunshine Beach (‘the site’).

The site currently contains a restaurant located fronting Duke Street. It is understood that the proposal
is for a mixed-use development comprising the existing tenancy fronting Duke Street and five
residential apartments developed above. Refer to Appendix A for the survey of the existing site and for
the proposed development plans.


1.1       OBJECTIVE & SCOPE
The design objectives for this report are:
▪     Nominate the lawful point of discharge.
▪     Ensure post-development peak flow rates are mitigated back to the pre-development peak flow
      rates via onsite detention.
▪     Confirm if the Water Quality Objectives (WQOs) in accordance with the State Planning Policy
      (2017) is applicable for the site.

The scope of investigations undertaken for this report is as follows:
▪     Nominate lawful point of discharge.
▪     Undertake hydrological and hydraulic analysis for the site using the XP-STORM 1D. This analysis
      includes the sizing of onsite detention to achieve peak flow mitigation.
▪     Provide commentary regarding possible performance-based stormwater quality management
      strategies for the operational phase of the development.

Based on the outcomes of the above investigations, this report provides recommendations, including
concept drawings for stormwater management. These recommendations should be incorporated into
future detailed design and subsequent construction documentation.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision A                        36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |1

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Infrastructure Services Report.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.