Appendix C - Infrastructure Services Report · MCU23/0070

of 51

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 22, section 1. The text section number identifies this passage in the reader.

         STORMWATER QUANTITY

3.1      LAWFUL POINT OF DISCHARGE
The lawful point of discharge for the site shall remain the existing kerb adapters discharging to Duke
Street – one on the LHS and one on the RHS of the site.


3.2      STORMWATER DISCHARGE STRATEGY
The fraction imperviousness increases due to the proposed development. The total peak discharge
rates from the site shall be maintained at or below the existing peak discharge rates for standard
storm events up to and including a 1% AEP. This is to be achieved via an aboveground tank, located on
Duke Street Ground Level. Refer to concept plans in Appendix D.

It is proposed to collect and convey a majority of the roofwater (5% AEP as per the QUDM 2016) to a
detention tank. Runoff from the driveway area adjacent to Douglas Lane is proposed to be collected
via pits and pipes sized for 1% AEP, and also conveyed to the detention tank. Mitigated outflows from
the detention tank are to be discharged on to Duke Street via the RHS kerb adapter.

A small catchment comprising of the planter area on Level 1 is proposed to discharge its stormwater
runoff directly to Duke Street via the LHS kerb adapter.


3.3      RATIONAL METHOD CALCULATION
The Rational Method Calculation has been undertaken for the existing site. Table 1 presents the
Rational Method catchment parameters. Refer to Drawings No. M3024E_DA1_SK01 in Appendix D for
the catchment plan. The fraction imperviousness has been estimated from the detailed survey
(included in Appendix A). The C10 has then been determined in accordance with Table 4.5.3 of the
QUDM (2016) and the time of concentration (Tc) based on the Standard Inlet Time in accordance with
Table 4.6.2 of the QUDM (2016).

                  Table 1 – Pre-Development Scenario Rational Method Calculation Parameters
                                                      Fraction
      Catchment              Area (ha)                                        C10                 Tc (mins)
                                                     Impervious
          EX                  0.0486                    57%                  0.82                      8

The Rational Method peak flows have been estimated based on the parameters above and the site
specific 2016 rainfall intensities obtained from Bureau of Meteorology (BOM) website. Table 2
presents the Rational Method peak flow rates for the for the existing site.

                    Table 2 – Existing Site Total Peak Discharge – Rational Method Calculation
                          Existing Site Total Peak Discharge – Rational Method Calculation (m³/s)
                63% AEP        39% AEP       20% AEP        10% AEP       5% AEP        2% AEP         1% AEP
   Existing
                  0.010          0.013         0.018          0.022        0.026         0.033             0.037
     Site




SITE BASED STORMWATER MANAGEMENT PLAN – Revision A                              36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |5

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Infrastructure Services Report.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.