STORMWATER QUANTITY
3.1 LAWFUL POINT OF DISCHARGE
The lawful point of discharge for the site shall remain the existing kerb adapters discharging to Duke
Street – one on the LHS and one on the RHS of the site.
3.2 STORMWATER DISCHARGE STRATEGY
The fraction imperviousness increases due to the proposed development. The total peak discharge
rates from the site shall be maintained at or below the existing peak discharge rates for standard
storm events up to and including a 1% AEP. This is to be achieved via an aboveground tank, located on
Duke Street Ground Level. Refer to concept plans in Appendix D.
It is proposed to collect and convey a majority of the roofwater (5% AEP as per the QUDM 2016) to a
detention tank. Runoff from the driveway area adjacent to Douglas Lane is proposed to be collected
via pits and pipes sized for 1% AEP, and also conveyed to the detention tank. Mitigated outflows from
the detention tank are to be discharged on to Duke Street via the RHS kerb adapter.
A small catchment comprising of the planter area on Level 1 is proposed to discharge its stormwater
runoff directly to Duke Street via the LHS kerb adapter.
3.3 RATIONAL METHOD CALCULATION
The Rational Method Calculation has been undertaken for the existing site. Table 1 presents the
Rational Method catchment parameters. Refer to Drawings No. M3024E_DA1_SK01 in Appendix D for
the catchment plan. The fraction imperviousness has been estimated from the detailed survey
(included in Appendix A). The C10 has then been determined in accordance with Table 4.5.3 of the
QUDM (2016) and the time of concentration (Tc) based on the Standard Inlet Time in accordance with
Table 4.6.2 of the QUDM (2016).
Table 1 – Pre-Development Scenario Rational Method Calculation Parameters
Fraction
Catchment Area (ha) C10 Tc (mins)
Impervious
EX 0.0486 57% 0.82 8
The Rational Method peak flows have been estimated based on the parameters above and the site
specific 2016 rainfall intensities obtained from Bureau of Meteorology (BOM) website. Table 2
presents the Rational Method peak flow rates for the for the existing site.
Table 2 – Existing Site Total Peak Discharge – Rational Method Calculation
Existing Site Total Peak Discharge – Rational Method Calculation (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Existing
0.010 0.013 0.018 0.022 0.026 0.033 0.037
Site
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Infrastructure Services Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.