3.4 EXISTING SITE XP-STORM
The peak flow analysis has been undertaken using the XP-STORM version 2021.3. The existing site was
represented by a single node. The existing site XP-STORM peak flow rates have been verified against
the Rational Method Calculation.
3.4.1 CATCHMENT DATA
Table 3 presents the catchment modelled in XP-STORM. Refer to Drawings No. M3024E_DA1_SK01 in
Appendix D for the catchment plan.
Table 3 – Existing Site Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
EX 0.0486 57% 10%
3.4.2 RAINFALL DATA
The site specific 2016 rainfall intensities obtained from BOM coupled Australian Rainfall & Runoff (AR&R)
1987 temporal patterns for zone 3 have been used to generate peak flow hydrographs in XP-STORM.
3.4.3 HYDROLOGICAL LOSSES
The following initial loss, continuous loss and Manning’s n values have been adopted for the
hydrological modelling. The loss values adopted are within the ranges recommended in AR&R (1987)
for the South East Queensland.
Table 4 – Hydrological Losses
Continuing Loss
AEP Area Type Initial Loss (mm) Manning’s n
(mm/hr)
Impervious Area 0 0 0.014
63% to 1%
Pervious Area 15 2 0.07
3.4.4 BX FACTOR
A Bx factor of 1.8 has been used across all AEPs modelled.
3.4.5 EXISTING PEAK DISCHARGE
The XP-STORM hydrology was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard
storm durations. The critical duration is determined to be the 25-minute storm for all AEPs modelled.
Table 5 presents the existing site total peak discharge rates and their comparison to the Rational
Method Calculation.
Table 5 – Existing Site Total Peak Discharge – XP-STORM
Existing Site Total Peak Discharge (m³/s)
63% AEP 39% AEP 20% AEP 10% AEP 5% AEP 2% AEP 1% AEP
Rational
0.010 0.013 0.018 0.022 0.026 0.033 0.037
Method
XP-STORM 0.012 0.017 0.021 0.027 0.032 0.034 0.038
Variance +0.002 +0.004 +0.003 +0.005 +0.006 +0.001 +0.001
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Infrastructure Services Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.