3.5.2    RAINFALL DATA, HYDROLOGICAL LOSSES & BX FACTOR

As per the pre-development scenario.

3.5.3    DETENTION TANK

Table 7 presents the detention tank parameters modelled. Refer to Appendix C for the stage-area
relationship modelled. Re-analysis will be required if the stage-area relationship is significantly altered.

                                         Table 7 – Detention Tank Details
                             Parameter                                       Value
              Detention Tank Dimensions (m)               1m wide x 2.1m long x 2.4m deep (min)
              1% AEP Detention Volume (m³)                                    5.1
              1% AEP Detention Depth (m)                                      2.4
              Detention Tank IL (m AHD)                                      13.50
              Orifice Outlet                                       100mm dia at IL 13.5m AHD
              Weir Outlet                                      250mm weir at RL 15.80m AHD


3.5.4    POST-DEVELOPMENT PEAK DISCHARGE

The XP-STORM was run for 63% AEP to 1% AEP storms with 15 to 180-minute standard storm
durations. Table 8 presents the peak discharge rates from the site.

                          Table 8 – Post-Development Site Total Discharge – XP-STORM
                                                       Site Peak Discharge (m³/s)
                     63% AEP       39% AEP      20% AEP            10% AEP   5% AEP          2% AEP         1% AEP
  XP-STORM Post
 Dev Discharge to      0.001        0.002            0.002          0.003     0.003           0.003          0.003
 LHS Kerb Adapter
  XP-STORM Post
 Dev Discharge to      0.010        0.013            0.014          0.015     0.025           0.030          0.034
 RHS Kerb Adapter
   XP-STORM
 Post-Dev. Site        0.012        0.014            0.016          0.017     0.027           0.033          0.038
      Total
   XP-STORM
  Existing Site        0.012        0.017            0.021          0.027     0.032           0.034          0.038
      Total
    Variance             0          -0.003           -0.005        -0.010     -0.005          -0.001           0

The results show that peak flow mitigation is achieved for all AEP storm events.




SITE BASED STORMWATER MANAGEMENT PLAN – Revision A                                  36 & 38 DUKE STREET, SUNSHINE BEACH
                                                      P a g e |8

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Infrastructure Services Report.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.