The results demonstrate that the XP-STORM peak flows are generally similar to the Rational Method
Calculation, particularly for the larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow
rates have been used for the peak flow and detention tank analysis for this site.
3.5 POST-DEVELOPMENT SITE XP-STORM
3.5.1 CATCHMENT DATA
Table 6 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in
Appendix D presents the catchment delineation.
Table 6 – Post-Development Site Catchment Data
Fraction Vectored Slope
Catchment Area (ha)
Impervious (%)
D1 0.0304 100% 10%
D2 0.0119 63% 10%
D3 0.0019 100% 10%
D4 0.0044 100% 10%
Total 0.0486 91% 10%
The following catchment flow conditions are proposed:
▪ Peak flows up to and including 5% AEP to be collected from catchment D1 and conveyed to the
detention tank. Larger flows will overflow the roof gutters and travel down to Duke Street as
surface runoff, bypassing detention.
▪ Peak flows up to and including 1% AEP to be collected from catchment D2 and conveyed to the
detention tank.
▪ Catchment D3 bypasses detention. Peak flows up to and including 5% AEP are to be collected and
conveyed directly to RHS kerb adapter. Larger flows will overflow the roof gutters and travel down
to Duke Street as surface runoff.
▪ Catchment D4 also bypasses detention. Peak flows up to and including 5% AEP to be collected and
conveyed directly to LHS kerb adapter. Larger flows will overflow the roof gutters and travel down
to Duke Street as surface runoff.
Figure 5 presents the XP-STORM links and nodes set up for the post-development site.
Figure 5 – Post-Development XP-STORM Layout
SITE BASED STORMWATER MANAGEMENT PLAN – Revision A 36 & 38 DUKE STREET, SUNSHINE BEACH
P a g e |7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Infrastructure Services Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.