Appendix C - Infrastructure Services Report · MCU23/0070

of 51

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

The results demonstrate that the XP-STORM peak flows are generally similar to the Rational Method
Calculation, particularly for the larger 1% and 2% AEP storms. On that basis, the XP-STORM peak flow
rates have been used for the peak flow and detention tank analysis for this site.


3.5       POST-DEVELOPMENT SITE XP-STORM
3.5.1     CATCHMENT DATA

Table 6 presents the post-development catchment details. Drawing No. M3024E_DA1_SK02 in
Appendix D presents the catchment delineation.

                                Table 6 – Post-Development Site Catchment Data
                                                                   Fraction      Vectored Slope
                 Catchment               Area (ha)
                                                                  Impervious          (%)
                     D1                   0.0304                    100%              10%
                     D2                   0.0119                     63%                10%
                     D3                   0.0019                    100%                10%
                     D4                   0.0044                    100%                10%
                    Total                 0.0486                     91%                10%

The following catchment flow conditions are proposed:

▪     Peak flows up to and including 5% AEP to be collected from catchment D1 and conveyed to the
      detention tank. Larger flows will overflow the roof gutters and travel down to Duke Street as
      surface runoff, bypassing detention.
▪     Peak flows up to and including 1% AEP to be collected from catchment D2 and conveyed to the
      detention tank.
▪     Catchment D3 bypasses detention. Peak flows up to and including 5% AEP are to be collected and
      conveyed directly to RHS kerb adapter. Larger flows will overflow the roof gutters and travel down
      to Duke Street as surface runoff.
▪     Catchment D4 also bypasses detention. Peak flows up to and including 5% AEP to be collected and
      conveyed directly to LHS kerb adapter. Larger flows will overflow the roof gutters and travel down
      to Duke Street as surface runoff.

Figure 5 presents the XP-STORM links and nodes set up for the post-development site.




                                 Figure 5 – Post-Development XP-STORM Layout




SITE BASED STORMWATER MANAGEMENT PLAN – Revision A                             36 & 38 DUKE STREET, SUNSHINE BEACH
                                                     P a g e |7

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Infrastructure Services Report.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.