Council archive · source document
Appendix C - Infrastructure Services Report · MCU23/0070
Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
DEVELOPMENT SITE
2.1 SITE
The site comprises a single portion of land on two lots bounded by commercial / residential
development to the east and west, Duke Street to the south and Douglas Lane to the north. The site is
described as Lots 370 & 371 on RP48111 Sunshine Beach. Total site area is approximately 486m2.
Vehicle access will be provided via Douglas Lane at the rear of the site.
It is proposed to develop the site in accordance with the accompanying architectural plans – refer to
Blackburne Jackson Drawing No. 7252‐DA05, attached in Appendix B of this report for details.
2.2 EXISTING INFRASTRUCTURE
The proposed development will be designed to integrate, where possible with existing services within
the area. Existing civil infrastructure located in the vicinity of the site identified during preparation of
this report include:
Existing Unitywater water mains located in Duke Street abutting the southern side of the site; and
Existing Unitywater sewerage (wastewater) pipeline located in Duke Street abutting the southern
side of the site
All works will be carried out in accordance with Council’s relevant planning scheme policy and
Unitywater guidelines / approvals.
2.3 PROPOSED INFRASTRUCTURE
Civil infrastructure that will be provided in conjunction with the development include:
Bulk earthworks;
Stormwater connection to existing / additional kerb adaptors in Duke Street;
Sewerage (wastewater) connection to existing Unitywater HCB in Duke Street;
Water supply connection to existing / new Unitywater meter assembly in Duke Street; and
Electrical and telecommunication connection in conjunction with Energex / NBN
Design will be carried out in accordance with Council’s relevant planning scheme policy and Australian
Standards. Internal building hydraulics will be undertaken by a specialist Hydraulic Consultant.
2.4 TOPOGRAPHY & SITEWORKS
Existing buildings on the site will be demolished and disposed off site.
Earthworks will be profiled to finished surface levels detailed on the architectural drawings. The rear of
the site has steep topography which will require implementation of appropriate stability and erosion
and control measures during construction works.
INFRASTRUCTURE REPORT – Revision B (April 2023) 36 – 38 Duke Street, Sunshine Beach P a g e |5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C - Infrastructure Services Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.