Skip to the record
Search everything, all in one place.

Council archive · source document

Appendix C - Infrastructure Services Report · MCU23/0070

of 51

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

Refer to the site specific Geotechnical Report prepared by Core Consulting for assessment of site
stability and recommendations for construction and protection of adjoining properties during the
development. A copy of the Core Consulting Geotechnical Report is included in the development
application documentation.

All construction activities including earthworks will be managed under the control of the
superintendent.

All earthworks will be contained within the site.




INFRASTRUCTURE REPORT – Revision B (April 2023)   36 – 38 Duke Street, Sunshine Beach   P a g e |6

Used in these records

About this file

File size
11.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C - Infrastructure Services Report.pdf · 11.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.