Council Reference:        MCU17/0046 & OPW17/0160
Our Reference:            02128 L03 NG
Our Contact:              Nadine Gorton


 th
6 July 2017



Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565

ATTENTION: ENVIRONMENT AND PLANNING DEPARTMENT

Confidential Email Transmission: [email protected]
Original in Post: No


Dear Sir/Madam,

RE:     RESPONSE TO COUNCIL INFORMATION REQUEST
Development Application – Material Change of Use – Type 2 Duplex and Operational Works
(Stormwater, Drainage Works, Earthworks, Carparking, Access and Landscaping) over Land
described as Lot 598 on RP48112 and situated at 38 Park Crescent, Sunshine Beach:
MCU17/0046 & OPW17/0160

I refer to the above application and in particular to the request for additional information issued by your
                     th
Council and dated 6 June 2017.

This request listed nine (9) items that Council considers is necessary in order to complete its
assessment of the above application. The applicant has decided to respond to these items as below:

Item 1: Provide a revised design that reduces the amount of hardstand area, narrows the driveway
access on the street frontage and provides for more landscaping. Consideration of building setbacks
to the front boundary should be investigated to facilitate this outcome.

Applicant’s Response to Item 1: Please find attached revised plans that detail the provision of three
carparking spaces across the front of the site consistent with the number of car parking spaces
required for a Duplex.

The slope of the site is a major constraint for development and limits feasible design options. The
applicant’s architect has designed the units to consider the steep slope as well as minimize impacts on
the street by locating the units well down the site and providing a single storied presentation to the
street. The amended design now features two single lock up garages separated by an entry walkway
and one open visitor carpark on the southern boundary. The northern part of the frontage now
includes a bin and bike storage area.

The project architect and engineers have investigated locating the garages further down the site
however the resultant profiles were too steep for vehicles, required extensive works in the road
reserve, necessitated additional fencing and would result in an increase in building height.

The plans provide for significant street trees to be provided in the road reserve which will provide
greenery to the street yet not obscure view lines.
Full text of the other 2 pages

Page 2

  Page 2


Item 2: Provide a site specific Stormwater Management Report that is consistent with the
recommendations of the associated site specific Geotechnical Report and makes reference to the
proposed stormwater management plan.

Applicant’s Response to Item 2: Please refer to attached SCG letter and plans.



Item 3: Provide a revised stormwater management plan that locates all private drainage structures
(pits and pipes) within the private property. The drainage line connecting to the kerb and channel is
excluded from this requirement.

Applicant’s Response to Item 3: Please refer to attached SCG letter and plans.



Item 4:        Provide additional detail on how the proposed “charged” line will be maintained

Applicant’s Response to Item 4: Please refer to attached SCG letter and plans.



Item 5: Provide additional detail on the intent of the “gravel scour protection” and how it will function
and be maintained.

Applicant’s Response to Item 5: Please refer to attached SCG letter and plans.



Item 6: Provide certification form the design engineer that states that the proposed system, if
constructed in accordance with the plans, will not create any off-site impacts.

Applicant’s Response to Item 6: Please refer to attached SCG letter and plans.



Item 7: Provide amended plans that do not include private retaining structures in the road reserve and
provide additional detail on how the proposed works in the road reserve will smoothly transition to the
adjoining frontages.

Applicant’s Response to Item 7: Please refer to attached SCG letter and plans.



Item 8: Provide amended plans that are in accordance with Council’s standard drawings or
alternatively demonstrate how the proposed design will ensure that stormwater runoff is contained in
the road formation.

Applicant’s Response to Item 8: Please refer to attached SCG letter and plans.



Item 9: Provide a site specific geotechnical report that includes recommendations for the proposed
building design and stormwater disposal system. The report must conclude that the development will
be stable in the longer term and not affect the stability of the subject site or any adjoining properties
and/or lands.

Applicant’s Response to Item 9: Please refer to attached SCG letter and plans.

Page 3

   Page 3

The applicant considers that he has now responded to Council’s information request. The Decision
Making Period has therefore commenced and we request that your Council proceeds with its
assessment of the application as soon as possible in accordance with the Sustainable Planning Act
2009.

Please contact our Sunshine Coast office if you require any further information and/or clarification.


Yours faithfully,




Nadine Gorton
Senior Planner
martoo consulting pty ltd

Used in these records

About this file

File size
380 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to NC Information request.pdf · 380 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.