Council archive · source document
Response to NC Information request · MCU17/0046
Attached to the e-mail MCU17/0046 & OPW17/0160 - Response to Information Request.
Page 2 Item 2: Provide a site specific Stormwater Management Report that is consistent with the recommendations of the associated site specific Geotechnical Report and makes reference to the proposed stormwater management plan. Applicant’s Response to Item 2: Please refer to attached SCG letter and plans. Item 3: Provide a revised stormwater management plan that locates all private drainage structures (pits and pipes) within the private property. The drainage line connecting to the kerb and channel is excluded from this requirement. Applicant’s Response to Item 3: Please refer to attached SCG letter and plans. Item 4: Provide additional detail on how the proposed “charged” line will be maintained Applicant’s Response to Item 4: Please refer to attached SCG letter and plans. Item 5: Provide additional detail on the intent of the “gravel scour protection” and how it will function and be maintained. Applicant’s Response to Item 5: Please refer to attached SCG letter and plans. Item 6: Provide certification form the design engineer that states that the proposed system, if constructed in accordance with the plans, will not create any off-site impacts. Applicant’s Response to Item 6: Please refer to attached SCG letter and plans. Item 7: Provide amended plans that do not include private retaining structures in the road reserve and provide additional detail on how the proposed works in the road reserve will smoothly transition to the adjoining frontages. Applicant’s Response to Item 7: Please refer to attached SCG letter and plans. Item 8: Provide amended plans that are in accordance with Council’s standard drawings or alternatively demonstrate how the proposed design will ensure that stormwater runoff is contained in the road formation. Applicant’s Response to Item 8: Please refer to attached SCG letter and plans. Item 9: Provide a site specific geotechnical report that includes recommendations for the proposed building design and stormwater disposal system. The report must conclude that the development will be stable in the longer term and not affect the stability of the subject site or any adjoining properties and/or lands. Applicant’s Response to Item 9: Please refer to attached SCG letter and plans.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to NC Information request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 380 KB (small file)
- File type
No other editions are linked here.