16 October 2008
SCG Ref: 16322(L1)
P&C Hunt
PO Box 861
Noosa Heads Q 4567
Dear Sir
Re: Operational Works — 21 Ferquson Street, Sunshine Beach
We write to confirm we have reviewed councils information request dated 5 November
2007 for the above project and follow with our response to the items raised relevant to our
involvement.
Item 4 - The size of the soakage pits are noted on our Hydraulics plan 16322-H2.
Item 5 — The “atlantis’ pits can be positioned at any level however, the stormwater
pipe that drains through the pits must be leveled such that they can drain the kerb
and channel in Ferguson Street via gravity.
Item 6 — Our Hydraulics plan 16322-H2 provides details for the ‘atlantis” pits.
item 7 —- We have assessed the proposed levels of excavation with respect to the
neighbouring allotments and proposed shotcreting to the excavated faces adjacent
the boundaries to maintain stability of the neighbouring allotments. This is shown on
our Operational Works plan 16322-OW1.
We suggest a copy of this letter is presented to council together with the drawings that are
referred to above.
Please do not hesitate to contact the undersigned should you need to discuss any of the
above matters.
SEAN/SHARP-RICHARDSON
on behalf of
SCG CONSULTING ENGINEERS
PEE as
Eee
GCR eer itsokes
Ser mal Lek ee
po box 1661 noosa heads 9.4567
ABW ico ae ane ke eed
STRUCTURAL + CIVIL + GEOTECHNICAL
——————————
CEE he cece)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2081 - Response to Information Request Part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.