Delegated Report - Code - Planning MCU25 0041 & OPW25 0063 (As Published) · MCU25/0041

of 8

Text shows just the words. Original shows the document exactly as it was published.

                         TJS-05028-04       A      Pontoon Decking Details prepared by 21 November 2024
                                                   EDGE Consulting Engineers

                         TJS-05028-05       A      Pile Setout prepared        by   EDGE 21 November 2024
                                                   Consulting Engineers

                         TJS-05028-06       A      Foam Details, Flat Deck Type with 21 November 2024
                                                   Deck Beams prepared by EDGE
                                                   Consulting Engineers

                      Currency Period
               2.     The Currency Period for this development approval lapses if all conditions have not been
                      complied with by 30 May 2027, unless an application to extend the currency period is
                      approved by Council.
                      Performance Bond
               3.     Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
                      submitted to Council, to secure performance of all conditions of this approval, prior to the
                      commencement of the works. The cash bond or trading bank guarantee will be returned on
                      performance of the conditions of this approval less any costs incurred by Council in respect
                      of enforcing performance of this permit. Council reserves the right to call upon the bond or
                      guaranteed sum to effect compliance with conditions.
                      General Conditions
               4.     The approved use is for one (1) Landing as defined by the Noosa Plan 2020 and is to be
                      used for private purposes only with no commercial operations to be undertaken.
               5.     The existing Landing is to be decommissioned and wholly removed prior to the
                      commencement of the use.
               6.     The maximum number of vessels that may be berthed, moored, attached or stored on the
                      structure must not exceed 2.
               7.     All structures must be designed and constructed such that they are free standing within the
                      waterway and are not connected to or behind the revetment wall.
               8.     Gangways and walkways serving jetties and pontoons have a minimum of 1 rigid handrail
                      fitted with a minimum width of 750mm and maximum width of 1.5 metres.
               9.     The use of the landing must not cause any adverse effects on the amenity of the surrounding
                      areas including changes to light, views, air quality and noise.
               10.    Vessels berthed/moored at the Landing must be located a minimum of 3.0 metres from the
                      prolongation of the property boundaries, and clear of the fish habitat area.
               11.    Vessels must be connected directly to the Landing and not located side by side or in tandem
                      with another vessel.
               12.    All structures must have no detrimental effects on stormwater drains and/or easements.
               13.    No boatlifting devices are to be attached or moored at the structure for the purpose of
                      elevating a vessel above the water without Council approval.
               14.    There must be no electrical reticulation system carrying electricity in excess of 24 volts
                      beyond the revetment wall unless all switches and power outlets are positioned above the
                      1%AEP flood level.
               15.    Lighting associated with the use must be designed, installed, operated, and maintained in
                      accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
               16.    The pontoon and gangway are to be used for private purposes only with no commercial
                      operations to be undertaken.

                                                                                                     Page 6 of 8

Document Set ID: 23767653
Version: 0, Version Date: 01/01/1900

Used in these records

About this file

File size
497 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU25 0041 & OPW25 0063 (As Published).pdf · 497 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.