17. Boat repair activities are not permitted on site.
18. Wastewater and sullage must only be disposed of at approved pumpout facilities.
19. The mooring facility must not be utilised for live-aboard purposes.
20. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
21. Certification by a Registered Professional Engineer of Queensland that states that the
pontoon and gangway are constructed in accordance with best practice methods and are
structurally sound must be submitted to Council. This certification must be submitted to
Council within three (3) months of the completion of the works. A final inspection and
approval of the structure by Council’s Inspector is also required. Please contact Council’s
Development Assessment Branch on 5329 6500 to arrange the inspection.
22. This approval lapses where the construction of the pontoon and gangway has not
commenced within two (2) years of the date of issue of the approval, unless application is
made and approved by Council for an extension.
23. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Planning Regulation The agency provided its
at DILGP Via MyDAS2 2017 response on 14 May
at https://prod2.dev- Schedule 10, Part 17, 2025 (Reference No.
assess.qld.gov.au/suite Division 1 - Tidal Works 2505-45903 SRA). A
/ (for assistance, or work in a Coastal copy of the response is
contact DILGP at 5352 Management District attached
9701 or
email:[email protected]
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Extent of Approval
1. This approval does not capture any proposed additions or alternations to the existing dwelling
or within the rear boundary setback. Any proposed additions and alternations are subject to
the Accepted Development provisions of the Noosa Plan 2020.
General Advisory Notes
2. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
of the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
Page 7 of 8
Document Set ID: 23767653
Version: 0, Version Date: 01/01/1900
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU25 0041 & OPW25 0063 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 497 KB (small file)
- File type
No other editions are linked here.