Amended Planning Report
Flooding, drainage and earthworks19
O2 Buildings and other works S2.1 For new buildings or structures Not Applicable –
are designed and sited to— or additions of more than 50m2 of Outside of flood hazard
a) provide flood free access to gross floor area to an existing area
premises and flood free building or structure – floor levels of
habitable areas; habitable rooms are—
b) allow only minor, short term a) for areas where minimum floor
and infrequent flooding of non- levels are available—not less
habitable areas; than the specified level;
c) ensure the protection of b) for areas where flood
persons and property in the modelling is available—a
event of a flood and power minimum of 300mm above
failure; the modelled flood level; and
d) ensure drainage does c) for areas where flood
not adversely impact modelling is not available, a
upon other premises; minimum of 300mm above
and the highest known flood
e) ensure filling, excavation or level;20
retaining structures do not
adversely impact upon other AND
premises by—
causing ponding of water S2.2 Enclosed car parking and Not applicable.
on the site or nearby land; manoeuvring areas are constructed at
and a level that permits the parking area to
ii. increasing flooding, drain from the site by gravity means,
which adversely affects without the need for mechanical
the safety or use of any pumping;
land upstream and
downstream; and AND
iii. adversely affecting
the flow of water in S2.3 Filling, other than accessways, Complies. Proposed
does not extend more than 1m filling, other than
any overland flow required for
path; beyond the footprint of any building,
iv. adversely affecting the measured from the outer walls of the accessways, does not
building. extend more than 1m
privacy or visual beyond the footprint of
amenity of any building.
surrounding
properties.
AND
O3 Finished surface levels Complies.
S3.1 No solution provided
ensure land is free draining.
O4 Filling or excavation does S4.1 Fill material placed over services Complies - No
not adversely affect sewer, does not impose any additional infrastructure within
stormwater or water utility surcharge loading on the service. 3m of proposed
infrastructure. development.
S4.2 Where excavation is carried out-
a) a minimum cover of 600mm is
maintained around all utility
infrastructure (to top, sides and
base of services); or
b) a retaining wall is provided to
support the soil surrounding
the service;
AND
S4.3 Compaction with a vibrating roller
is not carried out within 600mm of any
utility infrastructure.
9|Page