Engineering_Integrated Water Management Plan

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Table 3: MUSIC Base and Storm Flow Concentration Parameters - Commercial

                                  Total Suspended                 Total
                                                                                  Total Nitrogen
                                        Solids                 Phosphorous
                                                                                   (Log10 mg/L)
 Land Use       Parameter           (Log10 mg/L)               (Log10 mg/L)
                                   Storm        Base      Storm        Base       Storm    Base
                                    Flow        Flow       Flow        Flow        Flow    Flow
                  Mean              1.30        0.001      -0.89       0.001      0.37     0.001
   Roof
               Std Deviation        0.38        0.001      0.34        0.001      0.34     0.001
                  Mean              2.43        0.78       -0.30       -0.60      0.37     0.32
   Road
               Std Deviation        0.38        0.39       0.34        0.50       0.34     0.30

Table 4: MUSIC Runoff Generation Parameters - Commercial

                                 Parameter                       Commercial
                       Rainfall Threshold (mm)                        1
                          Soil Capacity (mm)                          18
                            Initial Storage (%)                       10
                               Field Capacity                         80
                   Infiltration Capacity Coefficient a               243
                   Infiltration Capacity Coefficient b               0.6
                          Initial Depth (mm)                          50
                          Daily Recharge (%)                          0
                          Daily Drainage (%)                          31
                     Daily Deep Seepage Rate (%)                      0


The fraction impervious value applied for each of the source nodes are detailed
below in Table 5.
Table 5: Impervious Percentage

                 Impervious Percentage                  Roof               Road
                            %                           100%               90%

2.3.2 Catchment Areas
The development site has been split into seven (7) sub-catchments. Three
catchments represent the tavern site that drain to two outlets. Two catchments
represent the new road area that also drain to two different outlets (drainage
reserve and Lanyana Way). While the remaining two represent the specialty shops,
which have their own treatment. Catchments A, C, E and F have buildings whose
roofed areas are modeled as roof. The rest of each catchment is modeled as road.
There are two small areas within Catchments E and F, which leave the site untreated


                                                                                                   6
Log in to download the original file

Engineering_Integrated Water Management Plan.pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.