Original source · versioned page text
EMU MOUNTAIN ROAD - SHARED PATHWAY · ATT 2 Design Drawings - Emu Mountain Road Shared Pathway
Attachment 2 - Emu Mountain Road Shared Pathway - Summary Plot & Setout Details
ALL DRAWINGS TO BE PRINTED IN COLOUR!
O LD
EMU
MOU
NTA
IN ROA
D
0.000
500
480
460
440
420
400
380
360
20
START OF WORKS
340
320
300
280
260
240
40
220
200
180
160
140
120
60
100
80
REFER BELOW
1 2
3 4 6
EMU MOUNTAIN ROAD 5
520
500
560
540
580
600
620
640
LEGEND
660
1. Start of works
680
700
620
2. Start of first boardwalk
FILE:O:\DesignApps\P-H8416 Emu Mountain Road - Pathway\03 Design\04 Civil\AutoCAD\Community meeting\Community Presentation_TM EDIT - CLEAN - Copy.dwg DATE:22/Jul/2024 BY:jh062
REFER ABOVE
720
3. End of first boardwalk
740
4. Location of first cyclist exit ramp
760
EMU MOUNTAIN ROAD
5. Start of second boardwalk
6. End of second boardwalk
0
78
7. Location of second cyclist exist ramp
AY
0
80
8. Northern batter extents
W
W
0
17.160
7
82
LO
9. Proposed crossing location
0.00
840
860
D
10. End of works
VI
0
DA
8 10
9
10.178
0 15 30 45m N
Scale 1:750 @A1
DRAWN PROJEX PARTNERS EMU MOUNTAIN RD, PEREGIAN BEACH Drawing Number
CHECKED PATHWAY DESIGN Q22217
PRELIMINARY REVIEWED
Sunshine CoastGENERAL ARRANGEMENT Sheet No. - Revision No.
2 21/11/23 90% DESIGN REVIEW Design and Placemaking Services COUNCIL
Rv DATE REVISIONS REC. APPR. COORDINATOR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 3 pages
Page 2
1
2
3
4
FILE:C:\_12dSv5\data\S-AP-01\103-276 Emu Mtn Rd_24286\Design\AutoCAD\_DRAWINGS\103-276-C030-GA-01.dwg DATE:21/Nov/2023 BY:CourtneyB
5 6
RPEQ NAME Mark Atkinson
0 5 10 15m ENGINEERING AREA CIVIL
RPEQ NUMBER
Scale 1:250 @A1 SIGNATURE DATE
DRAWN Lachlan Bone EMU MOUNTAIN RD, PEREGIAN BEACH Drawing Number
PRELIMINARY CHECKED Andrew Brackenreg GENERAL ARRANGEMENT
Q22217
2 21/11/23 90% DESIGN REVIEW LB AB
Sunshine Coast SHEET 1 Sheet No. - Revision No.
1 5/06/23 60% DESIGN REVIEW LB AB COUNCIL
Rv DATE REVISIONS REC. APPR. PATHWAY DESIGN C011 2
Page 3
FILE:C:\_12dSv5\data\S-AP-01\103-276 Emu Mtn Rd_24286\Design\AutoCAD\_DRAWINGS\103-276-C030-GA-02.dwg DATE:21/Nov/2023 BY:CourtneyB
7
RPEQ NAME Mark Atkinson
0 5 10 15m ENGINEERING AREA CIVIL
RPEQ NUMBER
Scale 1:250 @A1 SIGNATURE DATE
DRAWN Lachlan Bone EMU MOUNTAIN RD, PEREGIAN BEACH Drawing Number
PRELIMINARY CHECKED Andrew Brackenreg GENERAL ARRANGEMENT
Q22217
2 21/11/23 90% DESIGN REVIEW LB AB
Sunshine Coast SHEET 2 Sheet No. - Revision No.
1 5/06/23 60% DESIGN REVIEW LB AB COUNCIL
Rv DATE REVISIONS REC. APPR. PATHWAY DESIGN C012 2
Page 4
10
9
8
FILE:C:\_12dSv5\data\S-AP-01\103-276 Emu Mtn Rd_24286\Design\AutoCAD\_DRAWINGS\103-276-C030-GA-03.dwg DATE:21/Nov/2023 BY:CourtneyB
RPEQ NAME Mark Atkinson
0 5 10 15m ENGINEERING AREA CIVIL
RPEQ NUMBER
Scale 1:250 @A1 SIGNATURE DATE
DRAWN Lachlan Bone EMU MOUNTAIN RD, PEREGIAN BEACH Drawing Number
PRELIMINARY CHECKED Andrew Brackenreg GENERAL ARRANGEMENT
Q22217
2 21/11/23 90% DESIGN REVIEW LB AB
Sunshine Coast SHEET 3 Sheet No. - Revision No.
1 5/06/23 60% DESIGN REVIEW LB AB COUNCIL
Rv DATE REVISIONS REC. APPR. PATHWAY DESIGN C013 2