Officer: :Monkeith Kadhum
Direct Telephone: :5329 6293
Our Reference: :OPW17/0225
Your Reference: :2245 JL - L01
5 September 2017
Martoo Consulting
PO Box 1684
NOOSA HEADS QLD 4567
[email protected]
Dear Sir/Madam
Decision Notice
Sustainable Planning Act 2009
I refer to your application and advise that on 31 August 2017, Council decided to
approve the application in full subject to conditions.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: OPW17/0225
Street Address: 61 Elanda St SUNSHINE BEACH QLD 4567
Real Property Description: Lot 408 RP 48112
Planning Scheme: The Noosa Plan (28 October 2016)
2. DECISION DETAILS
The following type of approval has been issued:
Development Permit for Operational Work (Roadworks, Stormwater Drainage,
Earthworks & Landscaping)
3. RELEVANT PERIOD OF APPROVAL
The relevant period for this development approval is 2 years starting the day that this
development approval takes effect.
4. ASSESSMENT MANAGER CONDITIONS
SITE SPECIFIC CONDITIONS
1. The stormwater disposal from the site shall be provided in accordance with:
Drawings Nos 17044-2(A) and 17044-3(A) by Ian Bradford Plumbing Consultants
and must include but not limited to the following:
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 1 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
Noosa Council documents
OPW17/0225
a. Infiltration trench/s (units) installed to the manufacturer’s specifications and in
manner and at location that will not be damaged or constrained by the
development and construction works. The infiltration units must be provided
with inspection opening/s and slotted pipe/s for flushing-out to details be
provided by the certifying engineer and/or the plumbing consultant.
b. Roofs’ charged stormwater pipeline should be provided with appropriate
mechanism for flushing out and slow leak back flow pipe to details be
provided by the certifying engineer and/or the plumbing consultant.
2. All works must be supervised by a Registered Professional Engineer of
Queensland (RPEQ) who is independent of the Developer and Principal
Contractor, and they must certify that all completed engineering works conform to
the conditions of this Operational Works permit and the intent of the engineering
design. Where municipal works are involved, such confirmation must be submitted
for the respective hold points prior to the site inspection by Council Officers
3. The supervising RPEQ or a suitably qualified person (eg plumbing consultant)
must certify that completed stormwater drainage works are in compliance with the
conditions of this permit and best engineering practice particularly regarding the
below surface charged stormwater pipeline and infiltration trenches. The details of
inspections and confirmation of compliance must be included in final certification of
the completed works.
4. The current owners and any subsequent owners are responsible for all ongoing
maintenance of the stormwater drainage system on the site to ensure it performs in
accordance with the intent of its design particularly for the charged stormwater
pipelines and the infiltration trenches.
5. The design and construction of privately owned works must be undertaken in
accordance with the approved plans and the relevant standards. Structural
integrity of the works will remain the responsibility of the property owner/developer
and must be certified by an RPEQ.
APPROVED PLANS
6. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
14725-C001 C General Arrangement and Details, 09/08/2017
prepared by TOD Consulting
- - Landscape Design-Garage Level undated
- - Landscape Design-Lobby Level undated
- - Plant Schedule, 61 Elanda St undated
PRIOR TO COMMENCEMENT OF WORKS
Engineering
7. Council must be contacted at least 5 working days prior to any works commencing
to organise a Prestart. The contact number to arrange a pre-start meeting is 5329
6291. The prestart meeting must include the parties for the following aspects of the
works:
a. Civil engineering works;
Page 2 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 3
Noosa Council documents
OPW17/0225
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties.
8. Prior to arranging a Prestart meeting for the operational works, a security bond in
the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted to Council, to secure the performance of all conditions of this approval.
The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
9. Copies of the approved plans, duly signed by the consultant Registered
Professional Engineer of Queensland (RPEQ) must be provided to Council’s
Engineering Officer Construction at the “prestart” meeting.
10. Condition report/s including photographs must be completed and submitted to
Council prior to the prestart meeting and prior to any works commencing:
a. The frontage of the site.
b. All fences bordering the site.
c. Any buildings and structures on the adjoining properties could potentially be
destabilised or impacted on by the proposed works.
11. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible
to ensure that any subcontractors also have the appropriate insurance and public
liability documentation. Certificates demonstrating currency of public liability
insurance and works insurance covering the works must be submitted to Council
prior to the prestart meeting.
12. A Construction Management Plan must be submitted to Council for approval prior
to the prestart meeting and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction.
ii. Maintenance of safe pedestrian access across the frontage of the site
at all times both during daily construction and after daily construction
has ceased.
iii. Closure of road verge during the construction of the new concrete
pathway.
iv. Proposed fencing to the site during the construction phase of the
development.
v. Adequate parking arrangements for construction workers without
adversely impacting on the local traffic or the availability of public
parking spaces.
vi. No queuing of trucks is permitted on residential streets, especially prior
to 7.00am. Further parked trucks must have engines turned off.
b. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures.
Page 3 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 4
Noosa Council documents
OPW17/0225
c. Works programme identifying key components of the works and their
respective durations.
d. Identification of complaint management procedures including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
13. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five
business days of the change occurring.
14. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement
of works.
DURING CONSTRUCTION
General
15. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans and conditions detailed in this Decision Notice.
b. The relevant conditions of the higher order Material Change of Use approval
file 132003.221172.7 (23657 DA) to which this approval relates.
c. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines.
d. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland” for
all water quality devices to be constructed on site.
Driveway
16. Driveway crossover must be constructed generally in accordance with the
approved plans and be in compliance with IPWEA Standard Drawings RS-049 and
RS-050, and with a longitudinal profile that ensure standard vehicle entering or
leaving the site will not bottom down or scrape.
17. Where there is adjoining a pedestrian path (existing or proposed), a crossfall must
be provided for the driveway to match the gradient of the path, for the full width of
the path.
18. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed
asphaltic concrete or plain/patterned concrete.
b. The driveway must be constructed so as not to concentrate stormwater
runoff or ponding onto other properties or onto road verge and pathway.
c. Where applicable, underground service conduits for water supply, electricity
and any other services must be provided as part of the access driveway
works.
d. Any stormwater kerb outlet in close proximity to the edge of the new
driveways must be provided with an approved kerb adaptor.
e. Have a minimum clearance of 500mm from any Unitywater/Telstra asset,
unless a written approval is obtained from Unitywater/Telstra and submitted
to Council.
Page 4 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 5
Noosa Council documents
OPW17/0225
f. Have a minimum clearance of 1m from any power pole, unless a written
approval is obtained from Energex and submitted to Council.
Pathway
19. A new 1.2m wide pathway must be constructed in compliance with the higher order
approval and in accordance with the following requirements:
a. Be generally in accordance with the approved plans and must be in
compliance with the higher order approval conditions and standard drawing
IPWEAQ RS-065.
b. All paths, driveways and uncovered parking areas must have a slip resistant
surface.
c. Expansion and contraction joints must provide a flush finish. Installation of
joints by saw cutting is preferred to ensure a smooth ride for cyclists.
d. The works must include any modifications to existing service covers to
ensure the footpath finishes flush with all services and the like, so as not to
create any pedestrian safety hazard.
e. For public safety, new pathway must terminate in a manner that ensures
smooth transition to existing surfaces (eg grassed verge, existing adjoining
pathway) and shall be extended beyond the frontage of the site if necessary
to provide transition to match existing pathway.
f. Be designed and constructed to comply with the Disability Discrimination Act
(DDA), Access to Premises Standard, Austroads and relevant sections of
AS1428 Design for access and mobility.
20. Pathway’s construction hold point(s) with Council’s delegate must be established
once the pathway is ready for concreting.
Works within Road Reserve and Reinstatement Works
21. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
22. All reinstatement and frontage works (eg kerb & channel, new concrete footpath)
shall be constructed in accordance with the approved plans and must match neatly
with existing road and verge/footpath features. Additional works beyond the
frontage may be required to provide an acceptable transition to existing road and
verge/footpath profiles.
23. Any existing kerb & channel and concrete footpath sections requiring removal due
to the new works must be saw-cut and removed to allow for a smooth and neat
finish with the new works.
Earthworks
24. All earthworks must be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical supervision and testing undertaken in accordance with Section 8 of
the Standard and/or the recommendation of the certifying engineer (RPEQ).
25. The supervising RPEQ must confirm that any necessary earthwork stabilisation
and earth retention works are carried out to ensure stability of the proposed
development works, and that that development works will not cause, short or long
term, adverse impact on the stability of adjoining properties and structures.
Page 5 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 6
Noosa Council documents
OPW17/0225
Stormwater Drainage
26. Stormwater drainage works must be carried out generally in accordance with the
approved plans and the conditions of this approval (refer to Site Specific
Conditions).
27. Works associated with this permit must not adversely impact on the existing
drainage conditions on other properties (eg by blocking or interfering with natural
overland flows).
28. Construction of all internal stormwater drainage works must comply with the
relevant section/s of Australian Standard AS/NZS 3500.3 and be in accordance
with best applicable engineering practices.
Environment – Erosion & Sediment Control (E&SC)
29. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely to
be released should rainfall occur, unless all reasonable and practicable measures
are taken to prevent or minimise the release and concentration of contamination.
30. Erosion and sediment control measures must be installed and maintained to
minimise erosion on the site and to minimise the export of sediment and
associated pollutants from the site. The erosion and sediment control measures
must be designed, installed and maintained in accordance with current best
practice standards (refer to advisory notes). The E&SC measures must include the
protection of any existing stormwater drainage systems and pipelines, and
particularly the lower properties at the rear of the site.
31. Prior to the commencement of the use all site surfaces must be effectively
stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-term
(refer to advisory notes). For the purpose of this condition, an effectively stabilised
surface is defined as one that does not, or is not likely to result in visible evidence
of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
water contamination.
Landscape Works
32. Landscape works must be supervised, undertaken and certified by qualified
persons*. All works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
33. Landscape works must:
a. Delineate all planting to grassed area interfaces with a timber edge as per
approved landscape plans
b. Ensure amenity or sales signage and ancillary infrastructure is not installed
within the road reserve.
c. Ensure permanent irrigation is not installed within the road reserve.
d. Ensure mulch is aged, comprised of leaf and limb material of varying sizes,
free of foreign matter including anthropogenic waste, rock, soil/sediment
contamination and is applied to all planting areas to ensure a minimum
100mm depth once settled.
34. Street trees must:
a. Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
Page 6 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 7
Noosa Council documents
OPW17/0225
35. Turfed areas must be must be free of pest, diseases and weeds and level with
adjoining surfaces.
Damage to Services and Assets
36. Any damage caused to existing services, streetscape and public or Council’s
assets as a result of the development works must be repaired at no cost to the
asset owner at the following times:
a. Where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. Where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Certification - Landscaping Works
37. Prior to commencement of use Landscaping certification (prepared by a qualified
person*) confirming all landscaping works have been constructed in accordance
with conditions of approval and approved plans.
Certification - Engineering Works
38. Upon completion of the work and prior to the final inspection a certificate must be
issued by the supervising RPEQ certifying that the works have been constructed in
accordance with the Operational Works permit.
Final Inspection
39. A final inspection of the completed works by Council’s Inspector is required.
As Constructed Plans and ADAC XML Files
40. Prior to acceptance of civil works to become Council assets “On Maintenance”,
satisfactory “As-Constructed” records must be submitted to Council. The bundle of
“As Constructed” information shall include:
a. As-Constructed Engineering Drawings. Data is to be submitted in an
electronic drawing file format (.dwg), with all plans clearly endorsed “As-
Constructed”, along with the accompanying hardcopies (PDFs of the As-
Constructed .dwg drawing files), and;
b. ADAC XML Digital File. ADAC File format (ADAC - Asset Design As
Constructed) prepared in accordance with industry standards and recorded
in “MGA - UTM56 / GDA94” projection.
Please Note: Further information and advice relating to the as-constructed
drawing presentation, as-constructed survey capture and associated
guidelines for preparation of a compliant ADAC XML digital file are available
on the webpage titled “As-Constructed Guidelines” and accessible at the
Noosa Council Website: Planning & Development / Development Tools &
Guidelines / As-Constructed Guidelines.
c. The “As-Constructed” drawings will require certification by a:
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent
and conformance with applicable standards and specifications, along
with the relevant descriptions of assets, services and structures and;
ii. Licensed Surveyor in regard to the cadastral and locational information,
levels and applicable survey datum.
Page 7 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 8
Noosa Council documents
OPW17/0225
d. The data must be in accordance with Council’s “Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks”, and fully
detail the levels for all engineering works including but not limited to the
drainage network and structures, finished ground and pavement surface
levels.
On Maintenance
41. All municipal works must be accepted ‘On Maintenance’ by Council in accordance
with Council’s relevant Planning Scheme Policy prior to the commencement of the
use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to council:
a. Certification that all works have been undertaken and completed in
accordance with the requirements of this Permit
b. As Constructed details in accordance with Council’s Planning Scheme Policy
Off Maintenance
42. Prior to requesting an Off Maintenance inspection the developer must provide a
written request for the Off Maintenance inspection.
43. A re-inspection fee in accordance with Council’s Fees and Charge Register will be
charged where:
a. A Council inspection reveals works do not comply with approval
requirements.
b. Submitted certification incorrectly states works comply with approval
requirements.
5. REFERRAL AGENCIES
Not Applicable.
6. REFERENCED DOCUMENTS
Stormwater Quantity Assessment, dated 03/08/2017, prepared by Aquaintel
Consulting.
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in
relations to the proposed works. A detailed check of the calculations and drawings
has not been undertaken, as they have been certified by a RPEQ. The RPEQ
bears full responsibility for all aspects of the engineering design. Council reserves
the right to require further amendments and/or additions at a later date should
design errors become apparent.
2. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for extended
periods of time.
Page 8 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 9
Noosa Council documents
OPW17/0225
3. Amendments to plans and/or any requested changes to the conditions of this
decision notice should be made within the appeal period or the
suspended/extended appeal period. Alternatively, an application for “Request to
change an existing approval” under the Sustainable Planning Act 2009 must be
made along with Council’s applicable fees.
Prestart, On and Off Maintenance Inspections Request
4. Contact Council on 5329 6291 to arrange a prestart or an inspection giving a
minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Right of Appeal Period
of 20 business days should have been passed or the applicant has have confirmed
by a letter or an email that he/she has accepted the conditions of Decision Notice
and waived his/her appeal right.
5. If Council officers are required to undertake additional inspections of the same
works, a re-inspection fee will be applicable in accordance with Council’s Fees and
Charges register applicable at the time.
6. A minimum maintenance period of 12 months will apply to all municipal works and
thereafter until such time as the works are performing in accordance with the
approved design unless noted otherwise.
Qualified Person - Landscaping
7. Qualified Person, for the purpose of:
a. Supervising landscape works and preparing a landscape certification, is
considered to be a landscape architect, landscape designer or horticulturist
with a minimum of three years current experience in the field of landscape
design.
Environmental Advisory note
8. The Environmental Protection Act 1994 states that a person must not carry out any
activity that causes, or is likely to cause, environmental harm unless the person
takes all reasonable and practicable measures to prevent or minimise the harm.
Environmental harm includes environmental nuisance. In this regard persons and
entities, involved in the civil, earthworks, construction and landscaping phases of
this development are to adhere to their ‘general environmental duty’ to minimise
the risk of causing environmental harm.
Erosion and Sediment Control
9. Accepted best practice standards include:
a. the Sunshine Coast Regional Council Manual for Erosion and Sediment
Control V1.2 or other superseding document subsequently adopted by
Council;
b. Best Practice Erosion and Sediment Control, International Erosion Control
Association (2008)
10. As a general rule, a site is determined to have achieved effective short-term
stabilisation if at the completion of the works:
a. Methods of stabilisation are:
i. appropriate for slopes and slope lengths; and
ii. are consistent with best practice environmental management practices
such as in the Manual for Erosion and Sediment Control or the IECA
Manual; and
Page 9 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 10
Noosa Council documents
OPW17/0225
b. Stormwater runoff from the site is not currently, and is not likely to result in
visible evidence of sedimentation or erosion, or lead to water contamination.
c. If at the time of the completion of the works, the method of short-term
stabilisation has not achieved a level of stability that Council's Officers
believe will have a high probability of achieving long term stability (i.e. until
house construction has occurred on all lots), Council Officers may take the
following matters into consideration in determining whether the site is
capable of achieving medium to long-term stability:
d. Evidence that the site has been effectively stabilised in the short term;
e. Evidence that soil has been adequately ameliorated;
f. Evidence that seed of annual and perennial grass species has been applied
at an adequate rate; and
g. That grass seed has germinated at a density that is likely to achieve an
effective grass cover.
Aboriginal Cultural Heritage Act 2003
11. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage.” It is
an offence to fail to comply with the duty of care. Substantial monetary penalties
may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister
administering the Act can also issue stop orders for an activity that is harming or is
likely to harm Aboriginal cultural heritage or the cultural heritage value of
Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
obligations under the ACH Act.
8. PROPERTY NOTES
Not Applicable.
9. PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Not Applicable
11. SELF ASSESSABLE CODES
Not Applicable.
12. SUBMISSIONS
Not Applicable.
13. REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.
Page 10 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 11
Noosa Council documents
OPW17/0225
14. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions
from the Sustainable Planning Act 2009 is attached.
During the appeal period (normally 20 business day), you as the applicant may suspend
your appeal period and make written representations to Council about the conditions
contained within the development approval. If Council agrees or agrees in part with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated
decision notice” may be given. Taking this step will defer your appeal period, which will
commence again from the start the day after you receive a “negotiated decision notice”.
15. OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are
available on line at www.noosa.qld.gov.au, or at Council Offices.
Yours faithfully
Monkeith Kadhum
Development Engineer
enc: Approved Plans
Appeal Rights
cc Unitywater
Page 11 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 12
Noosa Council documents
OPW17/0225
Appeal Rights
SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
REGULATION 2009
The following is an extract from the Sustainable Planning 463 Additional and extended appeal rights for
Act 2009 (Chapter 7). submitters for particular development
applications
MATERIAL CHANGE OF USE, RECONFIGURING A (1) This section applies to a development application to
LOT & OPERATIONAL WORKS which chapter 9, part 7 applies.
(2) A submitter of a properly made submission for the
Division 8 Appeals to court relating to application may appeal to the court about a referral
development applications and agency’s response made by a prescribed
approvals concurrence agency for the application.
(3) However, the submitter may only appeal against a
461 Appeals by applicants referral agency’s response to the extent it relates
(1) An applicant for a development application may to—
appeal to the court against any of the following— (a) if the prescribed concurrence agency is the
(a) the refusal, or the refusal in part, of the chief executive (environment)—development for
development application; an aquacultural ERA; or
(b) any condition of a development approval, (b) if the prescribed concurrence agency is the
another matter stated in a development chief executive (fisheries)—development that
approval and the identification or inclusion of is—
a code under section 242; (i) a material change of use of premises for
(c) the decision to give a preliminary approval aquaculture; or
when a development permit was applied for; (ii) operational work that is the removal,
(d) the length of a period mentioned in section damage or destruction of a marine plant.
341; (4) Despite section 462(1), the submitter may appeal
(e) a deemed refusal of the development against the following matters for the application even
application. if the matters relate to code assessment—
(2) An appeal under subsection (1)(a), (b), (c) or (d) (a) a decision about a matter mentioned in section
must be started within 20 business days (the 462(2) if it is a decision of the chief executive
applicant’s appeal period) after— (fisheries);
(a) if a decision notice or negotiated decision (b) a referral agency’s response mentioned in
notice is given—the day the decision notice subsection (2).
or negotiated decision notice is given to the
applicant; or 464 Appeals by advice agency submitters
(b) otherwise—the day a decision notice was (1) Subsection (2) applies if an advice agency, in its
required to be given to the applicant. response for an application, told the assessment
(3) An appeal under subsection (1)(e) may be started manager to treat the response as a properly made
at any time after the last day a decision on the submission.
matter should have been made. (2) The advice agency may, within the limits of its
jurisdiction, appeal to the court about—
462 Appeals by submitters—general (a) any part of the approval relating to the
(1) A submitter for a development application may assessment manager’s decision about any part
appeal to the court only against— of the application requiring impact assessment
(a) the part of the approval relating to the under section 314; or
assessment manager’s decision about any (b) any part of the approval relating to the
part of the application requiring impact assessment manager’s decision under section
assessment under section 314; or 327.
(b) the part of the approval relating to the (3) The appeal must be started within 20 business days
assessment manager’s decision under after the day the decision notice or negotiated
section 327. decision notice is given to the advice agency as a
(2) To the extent an appeal may be made under submitter.
subsection (1), the appeal may be against 1 or (4) However, if the advice agency has given the
more of the following— assessment manager a notice under section
(a) the giving of a development approval; 339(1)(b)(ii), the advice agency may not appeal the
(b) any provision of the approval including— decision.
(i) a condition of, or lack of condition for,
the approval; or 465 Appeals about decisions relating to extensions
(ii) the length of a period mentioned in for approvals
section 341 for the approval. (1) For a development approval given for a development
(3) However, a submitter may not appeal if the application, a person to whom a notice is given under
submitter— section 389, other than a notice for a decision under
(a) withdraws the submission before the section 386(2), may appeal to the court against the
application is decided; or decision in the notice.
(b) has given the assessment manager a notice (2) The appeal must be started within 20 business days
under section 339(1)(b)(ii). after the day the notice of the decision is given to the
(4) The appeal must be started within 20 business days person.
(the submitter’s appeal period) after the decision (3) Also, a person who has made a request under
notice or negotiated decision notice is given to the section 383 may appeal to the court against a
submitter. deemed refusal of the request.
Page 12 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 13
Noosa Council documents
OPW17/0225
(4) An appeal under subsection (3) may be started at
any time after the last day the decision on the matter
should have been made.
466 Appeals about decisions relating to permissible
changes
(1) For a development approval given for a development
application, the following persons may appeal to the
court against a decision on a request to make a
permissible change to the approval—
(a) if the responsible entity for making the change is
the assessment manager for the application—
(i) the person who made the request; or
(ii) an entity that gave a notice under section
373 or a pre-request response notice
about the request;
(b) if the responsible entity for making the change is
a concurrence agency for the application—the
person who made the request.
(2) The appeal must be started within 20 business days
after the day the person is given notice of the
decision on the request under section 376.
(3) Also, a person who has made a request under
section 369 may appeal to the court against a
deemed refusal of the request.
(4) An appeal under subsection (3) may be started at
any time after the last day the decision on the matter
should have been made.
467 Appeals about changing or cancelling conditions
imposed by assessment manager or concurrence
agency
(1) A person to whom a notice under section 378(9)(b)
giving a decision to change or cancel a condition of a
development approval has been given may appeal to
the court against the decision in the notice.
(2) The appeal must be started within 20 business days
after the day the notice of the decision is given to the
person.
Page 13 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 14
Noosa Council documents
SETOUT POINTS SERVICE CAUTION CAUTION DANGER
POINT EASTING NORTHING LEVEL LOCATIONS WATER MAIN TELCO ASSETS OVERHEAD
BEFORE YOU DIG ELECTRIC CABLES
1 1007.037 2991.139 46.201
SAW CUT EXISTING AC 2 1007.029 2994.946 46.307
It is the responsibility of the
Foreman to contact the relevant
service authorities to ascertain
elstra
NEW CONCRETE DRIVEWAY
3 1007.019 2998.968 46.424 the exact location of services energex
GENERALLY IN ACCORDANCE WITH prior to construction.
IPWEAQ STD DRGS RS-049 & RS-050 PAVEMENT REINSTATEMENT. 4 1007.010 3002.883 46.608
01 02
- - REFER TYPICAL SECTION. 5 1007.001 3006.797 46.770
ELANDA STREET
JOIN NEATLY GENERAL NOTES
JOIN NEATLY
DWY CL
TO EXISTING TO EXISTING 1. DO NOT SCALE DRAWINGS.
2. ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.
01 02 03 04 05 3. THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE CLARIFICATION OF THE
DISCREPANCY.
4. THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE SUPERINTENDENT FOR
APPROVAL, BEFORE PROCEEDING WITH THE WORKS.
5. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN
STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE ENGINEER.
6. NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN OFFICIAL
4.500
PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE CONTRACTOR IS TO OBTAIN
NEW 1.2m WIDE CONCRETE PATH. A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE REQUIREMENTS THEREOF.
MATCH EXISTING WIDTH REFER TYPICAL SECTION
7. ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.
8. WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE AND SITE
SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.
9. THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN, ENVIRONMENTAL
MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF PRINCIPAL AND
SUPERINTENDENT, PRIOR TO CONSTRUCTION.
10. FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE SATISFACTION OF
THE PRINCIPAL AND SUPERINTENDENT.
RELOCATE WATER METER BOX CLEAR SURVEY
OF NEW DRIVEWAY. APPROVAL TO BE 1. THIS DESIGN IS BASED ON SURVEY PROVIDED BY MARTOO CONSULTING PTY LTD.
SOUGHT FROM UNITYWATER.
2. ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).
3. THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.
4. ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR AND ANY
DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.
M1 K&C AS PER NSC STD DRG 9001 1.2m WIDE
0.615 CONC PATH 0.5 1.0 2.3 NOM
EXISTING SERVICES
AS PER
SETOUT POINT
PAVEMENT TO MATCH EXISTING IPWEAQ 1. THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL BEFORE YOU DIG
30mm AC WEARING COURSE (MIN) STD DRG
125mm BASE COURSE (MIN) ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.
RS-065 MIN 75mm
125mm SUB-BASE COURSE (MIN) TOPSOIL & TURF 2. THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR THE ACCURACY
OR COMPLETENESS OF THE INFORMATION SUPPLIED.
RP BDY
0% 20mm FALL -5%
MATCH EXISTING CROSSFALL vvvvvv v v v v v v vv v1 : 6 3. NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.
vv v vv vv
GRATED DRAIN vvvv
vv v v 1 : 4 4. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING WORKS.
vvvv
NATURAL SURFAC vvvv
E vvvv 5. EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE NECESSARY TO SUIT
vvvv
vvvv
vv FINAL FINISHED SURFACE LEVELS.
JOIN TO EXISTING
AS PER IPWEAQ SUBSOIL DRAIN AS PER IPWEAQ STD DRG R140.
STD DRG R170 CONNECT TO EXISTING SUBSOIL IF PRESENT.
SECTION 02 TYPICAL ROAD SECTION -
1:50 (A1) 1:100 (A3) - NOOSA COUNCIL
PROPOSED APPROVED PLANS
DUPLEX
OPW17/0225 31 AUG 2017
CH 0.000
RL 46.370
CH 0.275
RL 46.340
CH 1.215
RL 46.480
CH 2.415
RL 46.500
RP BDY
CH 5.415
RL 46.049
A
E
R
A
D
E
BUILDING
B
R
U
T
IS
D
FP FRONT
SAW CUT
FP BACK
GALV / STAINLESS STEEL DOWELS
K&C INV
K&C LIP
400 LONG R16 AT 450 CRS
D
IR
3.0m CURVED TRANSITION
EA
E
O
C
NATURAL
F
AR
T
SURFACE
IO
F
1:4
LO
ED
N
OM
CH 14.237
RL 43.839
2.2m MIN
W
B
UR STORMWATER DRAINAGE TO
HEADRO
T PROPOSED
DIS
CH 17.737
RL 43.400
INFILTRATION TRENCH, 15 x ATLANTIS
UN POOL FLO-TANKS (DOUBLE AS PRE
150mm THK 25MPa CONCRETE DRIVEWAY ON
'AQUAINTEL' REPORT INSTALLED TO
COMPACTED CBR15 GRAVEL BASE (100mm MIN)
MANUFACTURER'S SPECIFICATION WITH KEYED CONTROL JOINTS AT 6m CRS &
GARAGE
REINFORCED WITH SL82 MESH
PROPOSED NEW EASEMENT
INSTALL SEDIMENT FENCE IN ACCORDANCE
J:\2014\14725_Duplex_61_Elanda_Street_Sunshine_Beach\CADD\#ACAD\#CIVIL\14725_CIVIL.dwg
WITH IECA STD DRGS SF-01 & SF-02 GRATED
3.5m CURVED TRANSITION DRAIN
SECTION 01 DRIVEWAY PROFILE
STORMWATER DRAINAGE TO 1:50 (A1) 1:100 (A3) -
INFILTRATION TRENCH, 10 x ATLANTIS
FLO-TANKS (DOUBLE AS PRE
'AQUAINTEL' REPORT INSTALLED TO 0 1 2 3 4 5m 0 0.5 1 1.5 2 2.5m
MANUFACTURER'S SPECIFICATION GENERAL ARRANGEMENT
1:100 (A1) 1:200 (A3) 1:50 (A1) 1:100 (A3)
SCALE 1:100 (A1) 1:200 (A3)
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to PLANNERS & SURVEYOR JF SP
copyright in accordance with the
MARTOO CONSULTING PTY LTD
ZIGANAIRRE PTY LTD Designed Verified
61 ELANDA ST, SUNSHINE BEACH
GENERAL ARRANGEMENT AS SHOWN A1
agreement between Tod
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
(07) 5447 2500 JF SP PROPOSED DUPLEX DEVELOPMENT
AND DETAILS Drawing Number
Approved RPEQ No
used for this specific project.
C 09.08.17 INFILTRATION TRENCH AMENDED NV
ARCHITECT
S PRYSTUPA 1137 RDP LOT 408 RP48112 14725-C001
This drawing shall not be used BRIGHT BUILDING DESIGN Noosa: 07 5449 9600 LOCAL AUTHORITY NOOSA
B 12.06.17 INFILTRATION TRENCH RELOCATED JF Mark Teunon 0402 750 622 Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed MCU APPROVAL HORIZ DATUM LOCAL 0 10 20 30 40 50 60 Sheet Revision
for construction until marked as PO Box 61, Noosaville, QLD 4566
A 18.05.17 PRELIMINARY ISSUE JF ROL APPROVAL VERT DATUM AHD (OPM44260)
Rev Date Revision Description
'issued for construction' in the
revision description. Drawn
[email protected] www.todconsulting.com
ABN 39 128 805 336
09.08.17 OPW APPROVAL RL DATUM RL 49.843
1 of 1 C
Document Set ID: 20417408 MEASUREMENT BAR - INCREMENTS IN mm
Version: 1, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 15
Noosa Council documents
-
NOOSA COUNCIL
APPROVED PLAN
OPW17/0225 31 AUG 2017
Document Set ID: 20417408
Version: 1, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 16
Noosa Council documents
-
NOOSA COUNCIL
APPROVED PLAN
OPW17/0225 31 AUG 2017
Document Set ID: 20417408
Version: 1, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Page 17
Noosa Council documents
-
NOOSA COUNCIL
APPROVED PLANS
OPW17/0225 31 AUG 2017
Document Set ID: 20417408
Version: 1, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
Used in these records
Att 1b - OpWorks Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.