                                                                Officer:                  :Monkeith Kadhum
                                                                Direct Telephone:         :5329 6293
                                                                Our Reference:            :OPW17/0225
                                                                Your Reference:           :2245 JL - L01

                      5 September 2017


                      Martoo Consulting
                      PO Box 1684
                      NOOSA HEADS QLD 4567

                      [email protected]


                      Dear Sir/Madam

                                                       Decision Notice
                                                   Sustainable Planning Act 2009
                      I refer to your application and advise that on 31 August 2017, Council decided to
                      approve the application in full subject to conditions.
                      Details of the decision are as follows:
                      1.      APPLICATION DETAILS

                      Application No:                 OPW17/0225
                      Street Address:                 61 Elanda St SUNSHINE BEACH QLD 4567
                      Real Property Description:      Lot 408 RP 48112
                      Planning Scheme:                The Noosa Plan (28 October 2016)

                      2.      DECISION DETAILS

                      The following type of approval has been issued:

                             Development Permit for Operational Work (Roadworks, Stormwater Drainage,
                              Earthworks & Landscaping)

                      3.      RELEVANT PERIOD OF APPROVAL

                      The relevant period for this development approval is 2 years starting the day that this
                      development approval takes effect.

                      4.      ASSESSMENT MANAGER CONDITIONS
                      SITE SPECIFIC CONDITIONS
                      1.      The stormwater disposal from the site shall be provided in accordance with:
                              Drawings Nos 17044-2(A) and 17044-3(A) by Ian Bradford Plumbing Consultants
                              and must include but not limited to the following:



                                                     PO Box 141               P. (07) 5329 6500    [email protected]
                                                     TEWANTIN QLD 4565        F. (07) 5329 6501    www.noosa.qld.gov.au
                                                                                                                    Page 1 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                     Print Date: 5 September 2017, 4:08 PM
Full text of the other 16 pages

Page 2

Noosa Council documents




                                                                                                           OPW17/0225

                              a.       Infiltration trench/s (units) installed to the manufacturer’s specifications and in
                                       manner and at location that will not be damaged or constrained by the
                                       development and construction works. The infiltration units must be provided
                                       with inspection opening/s and slotted pipe/s for flushing-out to details be
                                       provided by the certifying engineer and/or the plumbing consultant.
                              b.       Roofs’ charged stormwater pipeline should be provided with appropriate
                                       mechanism for flushing out and slow leak back flow pipe to details be
                                       provided by the certifying engineer and/or the plumbing consultant.
                      2.      All works must be supervised by a Registered Professional Engineer of
                              Queensland (RPEQ) who is independent of the Developer and Principal
                              Contractor, and they must certify that all completed engineering works conform to
                              the conditions of this Operational Works permit and the intent of the engineering
                              design. Where municipal works are involved, such confirmation must be submitted
                              for the respective hold points prior to the site inspection by Council Officers
                      3.      The supervising RPEQ or a suitably qualified person (eg plumbing consultant)
                              must certify that completed stormwater drainage works are in compliance with the
                              conditions of this permit and best engineering practice particularly regarding the
                              below surface charged stormwater pipeline and infiltration trenches. The details of
                              inspections and confirmation of compliance must be included in final certification of
                              the completed works.
                      4.      The current owners and any subsequent owners are responsible for all ongoing
                              maintenance of the stormwater drainage system on the site to ensure it performs in
                              accordance with the intent of its design particularly for the charged stormwater
                              pipelines and the infiltration trenches.
                      5.      The design and construction of privately owned works must be undertaken in
                              accordance with the approved plans and the relevant standards. Structural
                              integrity of the works will remain the responsibility of the property owner/developer
                              and must be certified by an RPEQ.
                      APPROVED PLANS
                      6.      Development undertaken in accordance with this approval must generally comply
                              with the approved plans of development. The approved plans are listed in the
                              following table unless otherwise amended by these conditions.

                               Plan No.             Rev.    Plan/Document Name                           Date
                               14725-C001           C       General Arrangement and Details,             09/08/2017
                                                            prepared by TOD Consulting

                               -                    -       Landscape Design-Garage Level                undated

                               -                    -       Landscape Design-Lobby Level                 undated

                               -                    -       Plant Schedule, 61 Elanda St                 undated

                      PRIOR TO COMMENCEMENT OF WORKS

                              Engineering
                      7.      Council must be contacted at least 5 working days prior to any works commencing
                              to organise a Prestart. The contact number to arrange a pre-start meeting is 5329
                              6291. The prestart meeting must include the parties for the following aspects of the
                              works:
                              a.       Civil engineering works;

                                                                                                                 Page 2 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                    Print Date: 5 September 2017, 4:08 PM

Page 3

Noosa Council documents




                                                                                                          OPW17/0225

                              b.       Landscape works;
                              c.       Erosion and sediment control works;
                              d.       Other relevant parties.
                      8.      Prior to arranging a Prestart meeting for the operational works, a security bond in
                              the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
                              submitted to Council, to secure the performance of all conditions of this approval.
                              The cash bond or trading bank guarantee will be returned on performance of the
                              conditions of approval less any costs incurred by Council in respect of enforcing
                              performance of this permit. Council reserves the right to call upon the bond or
                              guaranteed sum to effect compliance with conditions.
                      9.      Copies of the approved plans, duly signed by the consultant Registered
                              Professional Engineer of Queensland (RPEQ) must be provided to Council’s
                              Engineering Officer Construction at the “prestart” meeting.
                      10.     Condition report/s including photographs must be completed and submitted to
                              Council prior to the prestart meeting and prior to any works commencing:
                              a.       The frontage of the site.
                              b.       All fences bordering the site.
                              c.       Any buildings and structures on the adjoining properties could potentially be
                                       destabilised or impacted on by the proposed works.
                      11.     The principal contractor must have all the appropriate insurance and public liability
                              documentation to carry out the works. The principal contractor is also responsible
                              to ensure that any subcontractors also have the appropriate insurance and public
                              liability documentation. Certificates demonstrating currency of public liability
                              insurance and works insurance covering the works must be submitted to Council
                              prior to the prestart meeting.
                      12.     A Construction Management Plan must be submitted to Council for approval prior
                              to the prestart meeting and must specifically address the following:
                              a.       Traffic Management during all aspects of the construct phase including:
                                        i.    A Traffic Management Control Plan in accordance with Manual of
                                              Uniform Traffic Control Devices (MUTCD) detailing all temporary
                                              signage and traffic control measures prior to construction.
                                       ii.    Maintenance of safe pedestrian access across the frontage of the site
                                              at all times both during daily construction and after daily construction
                                              has ceased.
                                       iii.   Closure of road verge during the construction of the new concrete
                                              pathway.
                                       iv.    Proposed fencing to the site during the construction phase of the
                                              development.
                                       v.     Adequate parking arrangements for construction workers without
                                              adversely impacting on the local traffic or the availability of public
                                              parking spaces.
                                       vi.    No queuing of trucks is permitted on residential streets, especially prior
                                              to 7.00am. Further parked trucks must have engines turned off.
                              b.       Maintenance and protection of water quality and existing drainage lines
                                       through the construction site through the implementation of appropriate
                                       erosion and sediment control measures.


                                                                                                                Page 3 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                   Print Date: 5 September 2017, 4:08 PM

Page 4

Noosa Council documents




                                                                                                      OPW17/0225

                              c.       Works programme identifying key components of the works and their
                                       respective durations.
                              d.       Identification of complaint management procedures including:
                                       i.    Contact details for the on-site manager.
                                       ii.   Dispute resolution procedures.
                      13.     Any changes to the details associated with the supervising RPEQ or Principal
                              Contractor during construction, must be notified to council in writing within five
                              business days of the change occurring.
                      14.     Any conflict between the development and an existing or proposed service must be
                              referred to the relevant service authority for determination prior to commencement
                              of works.
                      DURING CONSTRUCTION
                              General
                      15.     All works must be constructed and work procedure undertaken in accordance with:
                              a.       The approved plans and conditions detailed in this Decision Notice.
                              b.       The relevant conditions of the higher order Material Change of Use approval
                                       file 132003.221172.7 (23657 DA) to which this approval relates.
                              c.       All relevant Noosa Council Planning Scheme Policies, standard drawings,
                                       standard specifications and guidelines.
                              d.       The latest version of the Healthy Waterways document “Water Sensitive
                                       Urban Design Technical Design Guidelines for South East Queensland” for
                                       all water quality devices to be constructed on site.
                              Driveway
                      16.     Driveway crossover must be constructed generally in accordance with the
                              approved plans and be in compliance with IPWEA Standard Drawings RS-049 and
                              RS-050, and with a longitudinal profile that ensure standard vehicle entering or
                              leaving the site will not bottom down or scrape.
                      17.     Where there is adjoining a pedestrian path (existing or proposed), a crossfall must
                              be provided for the driveway to match the gradient of the path, for the full width of
                              the path.
                      18.     The following must be complied with during the construction of the required
                              crossover/driveway:
                              a.       The driveway surfacing must consist of either an approved hot mixed
                                       asphaltic concrete or plain/patterned concrete.
                              b.       The driveway must be constructed so as not to concentrate stormwater
                                       runoff or ponding onto other properties or onto road verge and pathway.
                              c.       Where applicable, underground service conduits for water supply, electricity
                                       and any other services must be provided as part of the access driveway
                                       works.
                              d.       Any stormwater kerb outlet in close proximity to the edge of the new
                                       driveways must be provided with an approved kerb adaptor.
                              e.       Have a minimum clearance of 500mm from any Unitywater/Telstra asset,
                                       unless a written approval is obtained from Unitywater/Telstra and submitted
                                       to Council.



                                                                                                             Page 4 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                               Print Date: 5 September 2017, 4:08 PM

Page 5

Noosa Council documents




                                                                                                        OPW17/0225

                              f.       Have a minimum clearance of 1m from any power pole, unless a written
                                       approval is obtained from Energex and submitted to Council.
                              Pathway
                      19.     A new 1.2m wide pathway must be constructed in compliance with the higher order
                              approval and in accordance with the following requirements:
                              a.       Be generally in accordance with the approved plans and must be in
                                       compliance with the higher order approval conditions and standard drawing
                                       IPWEAQ RS-065.
                              b.       All paths, driveways and uncovered parking areas must have a slip resistant
                                       surface.
                              c.       Expansion and contraction joints must provide a flush finish. Installation of
                                       joints by saw cutting is preferred to ensure a smooth ride for cyclists.
                              d.       The works must include any modifications to existing service covers to
                                       ensure the footpath finishes flush with all services and the like, so as not to
                                       create any pedestrian safety hazard.
                              e.       For public safety, new pathway must terminate in a manner that ensures
                                       smooth transition to existing surfaces (eg grassed verge, existing adjoining
                                       pathway) and shall be extended beyond the frontage of the site if necessary
                                       to provide transition to match existing pathway.
                              f.       Be designed and constructed to comply with the Disability Discrimination Act
                                       (DDA), Access to Premises Standard, Austroads and relevant sections of
                                       AS1428 Design for access and mobility.
                      20.     Pathway’s construction hold point(s) with Council’s delegate must be established
                              once the pathway is ready for concreting.
                              Works within Road Reserve and Reinstatement Works
                      21.     Safe pedestrian access on all streets in the vicinity of the development must be
                              maintained at all times. Should footpath/road closures be necessary to carry out
                              construction works, Council’s Engineering Officer must be notified prior to the
                              proposed closure and all requirements complied with.
                      22.     All reinstatement and frontage works (eg kerb & channel, new concrete footpath)
                              shall be constructed in accordance with the approved plans and must match neatly
                              with existing road and verge/footpath features. Additional works beyond the
                              frontage may be required to provide an acceptable transition to existing road and
                              verge/footpath profiles.
                      23.     Any existing kerb & channel and concrete footpath sections requiring removal due
                              to the new works must be saw-cut and removed to allow for a smooth and neat
                              finish with the new works.
                              Earthworks
                      24.     All earthworks must be undertaken in accordance with the provisions of AS 3798
                              Guidelines on Earthworks for Commercial and Residential Development, with
                              geotechnical supervision and testing undertaken in accordance with Section 8 of
                              the Standard and/or the recommendation of the certifying engineer (RPEQ).
                      25.     The supervising RPEQ must confirm that any necessary earthwork stabilisation
                              and earth retention works are carried out to ensure stability of the proposed
                              development works, and that that development works will not cause, short or long
                              term, adverse impact on the stability of adjoining properties and structures.



                                                                                                              Page 5 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                 Print Date: 5 September 2017, 4:08 PM

Page 6

Noosa Council documents




                                                                                                        OPW17/0225

                              Stormwater Drainage
                      26.     Stormwater drainage works must be carried out generally in accordance with the
                              approved plans and the conditions of this approval (refer to Site Specific
                              Conditions).
                      27.     Works associated with this permit must not adversely impact on the existing
                              drainage conditions on other properties (eg by blocking or interfering with natural
                              overland flows).
                      28.     Construction of all internal stormwater drainage works must comply with the
                              relevant section/s of Australian Standard AS/NZS 3500.3 and be in accordance
                              with best applicable engineering practices.
                              Environment – Erosion & Sediment Control (E&SC)
                      29.     Prescribed Water Contaminants (as defined in the Environmental Protection Act
                              1994) must not be released from the site or to waters within the site, or be likely to
                              be released should rainfall occur, unless all reasonable and practicable measures
                              are taken to prevent or minimise the release and concentration of contamination.
                      30.     Erosion and sediment control measures must be installed and maintained to
                              minimise erosion on the site and to minimise the export of sediment and
                              associated pollutants from the site. The erosion and sediment control measures
                              must be designed, installed and maintained in accordance with current best
                              practice standards (refer to advisory notes). The E&SC measures must include the
                              protection of any existing stormwater drainage systems and pipelines, and
                              particularly the lower properties at the rear of the site.
                      31.     Prior to the commencement of the use all site surfaces must be effectively
                              stabilised using methods which have achieved effective short-term stabilisation
                              and which will continue to achieve effective stabilisation in the medium to long-term
                              (refer to advisory notes). For the purpose of this condition, an effectively stabilised
                              surface is defined as one that does not, or is not likely to result in visible evidence
                              of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
                              water contamination.
                              Landscape Works
                      32.     Landscape works must be supervised, undertaken and certified by qualified
                              persons*. All works must be completed in accordance with this Decision Notice.
                              (* Refer to Advisory Note)
                      33.     Landscape works must:
                              a.       Delineate all planting to grassed area interfaces with a timber edge as per
                                       approved landscape plans
                              b.       Ensure amenity or sales signage and ancillary infrastructure is not installed
                                       within the road reserve.
                              c.       Ensure permanent irrigation is not installed within the road reserve.
                              d.       Ensure mulch is aged, comprised of leaf and limb material of varying sizes,
                                       free of foreign matter including anthropogenic waste, rock, soil/sediment
                                       contamination and is applied to all planting areas to ensure a minimum
                                       100mm depth once settled.
                      34.     Street trees must:
                              a.       Meet Specifying Trees – a guide to assessment of tree quality (NATSPEC).
                              b.       Be located in accordance with engineering requirements for safe vehicle and
                                       pedestrian sight lines.

                                                                                                               Page 6 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                 Print Date: 5 September 2017, 4:08 PM

Page 7

Noosa Council documents




                                                                                                           OPW17/0225

                      35.     Turfed areas must be must be free of pest, diseases and weeds and level with
                              adjoining surfaces.
                              Damage to Services and Assets
                      36.     Any damage caused to existing services, streetscape and public or Council’s
                              assets as a result of the development works must be repaired at no cost to the
                              asset owner at the following times:
                              a.       Where the damage would cause a hazard to pedestrian or vehicle safety,
                                       immediately; or
                              b.       Where otherwise, upon completion of the works associated with the
                                       development.
                              Any repair work which proposes to alter the alignment or level of existing services
                              and assets must first be referred to the relevant service authority for approval.
                      FOLLOWING CONSTRUCTION
                              Certification - Landscaping Works
                      37.     Prior to commencement of use Landscaping certification (prepared by a qualified
                              person*) confirming all landscaping works have been constructed in accordance
                              with conditions of approval and approved plans.
                              Certification - Engineering Works
                      38.     Upon completion of the work and prior to the final inspection a certificate must be
                              issued by the supervising RPEQ certifying that the works have been constructed in
                              accordance with the Operational Works permit.
                              Final Inspection
                      39.     A final inspection of the completed works by Council’s Inspector is required.
                              As Constructed Plans and ADAC XML Files
                      40.     Prior to acceptance of civil works to become Council assets “On Maintenance”,
                              satisfactory “As-Constructed” records must be submitted to Council. The bundle of
                              “As Constructed” information shall include:
                              a.       As-Constructed Engineering Drawings. Data is to be submitted in an
                                       electronic drawing file format (.dwg), with all plans clearly endorsed “As-
                                       Constructed”, along with the accompanying hardcopies (PDFs of the As-
                                       Constructed .dwg drawing files), and;
                              b.       ADAC XML Digital File. ADAC File format (ADAC - Asset Design As
                                       Constructed) prepared in accordance with industry standards and recorded
                                       in “MGA - UTM56 / GDA94” projection.
                                       Please Note: Further information and advice relating to the as-constructed
                                       drawing presentation, as-constructed survey capture and associated
                                       guidelines for preparation of a compliant ADAC XML digital file are available
                                       on the webpage titled “As-Constructed Guidelines” and accessible at the
                                       Noosa Council Website: Planning & Development / Development Tools &
                                       Guidelines / As-Constructed Guidelines.
                              c.       The “As-Constructed” drawings will require certification by a:
                                       i.   Qualified experienced Civil Engineer (RPEQ) confirming design intent
                                            and conformance with applicable standards and specifications, along
                                            with the relevant descriptions of assets, services and structures and;
                                        ii. Licensed Surveyor in regard to the cadastral and locational information,
                                            levels and applicable survey datum.

                                                                                                                 Page 7 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                    Print Date: 5 September 2017, 4:08 PM

Page 8

Noosa Council documents




                                                                                                     OPW17/0225

                              d.       The data must be in accordance with Council’s “Planning Scheme Policy 5 –
                                       Engineering Design Standards – Roads, Drainage and Earthworks”, and fully
                                       detail the levels for all engineering works including but not limited to the
                                       drainage network and structures, finished ground and pavement surface
                                       levels.
                              On Maintenance
                      41.     All municipal works must be accepted ‘On Maintenance’ by Council in accordance
                              with Council’s relevant Planning Scheme Policy prior to the commencement of the
                              use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to council:
                              a.       Certification that all works have been undertaken and completed in
                                       accordance with the requirements of this Permit
                              b.       As Constructed details in accordance with Council’s Planning Scheme Policy
                              Off Maintenance
                      42.     Prior to requesting an Off Maintenance inspection the developer must provide a
                              written request for the Off Maintenance inspection.
                      43.     A re-inspection fee in accordance with Council’s Fees and Charge Register will be
                              charged where:
                              a.       A Council inspection reveals works do not comply with approval
                                       requirements.
                              b.       Submitted certification incorrectly states works comply with approval
                                       requirements.

                      5.     REFERRAL AGENCIES
                      Not Applicable.
                      6.      REFERENCED DOCUMENTS

                           Stormwater Quantity Assessment, dated 03/08/2017, prepared by Aquaintel
                            Consulting.

                      7.      ADVISORY NOTES

                      The following notes are included for guidance and information purposes only and do not
                      form part of the assessment manager conditions:
                              General Advisory Notes
                      1.      Council has undertaken an audit check of the Operational Works drawings in
                              relations to the proposed works. A detailed check of the calculations and drawings
                              has not been undertaken, as they have been certified by a RPEQ. The RPEQ
                              bears full responsibility for all aspects of the engineering design. Council reserves
                              the right to require further amendments and/or additions at a later date should
                              design errors become apparent.
                      2.      Council reserves the right to call up any performance bond held or levy charges
                              against the property, should emergency works be required to be undertaken by
                              Council to make the site safe due to inactivity on the development site for extended
                              periods of time.




                                                                                                           Page 8 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                              Print Date: 5 September 2017, 4:08 PM

Page 9

Noosa Council documents




                                                                                                        OPW17/0225

                      3.      Amendments to plans and/or any requested changes to the conditions of this
                              decision notice should be made within the appeal period or the
                              suspended/extended appeal period. Alternatively, an application for “Request to
                              change an existing approval” under the Sustainable Planning Act 2009 must be
                              made along with Council’s applicable fees.
                              Prestart, On and Off Maintenance Inspections Request
                      4.      Contact Council on 5329 6291 to arrange a prestart or an inspection giving a
                              minimum of 5 business days notice of preferred inspection time.
                              It should be noted prior to arranging a pre-start meeting the Right of Appeal Period
                              of 20 business days should have been passed or the applicant has have confirmed
                              by a letter or an email that he/she has accepted the conditions of Decision Notice
                              and waived his/her appeal right.
                      5.      If Council officers are required to undertake additional inspections of the same
                              works, a re-inspection fee will be applicable in accordance with Council’s Fees and
                              Charges register applicable at the time.
                      6.      A minimum maintenance period of 12 months will apply to all municipal works and
                              thereafter until such time as the works are performing in accordance with the
                              approved design unless noted otherwise.
                              Qualified Person - Landscaping
                      7.      Qualified Person, for the purpose of:
                              a.       Supervising landscape works and preparing a landscape certification, is
                                       considered to be a landscape architect, landscape designer or horticulturist
                                       with a minimum of three years current experience in the field of landscape
                                       design.
                              Environmental Advisory note
                      8.      The Environmental Protection Act 1994 states that a person must not carry out any
                              activity that causes, or is likely to cause, environmental harm unless the person
                              takes all reasonable and practicable measures to prevent or minimise the harm.
                              Environmental harm includes environmental nuisance. In this regard persons and
                              entities, involved in the civil, earthworks, construction and landscaping phases of
                              this development are to adhere to their ‘general environmental duty’ to minimise
                              the risk of causing environmental harm.
                              Erosion and Sediment Control
                      9.      Accepted best practice standards include:
                                a.           the Sunshine Coast Regional Council Manual for Erosion and Sediment
                                             Control V1.2 or other superseding document subsequently adopted by
                                             Council;
                                b.           Best Practice Erosion and Sediment Control, International Erosion Control
                                             Association (2008)
                      10.     As a general rule, a site is determined to have achieved effective short-term
                              stabilisation if at the completion of the works:
                              a.       Methods of stabilisation are:
                                       i.      appropriate for slopes and slope lengths; and
                                       ii.     are consistent with best practice environmental management practices
                                               such as in the Manual for Erosion and Sediment Control or the IECA
                                               Manual; and


                                                                                                              Page 9 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                 Print Date: 5 September 2017, 4:08 PM

Page 10

Noosa Council documents




                                                                                                         OPW17/0225

                              b.       Stormwater runoff from the site is not currently, and is not likely to result in
                                       visible evidence of sedimentation or erosion, or lead to water contamination.
                              c.       If at the time of the completion of the works, the method of short-term
                                       stabilisation has not achieved a level of stability that Council's Officers
                                       believe will have a high probability of achieving long term stability (i.e. until
                                       house construction has occurred on all lots), Council Officers may take the
                                       following matters into consideration in determining whether the site is
                                       capable of achieving medium to long-term stability:
                              d.       Evidence that the site has been effectively stabilised in the short term;
                              e.       Evidence that soil has been adequately ameliorated;
                              f.       Evidence that seed of annual and perennial grass species has been applied
                                       at an adequate rate; and
                              g.       That grass seed has germinated at a density that is likely to achieve an
                                       effective grass cover.
                              Aboriginal Cultural Heritage Act 2003
                      11.     There may be a requirement to establish a Cultural Heritage Management Plan
                              and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
                              The ACH Act establishes a cultural heritage duty of care which provides that: “A
                              person who carries out an activity must take all reasonable and practicable
                              measures to ensure the activity does not harm Aboriginal cultural heritage.” It is
                              an offence to fail to comply with the duty of care. Substantial monetary penalties
                              may apply to individuals or corporations breaching this duty of care. Injunctions
                              may also be issued by the Land and Resources Tribunal, and the Minister
                              administering the Act can also issue stop orders for an activity that is harming or is
                              likely to harm Aboriginal cultural heritage or the cultural heritage value of
                              Aboriginal cultural heritage.
                              You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
                              obligations under the ACH Act.
                      8.      PROPERTY NOTES
                      Not Applicable.
                      9.      PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
                      Not Applicable.
                      10.     FURTHER DEVELOPMENT PERMITS REQUIRED
                      Not Applicable
                      11.     SELF ASSESSABLE CODES
                      Not Applicable.
                      12.     SUBMISSIONS
                      Not Applicable.
                      13.     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
                      Not Applicable.




                                                                                                              Page 10 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                  Print Date: 5 September 2017, 4:08 PM

Page 11

Noosa Council documents




                                                                                                  OPW17/0225

                      14.     RIGHTS OF APPEAL
                      You are entitled to appeal against this decision. A copy of the relevant appeal provisions
                      from the Sustainable Planning Act 2009 is attached.
                      During the appeal period (normally 20 business day), you as the applicant may suspend
                      your appeal period and make written representations to Council about the conditions
                      contained within the development approval. If Council agrees or agrees in part with the
                      representations, a “negotiated decision notice” will be issued. Only one “negotiated
                      decision notice” may be given. Taking this step will defer your appeal period, which will
                      commence again from the start the day after you receive a “negotiated decision notice”.
                      15.     OTHER DETAILS
                      If you wish to obtain more information about Council’s decision, electronic copies are
                      available on line at www.noosa.qld.gov.au, or at Council Offices.


                      Yours faithfully




                      Monkeith Kadhum
                      Development Engineer

                      enc:      Approved Plans
                                Appeal Rights

                      cc        Unitywater




                                                                                                       Page 11 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                           Print Date: 5 September 2017, 4:08 PM

Page 12

Noosa Council documents




                                                                                                                             OPW17/0225



                                                                      Appeal Rights
                                                                      SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
                                                                      REGULATION 2009



                      The following is an extract from the Sustainable Planning      463 Additional and extended appeal rights for
                      Act 2009 (Chapter 7).                                              submitters         for     particular    development
                                                                                         applications
                      MATERIAL CHANGE OF USE, RECONFIGURING A                        (1) This section applies to a development application to
                      LOT & OPERATIONAL WORKS                                            which chapter 9, part 7 applies.
                                                                                     (2) A submitter of a properly made submission for the
                      Division 8           Appeals to      court relating to             application may appeal to the court about a referral
                                           development      applications and             agency’s response made by a prescribed
                                           approvals                                     concurrence agency for the application.
                                                                                     (3) However, the submitter may only appeal against a
                      461     Appeals by applicants                                      referral agency’s response to the extent it relates
                      (1)     An applicant for a development application may             to—
                              appeal to the court against any of the following—          (a) if the prescribed concurrence agency is the
                              (a) the refusal, or the refusal in part, of the                  chief executive (environment)—development for
                                   development application;                                    an aquacultural ERA; or
                              (b) any condition of a development approval,               (b) if the prescribed concurrence agency is the
                                   another matter stated in a development                      chief executive (fisheries)—development that
                                   approval and the identification or inclusion of             is—
                                   a code under section 242;                                   (i) a material change of use of premises for
                              (c) the decision to give a preliminary approval                        aquaculture; or
                                   when a development permit was applied for;                  (ii) operational work that is the removal,
                              (d) the length of a period mentioned in section                        damage or destruction of a marine plant.
                                   341;                                              (4) Despite section 462(1), the submitter may appeal
                              (e) a deemed refusal of the development                    against the following matters for the application even
                                   application.                                          if the matters relate to code assessment—
                      (2)     An appeal under subsection (1)(a), (b), (c) or (d)         (a) a decision about a matter mentioned in section
                              must be started within 20 business days (the                     462(2) if it is a decision of the chief executive
                              applicant’s appeal period) after—                                (fisheries);
                              (a) if a decision notice or negotiated decision            (b) a referral agency’s response mentioned in
                                   notice is given—the day the decision notice                 subsection (2).
                                   or negotiated decision notice is given to the
                                   applicant; or                                     464 Appeals by advice agency submitters
                              (b) otherwise—the day a decision notice was            (1) Subsection (2) applies if an advice agency, in its
                                   required to be given to the applicant.                response for an application, told the assessment
                      (3)     An appeal under subsection (1)(e) may be started           manager to treat the response as a properly made
                              at any time after the last day a decision on the           submission.
                              matter should have been made.                          (2) The advice agency may, within the limits of its
                                                                                         jurisdiction, appeal to the court about—
                      462      Appeals by submitters—general                             (a) any part of the approval relating to the
                      (1)      A submitter for a development application may                   assessment manager’s decision about any part
                               appeal to the court only against—                               of the application requiring impact assessment
                                (a) the part of the approval relating to the                   under section 314; or
                                    assessment manager’s decision about any              (b) any part of the approval relating to the
                                    part of the application requiring impact                   assessment manager’s decision under section
                                    assessment under section 314; or                           327.
                                (b) the part of the approval relating to the         (3) The appeal must be started within 20 business days
                                    assessment manager’s decision under                  after the day the decision notice or negotiated
                                    section 327.                                         decision notice is given to the advice agency as a
                      (2)       To the extent an appeal may be made under                submitter.
                                subsection (1), the appeal may be against 1 or       (4) However, if the advice agency has given the
                                more of the following—                                   assessment manager a notice under section
                               (a) the giving of a development approval;                 339(1)(b)(ii), the advice agency may not appeal the
                               (b) any provision of the approval including—              decision.
                                    (i) a condition of, or lack of condition for,
                                          the approval; or                           465 Appeals about decisions relating to extensions
                                    (ii) the length of a period mentioned in             for approvals
                                          section 341 for the approval.              (1) For a development approval given for a development
                      (3)      However, a submitter may not appeal if the                application, a person to whom a notice is given under
                               submitter—                                                section 389, other than a notice for a decision under
                               (a) withdraws the submission before the                   section 386(2), may appeal to the court against the
                                    application is decided; or                           decision in the notice.
                               (b) has given the assessment manager a notice         (2) The appeal must be started within 20 business days
                                    under section 339(1)(b)(ii).                         after the day the notice of the decision is given to the
                      (4)   The appeal must be started within 20 business days           person.
                            (the submitter’s appeal period) after the decision       (3) Also, a person who has made a request under
                            notice or negotiated decision notice is given to the         section 383 may appeal to the court against a
                            submitter.                                                   deemed refusal of the request.



                                                                                                                                   Page 12 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                                      Print Date: 5 September 2017, 4:08 PM

Page 13

Noosa Council documents




                                                                                        OPW17/0225

                      (4)   An appeal under subsection (3) may be started at
                            any time after the last day the decision on the matter
                            should have been made.

                      466 Appeals about decisions relating to permissible
                          changes
                      (1) For a development approval given for a development
                          application, the following persons may appeal to the
                          court against a decision on a request to make a
                          permissible change to the approval—
                          (a) if the responsible entity for making the change is
                               the assessment manager for the application—
                               (i) the person who made the request; or
                               (ii) an entity that gave a notice under section
                                    373 or a pre-request response notice
                                    about the request;
                          (b) if the responsible entity for making the change is
                               a concurrence agency for the application—the
                               person who made the request.
                      (2) The appeal must be started within 20 business days
                          after the day the person is given notice of the
                          decision on the request under section 376.
                      (3) Also, a person who has made a request under
                          section 369 may appeal to the court against a
                          deemed refusal of the request.
                      (4) An appeal under subsection (3) may be started at
                          any time after the last day the decision on the matter
                          should have been made.

                      467 Appeals about changing or cancelling conditions
                          imposed by assessment manager or concurrence
                          agency
                      (1) A person to whom a notice under section 378(9)(b)
                          giving a decision to change or cancel a condition of a
                          development approval has been given may appeal to
                          the court against the decision in the notice.
                      (2) The appeal must be started within 20 business days
                          after the day the notice of the decision is given to the
                          person.




                                                                                             Page 13 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                 Print Date: 5 September 2017, 4:08 PM

Page 14

Noosa Council documents


                                                                                                                                                                                                                                                                                                                                                                                                                      SETOUT POINTS                                                           SERVICE                                                          CAUTION                                                   CAUTION                            DANGER
                                                                                                                                                                                                                                                                                                                                                                                                              POINT        EASTING             NORTHING                LEVEL                 LOCATIONS                                                         WATER MAIN                                         TELCO ASSETS                              OVERHEAD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             BEFORE YOU DIG                                                                                                              ELECTRIC CABLES
                                                                                                                                                                                                                                                                                                                                                                                                                1          1007.037              2991.139              46.201

                                                                                                                                                                                                                                                     SAW CUT EXISTING AC                                                                                                                                        2          1007.029              2994.946              46.307
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          It is the responsibility of the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Foreman to contact the relevant
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        service authorities to ascertain
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             elstra
                                                                                                                                                   NEW CONCRETE DRIVEWAY
                                                                                                                                                                                                                                                                                                                                                                                                                3          1007.019              2998.968              46.424            the exact location of services                                                                                                                                         energex
                                                                                                                                                   GENERALLY IN ACCORDANCE WITH                                                                                                                                                                                                                                                                                                                prior to construction.
                                                                                                                                                   IPWEAQ STD DRGS RS-049 & RS-050                                                                   PAVEMENT REINSTATEMENT.                                                                                                                                    4          1007.010              3002.883              46.608
                                                                                                                                                                                                          01                  02
                                                                                                                                                                                                          -                    -                     REFER TYPICAL SECTION.                                                                                                                                     5           1007.001             3006.797              46.770
                                                                                                                                                          ELANDA                                                                                                                                                        STREET
                                                                                                                                                                                                                                                                      JOIN NEATLY                                                                                                                                                                                                 GENERAL NOTES
                                                                                                                                                   JOIN NEATLY




                                                                                                                                                                                            DWY CL
                                                                                                                                                   TO EXISTING                                                                                                        TO EXISTING                                                                                                                                                                                                 1.      DO NOT SCALE DRAWINGS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  2.      ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.
                                                                                                                                                                          01                02                     03                         04             05                                                                                                                                                                                                                   3.      THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE CLARIFICATION OF THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          DISCREPANCY.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  4.      THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE SUPERINTENDENT FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          APPROVAL, BEFORE PROCEEDING WITH THE WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  5.      ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE ENGINEER.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  6.      NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN OFFICIAL
                                                                                                                                                                                           4.500
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE CONTRACTOR IS TO OBTAIN
                                                                                                                                                                                                                                              NEW 1.2m WIDE CONCRETE PATH.                                                                                                                                                                                                                A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE REQUIREMENTS THEREOF.
                                                                                                                                              MATCH EXISTING WIDTH                                                                            REFER TYPICAL SECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  7.      ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  8.      WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE AND SITE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  9.      THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN, ENVIRONMENTAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF PRINCIPAL AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SUPERINTENDENT, PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  10. FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE SATISFACTION OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      THE PRINCIPAL AND SUPERINTENDENT.


                                                                                                       RELOCATE WATER METER BOX CLEAR                                                                                                                                                                                                                                                                                                                                             SURVEY
                                                                                                       OF NEW DRIVEWAY. APPROVAL TO BE                                                                                                                                                                                                                                                                                                                                            1.      THIS DESIGN IS BASED ON SURVEY PROVIDED BY MARTOO CONSULTING PTY LTD.
                                                                                                       SOUGHT FROM UNITYWATER.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  2.      ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  3.      THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  4.      ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR AND ANY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.
                                                                                                                                                                                                                                                                                  M1 K&C AS PER NSC STD DRG 9001                                                           1.2m WIDE
                                                                                                                                                                                                                                                                                                                                                            0.615          CONC PATH 0.5               1.0                  2.3 NOM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  EXISTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                             AS PER




                                                                                                                                                                                                                                                                                                                              SETOUT POINT
                                                                                                                                                                                                                                                                             PAVEMENT TO MATCH EXISTING                                                                     IPWEAQ                                                                                                1.      THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL BEFORE YOU DIG
                                                                                                                                                                                                                                                                             30mm AC WEARING COURSE (MIN)                                                                   STD DRG
                                                                                                                                                                                                                                                                             125mm BASE COURSE (MIN)                                                                                                                                                                                      ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.
                                                                                                                                                                                                                                                                                                                                                                             RS-065                                     MIN 75mm
                                                                                                                                                                                                                                                                             125mm SUB-BASE COURSE (MIN)                                                                                                                TOPSOIL & TURF                                            2.      THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR THE ACCURACY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          OR COMPLETENESS OF THE INFORMATION SUPPLIED.




                                                                                                                                                                                                                                                                                                                                                                                                                                                  RP BDY
                                                                                                                                                                                                                                                                                                                                                             0%   20mm FALL -5%
                                                                                                                                                                                                                                                                             MATCH EXISTING CROSSFALL                                                      vvvvvv           v v v v v v vv v1 : 6                                                                                 3.      NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.
                                                                                                                                                                                                                                                                                                                                                                                             vv v vv vv
                                                                                                                                                                                          GRATED DRAIN                                                                                                                                                                                                          vvvv
                                                                                                                                                                                                                                                                                                                                                                                                                        vv v v 1 : 4                                              4.      THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                                              vvvv
                                                                                                                                                                                                                                                                                                                                                                                                  NATURAL SURFAC                   vvvv
                                                                                                                                                                                                                                                                                                                                                                                                                    E                     vvvv                                    5.      EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE NECESSARY TO SUIT
                                                                                                                                                                                                                                                                                                                                                                                                                                                 vvvv
                                                                                                                                                                                                                                                                                                                                                                                                                                                           vvvv
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  vv                      FINAL FINISHED SURFACE LEVELS.
                                                                                                                                                                                                                                                                                             JOIN TO EXISTING
                                                                                                                                                                                                                                                                                             AS PER IPWEAQ                                          SUBSOIL DRAIN AS PER IPWEAQ STD DRG R140.
                                                                                                                                                                                                                                                                                             STD DRG R170                                           CONNECT TO EXISTING SUBSOIL IF PRESENT.



                                                                                                                                                                                                                                                                                                       SECTION                                   02                        TYPICAL ROAD SECTION                                                                                                                                                 -
                                                                                                                                                                                                                                                                                                       1:50 (A1) 1:100 (A3)                            -                                                                                                                                                 NOOSA COUNCIL
                                                                                                                                                                                                     PROPOSED                                                                                                                                                                                                                                                                                           APPROVED PLANS
                                                                                                                                                                                                      DUPLEX
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      OPW17/0225 31 AUG 2017


                                                                                                                                                                                                                                                                                                                                CH 0.000
                                                                                                                                                                                                                                                                                                                                RL 46.370
                                                                                                                                                                                                                                                                                                                                                 CH 0.275
                                                                                                                                                                                                                                                                                                                                                 RL 46.340

                                                                                                                                                                                                                                                                                                                                                                CH 1.215
                                                                                                                                                                                                                                                                                                                                                                RL 46.480




                                                                                                                                                                                                                                                                                                                                                                                      CH 2.415
                                                                                                                                                                                                                                                                                                                                                                                      RL 46.500




                                                                                                                                                                                                                                                                                                                                                                                                                                                  RP BDY
                                                                                                                                                                                                                                                                                                                                                                                                                                   CH 5.415
                                                                                                                                                                                                                                                                                                                                                                                                                                   RL 46.049
                                                                                                                                                    A
                                                                                                                                                   E
                                                                                                                                                 R
                                                                                                                                                A
                                                                                                                                              D
                                                                                                                                            E




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              BUILDING
                                                                                                                                           B
                                                                                                                                       R
                                                                                                                                       U
                                                                                                                                   T
                                                                                                                                 IS
                                                                                                                               D




                                                                                                                                                                                                                                                                                                                                                                FP FRONT
                                                                                                                                                                                                                                                                                                                                             SAW CUT




                                                                                                                                                                                                                                                                                                                                                                                      FP BACK
                                                                                                                                                                                                                                                                             GALV / STAINLESS STEEL DOWELS
                                                                                                                                                                                                                                                                                                                                             K&C INV
                                                                                                                                                                                                                                                                                                                                K&C LIP




                                                                                                                                                                                                                                                                             400 LONG R16 AT 450 CRS
                                                                                                            D
                                                                                                               IR




                                                                                                                                                                                                                                                                                                                                                                                                   3.0m CURVED TRANSITION
                                                                                                                                                                     EA
                                                                                                                 E
                                                                                                      O


                                                                                                                    C




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            NATURAL
                                                                                                        F




                                                                                                                                                                  AR
                                                                                                                     T




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      SURFACE
                                                                                                                        IO
                                                                                                           F




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       1:4
                                                                                                             LO




                                                                                                                                                               ED
                                                                                                                          N




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         OM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                CH 14.237
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                RL 43.839




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   2.2m MIN
                                                                                                                 W




                                                                                                                                                             B
                                                                                                                                                           UR                                                                                                       STORMWATER DRAINAGE TO




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  HEADRO
                                                                                                                                                          T                                PROPOSED
                                                                                                                                                       DIS




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    CH 17.737
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    RL 43.400
                                                                                                                                                                                                                                                                    INFILTRATION TRENCH, 15 x ATLANTIS
                                                                                                                                                     UN                                      POOL                                                                   FLO-TANKS (DOUBLE AS PRE
                                                                                                                                                                                                                                                                                                                                                                                                                                       150mm THK 25MPa CONCRETE DRIVEWAY ON
                                                                                                                                                                                                                                                                    'AQUAINTEL' REPORT INSTALLED TO
                                                                                                                                                                                                                                                                                                                                                                                                                                       COMPACTED CBR15 GRAVEL BASE (100mm MIN)
                                                                                                                                                                                                                                                                    MANUFACTURER'S SPECIFICATION                                                                                                                                       WITH KEYED CONTROL JOINTS AT 6m CRS &
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  GARAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                       REINFORCED WITH SL82 MESH
                                                                                                                                                                                                     PROPOSED NEW EASEMENT
                                                                                                         INSTALL SEDIMENT FENCE IN ACCORDANCE
   J:\2014\14725_Duplex_61_Elanda_Street_Sunshine_Beach\CADD\#ACAD\#CIVIL\14725_CIVIL.dwg




                                                                                                         WITH IECA STD DRGS SF-01 & SF-02                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 GRATED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 3.5m CURVED TRANSITION                                   DRAIN

                                                                                                                                                                                                                                                                                                                                                                                                                         SECTION                            01             DRIVEWAY PROFILE
                                                                                                         STORMWATER DRAINAGE TO                                                                                                                                                                                                                                                                                          1:50 (A1) 1:100 (A3)                 -
                                                                                                         INFILTRATION TRENCH, 10 x ATLANTIS
                                                                                                         FLO-TANKS (DOUBLE AS PRE
                                                                                                         'AQUAINTEL' REPORT INSTALLED TO                                                                                                                                                                                                                                                                                                                                                                                                                                    0        1        2         3                4     5m           0       0.5     1    1.5      2      2.5m
                                                                                                         MANUFACTURER'S SPECIFICATION                                                      GENERAL ARRANGEMENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            1:100 (A1)                      1:200 (A3)                          1:50 (A1)              1:100 (A3)
                                                                                                                                                                                                       SCALE 1:100 (A1) 1:200 (A3)


                                                                                                 COPYRIGHT ©                                                                                 Associated Consultants                  Client                                                                                                                                Drawn                         Verified                       Project                                                                                   Drawing Title                                                                                                  Scale                        Sheet Size
                                                                                            This drawing is subject to                                                                       PLANNERS & SURVEYOR                                                                                                                                                           JF                            SP
                                                                                            copyright in accordance with the
                                                                                                                                                                                             MARTOO CONSULTING PTY LTD
                                                                                                                                                                                                                                     ZIGANAIRRE PTY LTD                                                                                                                    Designed                      Verified
                                                                                                                                                                                                                                                                                                                                                                                                                                        61 ELANDA ST, SUNSHINE BEACH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 GENERAL ARRANGEMENT                                                                                                                                                            AS SHOWN A1
                                                                                            agreement between Tod
                                                                                            Consulting pty ltd (tc) and tc's
                                                                                            client. This drawing shall only be
                                                                                                                                                                                             (07) 5447 2500                                                                                                                                                                JF                            SP                             PROPOSED DUPLEX DEVELOPMENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 AND DETAILS                                                                                                                                                                     Drawing Number
                                                                                                                                                                                                                                                                                                                                                                           Approved                      RPEQ No
                                                                                            used for this specific project.
                                                                                                                                   C       09.08.17 INFILTRATION TRENCH AMENDED      NV
                                                                                                                                                                                              ARCHITECT
                                                                                                                                                                                                                                                                                                                                                                           S PRYSTUPA                    1137                           RDP                             LOT 408 RP48112                                                                                                                                                               14725-C001
                                                                                            This drawing shall not be used                                                                    BRIGHT BUILDING DESIGN                                                                                  Noosa: 07 5449 9600                                                                                                               LOCAL AUTHORITY                 NOOSA
                                                                                                                                   B       12.06.17 INFILTRATION TRENCH RELOCATED    JF       Mark Teunon 0402 750 622                                                                Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                                                                                                                                           Signed                                                       MCU APPROVAL                                          HORIZ DATUM LOCAL                                     0     10        20          30       40        50            60                              Sheet                         Revision
                                                                                            for construction until marked as                                                                                                                                                                   PO Box 61, Noosaville, QLD 4566
                                                                                                                                   A       18.05.17 PRELIMINARY ISSUE                JF                                                                                                                                                                                                                                                 ROL APPROVAL                                          VERT DATUM AHD (OPM44260)
                     Rev Date Revision Description
                                                                                            'issued for construction' in the
                                                                                            revision description.                                                                   Drawn
                                                                                                                                                                                                                                                                                    [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                                                      ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                                                                                                                                          09.08.17      OPW APPROVAL                                          RL DATUM    RL 49.843
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          1 of 1                  C
Document Set ID: 20417408                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               MEASUREMENT BAR - INCREMENTS IN mm


Version: 1, Version Date: 05/09/2017                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Print Date: 5 September 2017, 4:08 PM

Page 15

Noosa Council documents


                                       -

                      NOOSA COUNCIL
                      APPROVED PLAN
                   OPW17/0225 31 AUG 2017




Document Set ID: 20417408
Version: 1, Version Date: 05/09/2017        Print Date: 5 September 2017, 4:08 PM

Page 16

Noosa Council documents


                                       -

                        NOOSA COUNCIL
                        APPROVED PLAN
                     OPW17/0225 31 AUG 2017




Document Set ID: 20417408
Version: 1, Version Date: 05/09/2017          Print Date: 5 September 2017, 4:08 PM

Page 17

Noosa Council documents




                                                 -

                                          NOOSA COUNCIL
                                         APPROVED PLANS
                                       OPW17/0225 31 AUG 2017




Document Set ID: 20417408
Version: 1, Version Date: 05/09/2017                 Print Date: 5 September 2017, 4:08 PM

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1b - OpWorks Decision Notice.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.