Att 1b - OpWorks Decision Notice · 132003.221172.8

Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.

of 17

Text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




                                                                                                           OPW17/0225

                              a.       Infiltration trench/s (units) installed to the manufacturer’s specifications and in
                                       manner and at location that will not be damaged or constrained by the
                                       development and construction works. The infiltration units must be provided
                                       with inspection opening/s and slotted pipe/s for flushing-out to details be
                                       provided by the certifying engineer and/or the plumbing consultant.
                              b.       Roofs’ charged stormwater pipeline should be provided with appropriate
                                       mechanism for flushing out and slow leak back flow pipe to details be
                                       provided by the certifying engineer and/or the plumbing consultant.
                      2.      All works must be supervised by a Registered Professional Engineer of
                              Queensland (RPEQ) who is independent of the Developer and Principal
                              Contractor, and they must certify that all completed engineering works conform to
                              the conditions of this Operational Works permit and the intent of the engineering
                              design. Where municipal works are involved, such confirmation must be submitted
                              for the respective hold points prior to the site inspection by Council Officers
                      3.      The supervising RPEQ or a suitably qualified person (eg plumbing consultant)
                              must certify that completed stormwater drainage works are in compliance with the
                              conditions of this permit and best engineering practice particularly regarding the
                              below surface charged stormwater pipeline and infiltration trenches. The details of
                              inspections and confirmation of compliance must be included in final certification of
                              the completed works.
                      4.      The current owners and any subsequent owners are responsible for all ongoing
                              maintenance of the stormwater drainage system on the site to ensure it performs in
                              accordance with the intent of its design particularly for the charged stormwater
                              pipelines and the infiltration trenches.
                      5.      The design and construction of privately owned works must be undertaken in
                              accordance with the approved plans and the relevant standards. Structural
                              integrity of the works will remain the responsibility of the property owner/developer
                              and must be certified by an RPEQ.
                      APPROVED PLANS
                      6.      Development undertaken in accordance with this approval must generally comply
                              with the approved plans of development. The approved plans are listed in the
                              following table unless otherwise amended by these conditions.

                               Plan No.             Rev.    Plan/Document Name                           Date
                               14725-C001           C       General Arrangement and Details,             09/08/2017
                                                            prepared by TOD Consulting

                               -                    -       Landscape Design-Garage Level                undated

                               -                    -       Landscape Design-Lobby Level                 undated

                               -                    -       Plant Schedule, 61 Elanda St                 undated

                      PRIOR TO COMMENCEMENT OF WORKS

                              Engineering
                      7.      Council must be contacted at least 5 working days prior to any works commencing
                              to organise a Prestart. The contact number to arrange a pre-start meeting is 5329
                              6291. The prestart meeting must include the parties for the following aspects of the
                              works:
                              a.       Civil engineering works;

                                                                                                                 Page 2 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                    Print Date: 5 September 2017, 4:08 PM

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1b - OpWorks Decision Notice.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.