Att 1b - OpWorks Decision Notice · 132003.221172.8

Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.

of 17

Text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




                                                                                                        OPW17/0225

                              f.       Have a minimum clearance of 1m from any power pole, unless a written
                                       approval is obtained from Energex and submitted to Council.
                              Pathway
                      19.     A new 1.2m wide pathway must be constructed in compliance with the higher order
                              approval and in accordance with the following requirements:
                              a.       Be generally in accordance with the approved plans and must be in
                                       compliance with the higher order approval conditions and standard drawing
                                       IPWEAQ RS-065.
                              b.       All paths, driveways and uncovered parking areas must have a slip resistant
                                       surface.
                              c.       Expansion and contraction joints must provide a flush finish. Installation of
                                       joints by saw cutting is preferred to ensure a smooth ride for cyclists.
                              d.       The works must include any modifications to existing service covers to
                                       ensure the footpath finishes flush with all services and the like, so as not to
                                       create any pedestrian safety hazard.
                              e.       For public safety, new pathway must terminate in a manner that ensures
                                       smooth transition to existing surfaces (eg grassed verge, existing adjoining
                                       pathway) and shall be extended beyond the frontage of the site if necessary
                                       to provide transition to match existing pathway.
                              f.       Be designed and constructed to comply with the Disability Discrimination Act
                                       (DDA), Access to Premises Standard, Austroads and relevant sections of
                                       AS1428 Design for access and mobility.
                      20.     Pathway’s construction hold point(s) with Council’s delegate must be established
                              once the pathway is ready for concreting.
                              Works within Road Reserve and Reinstatement Works
                      21.     Safe pedestrian access on all streets in the vicinity of the development must be
                              maintained at all times. Should footpath/road closures be necessary to carry out
                              construction works, Council’s Engineering Officer must be notified prior to the
                              proposed closure and all requirements complied with.
                      22.     All reinstatement and frontage works (eg kerb & channel, new concrete footpath)
                              shall be constructed in accordance with the approved plans and must match neatly
                              with existing road and verge/footpath features. Additional works beyond the
                              frontage may be required to provide an acceptable transition to existing road and
                              verge/footpath profiles.
                      23.     Any existing kerb & channel and concrete footpath sections requiring removal due
                              to the new works must be saw-cut and removed to allow for a smooth and neat
                              finish with the new works.
                              Earthworks
                      24.     All earthworks must be undertaken in accordance with the provisions of AS 3798
                              Guidelines on Earthworks for Commercial and Residential Development, with
                              geotechnical supervision and testing undertaken in accordance with Section 8 of
                              the Standard and/or the recommendation of the certifying engineer (RPEQ).
                      25.     The supervising RPEQ must confirm that any necessary earthwork stabilisation
                              and earth retention works are carried out to ensure stability of the proposed
                              development works, and that that development works will not cause, short or long
                              term, adverse impact on the stability of adjoining properties and structures.



                                                                                                              Page 5 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                 Print Date: 5 September 2017, 4:08 PM

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1b - OpWorks Decision Notice.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.