Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.
Noosa Council documents
OPW17/0225
f. Have a minimum clearance of 1m from any power pole, unless a written
approval is obtained from Energex and submitted to Council.
Pathway
19. A new 1.2m wide pathway must be constructed in compliance with the higher order
approval and in accordance with the following requirements:
a. Be generally in accordance with the approved plans and must be in
compliance with the higher order approval conditions and standard drawing
IPWEAQ RS-065.
b. All paths, driveways and uncovered parking areas must have a slip resistant
surface.
c. Expansion and contraction joints must provide a flush finish. Installation of
joints by saw cutting is preferred to ensure a smooth ride for cyclists.
d. The works must include any modifications to existing service covers to
ensure the footpath finishes flush with all services and the like, so as not to
create any pedestrian safety hazard.
e. For public safety, new pathway must terminate in a manner that ensures
smooth transition to existing surfaces (eg grassed verge, existing adjoining
pathway) and shall be extended beyond the frontage of the site if necessary
to provide transition to match existing pathway.
f. Be designed and constructed to comply with the Disability Discrimination Act
(DDA), Access to Premises Standard, Austroads and relevant sections of
AS1428 Design for access and mobility.
20. Pathway’s construction hold point(s) with Council’s delegate must be established
once the pathway is ready for concreting.
Works within Road Reserve and Reinstatement Works
21. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the
proposed closure and all requirements complied with.
22. All reinstatement and frontage works (eg kerb & channel, new concrete footpath)
shall be constructed in accordance with the approved plans and must match neatly
with existing road and verge/footpath features. Additional works beyond the
frontage may be required to provide an acceptable transition to existing road and
verge/footpath profiles.
23. Any existing kerb & channel and concrete footpath sections requiring removal due
to the new works must be saw-cut and removed to allow for a smooth and neat
finish with the new works.
Earthworks
24. All earthworks must be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical supervision and testing undertaken in accordance with Section 8 of
the Standard and/or the recommendation of the certifying engineer (RPEQ).
25. The supervising RPEQ must confirm that any necessary earthwork stabilisation
and earth retention works are carried out to ensure stability of the proposed
development works, and that that development works will not cause, short or long
term, adverse impact on the stability of adjoining properties and structures.
Page 5 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1b - OpWorks Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.