OPW17/0225
c. Works programme identifying key components of the works and their
respective durations.
d. Identification of complaint management procedures including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
13. Any changes to the details associated with the supervising RPEQ or Principal
Contractor during construction, must be notified to council in writing within five
business days of the change occurring.
14. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement
of works.
DURING CONSTRUCTION
General
15. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans and conditions detailed in this Decision Notice.
b. The relevant conditions of the higher order Material Change of Use approval
file 132003.221172.7 (23657 DA) to which this approval relates.
c. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines.
d. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland” for
all water quality devices to be constructed on site.
Driveway
16. Driveway crossover must be constructed generally in accordance with the
approved plans and be in compliance with IPWEA Standard Drawings RS-049 and
RS-050, and with a longitudinal profile that ensure standard vehicle entering or
leaving the site will not bottom down or scrape.
17. Where there is adjoining a pedestrian path (existing or proposed), a crossfall must
be provided for the driveway to match the gradient of the path, for the full width of
the path.
18. The following must be complied with during the construction of the required
crossover/driveway:
a. The driveway surfacing must consist of either an approved hot mixed
asphaltic concrete or plain/patterned concrete.
b. The driveway must be constructed so as not to concentrate stormwater
runoff or ponding onto other properties or onto road verge and pathway.
c. Where applicable, underground service conduits for water supply, electricity
and any other services must be provided as part of the access driveway
works.
d. Any stormwater kerb outlet in close proximity to the edge of the new
driveways must be provided with an approved kerb adaptor.
e. Have a minimum clearance of 500mm from any Unitywater/Telstra asset,
unless a written approval is obtained from Unitywater/Telstra and submitted
to Council.
Page 4 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1b - OpWorks Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.