Att 1b - OpWorks Decision Notice · 132003.221172.8

Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.

of 17

Text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




                                                                                                           OPW17/0225

                      35.     Turfed areas must be must be free of pest, diseases and weeds and level with
                              adjoining surfaces.
                              Damage to Services and Assets
                      36.     Any damage caused to existing services, streetscape and public or Council’s
                              assets as a result of the development works must be repaired at no cost to the
                              asset owner at the following times:
                              a.       Where the damage would cause a hazard to pedestrian or vehicle safety,
                                       immediately; or
                              b.       Where otherwise, upon completion of the works associated with the
                                       development.
                              Any repair work which proposes to alter the alignment or level of existing services
                              and assets must first be referred to the relevant service authority for approval.
                      FOLLOWING CONSTRUCTION
                              Certification - Landscaping Works
                      37.     Prior to commencement of use Landscaping certification (prepared by a qualified
                              person*) confirming all landscaping works have been constructed in accordance
                              with conditions of approval and approved plans.
                              Certification - Engineering Works
                      38.     Upon completion of the work and prior to the final inspection a certificate must be
                              issued by the supervising RPEQ certifying that the works have been constructed in
                              accordance with the Operational Works permit.
                              Final Inspection
                      39.     A final inspection of the completed works by Council’s Inspector is required.
                              As Constructed Plans and ADAC XML Files
                      40.     Prior to acceptance of civil works to become Council assets “On Maintenance”,
                              satisfactory “As-Constructed” records must be submitted to Council. The bundle of
                              “As Constructed” information shall include:
                              a.       As-Constructed Engineering Drawings. Data is to be submitted in an
                                       electronic drawing file format (.dwg), with all plans clearly endorsed “As-
                                       Constructed”, along with the accompanying hardcopies (PDFs of the As-
                                       Constructed .dwg drawing files), and;
                              b.       ADAC XML Digital File. ADAC File format (ADAC - Asset Design As
                                       Constructed) prepared in accordance with industry standards and recorded
                                       in “MGA - UTM56 / GDA94” projection.
                                       Please Note: Further information and advice relating to the as-constructed
                                       drawing presentation, as-constructed survey capture and associated
                                       guidelines for preparation of a compliant ADAC XML digital file are available
                                       on the webpage titled “As-Constructed Guidelines” and accessible at the
                                       Noosa Council Website: Planning & Development / Development Tools &
                                       Guidelines / As-Constructed Guidelines.
                              c.       The “As-Constructed” drawings will require certification by a:
                                       i.   Qualified experienced Civil Engineer (RPEQ) confirming design intent
                                            and conformance with applicable standards and specifications, along
                                            with the relevant descriptions of assets, services and structures and;
                                        ii. Licensed Surveyor in regard to the cadastral and locational information,
                                            levels and applicable survey datum.

                                                                                                                 Page 7 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                                    Print Date: 5 September 2017, 4:08 PM

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1b - OpWorks Decision Notice.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.