Att 1b - OpWorks Decision Notice · 132003.221172.8

Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.

of 17

Text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




                                                                                                     OPW17/0225

                              d.       The data must be in accordance with Council’s “Planning Scheme Policy 5 –
                                       Engineering Design Standards – Roads, Drainage and Earthworks”, and fully
                                       detail the levels for all engineering works including but not limited to the
                                       drainage network and structures, finished ground and pavement surface
                                       levels.
                              On Maintenance
                      41.     All municipal works must be accepted ‘On Maintenance’ by Council in accordance
                              with Council’s relevant Planning Scheme Policy prior to the commencement of the
                              use. To achieve ‘On Maintenance’, the supervising RPEQ must submit to council:
                              a.       Certification that all works have been undertaken and completed in
                                       accordance with the requirements of this Permit
                              b.       As Constructed details in accordance with Council’s Planning Scheme Policy
                              Off Maintenance
                      42.     Prior to requesting an Off Maintenance inspection the developer must provide a
                              written request for the Off Maintenance inspection.
                      43.     A re-inspection fee in accordance with Council’s Fees and Charge Register will be
                              charged where:
                              a.       A Council inspection reveals works do not comply with approval
                                       requirements.
                              b.       Submitted certification incorrectly states works comply with approval
                                       requirements.

                      5.     REFERRAL AGENCIES
                      Not Applicable.
                      6.      REFERENCED DOCUMENTS

                           Stormwater Quantity Assessment, dated 03/08/2017, prepared by Aquaintel
                            Consulting.

                      7.      ADVISORY NOTES

                      The following notes are included for guidance and information purposes only and do not
                      form part of the assessment manager conditions:
                              General Advisory Notes
                      1.      Council has undertaken an audit check of the Operational Works drawings in
                              relations to the proposed works. A detailed check of the calculations and drawings
                              has not been undertaken, as they have been certified by a RPEQ. The RPEQ
                              bears full responsibility for all aspects of the engineering design. Council reserves
                              the right to require further amendments and/or additions at a later date should
                              design errors become apparent.
                      2.      Council reserves the right to call up any performance bond held or levy charges
                              against the property, should emergency works be required to be undertaken by
                              Council to make the site safe due to inactivity on the development site for extended
                              periods of time.




                                                                                                           Page 8 of 13


Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017                                                              Print Date: 5 September 2017, 4:08 PM

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Att 1b - OpWorks Decision Notice.pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.