Attached to the e-mail Change to DA (23657 DA Duplex Dwelling) - 132003.221172.8 Attachements 132003.221172.7 - 61 Elanda St.msg.
Noosa Council documents
OPW17/0225
3. Amendments to plans and/or any requested changes to the conditions of this
decision notice should be made within the appeal period or the
suspended/extended appeal period. Alternatively, an application for “Request to
change an existing approval” under the Sustainable Planning Act 2009 must be
made along with Council’s applicable fees.
Prestart, On and Off Maintenance Inspections Request
4. Contact Council on 5329 6291 to arrange a prestart or an inspection giving a
minimum of 5 business days notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Right of Appeal Period
of 20 business days should have been passed or the applicant has have confirmed
by a letter or an email that he/she has accepted the conditions of Decision Notice
and waived his/her appeal right.
5. If Council officers are required to undertake additional inspections of the same
works, a re-inspection fee will be applicable in accordance with Council’s Fees and
Charges register applicable at the time.
6. A minimum maintenance period of 12 months will apply to all municipal works and
thereafter until such time as the works are performing in accordance with the
approved design unless noted otherwise.
Qualified Person - Landscaping
7. Qualified Person, for the purpose of:
a. Supervising landscape works and preparing a landscape certification, is
considered to be a landscape architect, landscape designer or horticulturist
with a minimum of three years current experience in the field of landscape
design.
Environmental Advisory note
8. The Environmental Protection Act 1994 states that a person must not carry out any
activity that causes, or is likely to cause, environmental harm unless the person
takes all reasonable and practicable measures to prevent or minimise the harm.
Environmental harm includes environmental nuisance. In this regard persons and
entities, involved in the civil, earthworks, construction and landscaping phases of
this development are to adhere to their ‘general environmental duty’ to minimise
the risk of causing environmental harm.
Erosion and Sediment Control
9. Accepted best practice standards include:
a. the Sunshine Coast Regional Council Manual for Erosion and Sediment
Control V1.2 or other superseding document subsequently adopted by
Council;
b. Best Practice Erosion and Sediment Control, International Erosion Control
Association (2008)
10. As a general rule, a site is determined to have achieved effective short-term
stabilisation if at the completion of the works:
a. Methods of stabilisation are:
i. appropriate for slopes and slope lengths; and
ii. are consistent with best practice environmental management practices
such as in the Manual for Erosion and Sediment Control or the IECA
Manual; and
Page 9 of 13
Document Set ID: 20417363
Version: 3, Version Date: 05/09/2017 Print Date: 5 September 2017, 4:08 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 1b - OpWorks Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.