Minor Change Existing Approval - MCU22 0097 02 (As Published)
Car Parking
19. A minimum of 20 car parking spaces must be provided and marked on the site, and made
available and readily accessible while the respective uses are open for business. 12 of the
spaces are to be dedicated to the Food and Drink Outlet for use during hours of operation.
The works must be undertaken in accordance with an Operational Works approval, be
generally in accordance with Walk Studio’s Site Plan (1.2) dated 27 October 2022, and must
include in particular
a. pedestrian routes in accordance with the conditions of this Decision Notice;
b. disabled parking space/s within the total in accordance with Australia Standard for
Parking Facilities;
c. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Pedestrian and Bicycle Facilities
20. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval, be generally in accordance
with Walk Studio’s Site Plan (1.2) dated 27 October 2022, and must include in particular:
a. pedestrian pathways between the proposed car parking area and the building/s.
Stormwater Drainage
21. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and be generally in accordance with RECOR’s Drainage Layout Plan (20220213-001) dated
21 October 2022.
Services
22. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
23. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
24. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
25. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
26. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
27. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
28. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 4 of 9
Document Set ID: 25010384
Version: 3, Version Date: 28/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original