Information request response - Cover letter

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Project BA
PO Box 45 Noosaville 4566
(07) 5451 8784
[email protected]



                                                                       2nd September 2020
                                                                       Ref: 2020-2584


  Noosa Council
  PO Box 141
  Tewantin Qld 4565


  Dear Sir/Madam:

  RE:                            MCU20/0064 Information Request

  Location:                      5 Figbird Ct, Lake Macdonald QLD 4563
  Approval Number:               2020-2574


  Project BA would like to submit a response to Noosa Council’s information request.



  Information Required:
  Issue 1 - Secondary Dwelling
  Please find attached amended floor plan reflecting requested changes.


  Issue 2 – Onsite Carparking
  Please find attached site plan which indicates designated car-parking area


  Issue 3 – Riparian

  The Owner has engaged Urban Forest Concepts to provide professional advice regarding the
  requirement of rehabilitation planning (report attached). This report believes the required
  rehabilitation planting to be excessive and unnecessary.


  Project BA would like to request that this condition be removed or amended to reflect the
  findings of the report. Please contact Project BA or Urban Forest Concepts directly to discuss if
  required.
Log in to download the original file

Information request response - Cover letter.pdf · 62 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

Project BA
PO Box 45 Noosaville 4566
(07) 5451 8784
[email protected]



  Issue 4 – Effluent Disposal
  Please find attached copy of effluent disposal report. Section ‘7.0 SITE PLAN’ of the effluent
  disposal system design prepared by Biowater Designs shows the construction requirements. The
  pipework from the valve box is installed above existing ground level and does not require the
  removal of any vegetation. The 32mm line between the system and sprinkler area is buried
  200mm below ground level but does not require the removal of any native vegetation.




  If you have any further queries regarding this application, please do not hesitate in contacting
  this office.


  Kind regards,

  Daniel Eichhorn

  Building Certifier Cadet
  Project BA

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.