Information request response - Cover letter
Project BA PO Box 45 Noosaville 4566 (07) 5451 8784 [email protected] Issue 4 – Effluent Disposal Please find attached copy of effluent disposal report. Section ‘7.0 SITE PLAN’ of the effluent disposal system design prepared by Biowater Designs shows the construction requirements. The pipework from the valve box is installed above existing ground level and does not require the removal of any vegetation. The 32mm line between the system and sprinkler area is buried 200mm below ground level but does not require the removal of any native vegetation. If you have any further queries regarding this application, please do not hesitate in contacting this office. Kind regards, Daniel Eichhorn Building Certifier Cadet Project BA