MCU16/0079 Appendix E - Traffic Impact Assessment
Tewantin Noosa RSL – Stage 4, 5 & 6
Traffic Impact Assessment
5. EXTERNAL TRAFFIC ANALYSIS
5.1 BACKGROUND TRAFFIC VOLUMES
A turning movement survey was undertaken at the Memorial Avenue/Doonella Street roundabout during
the following periods to establish existing traffic demands at this location:
Friday 17th June 2016 - AM Peak: 3hrs (6:30am to 9:30am); and
Friday 17th June 2016 - PM Peak: 3hrs (3:30pm to 6:30pm).
A copy of the survey data is included at Appendix G.
In order to account for background traffic growth in the area surrounding the site, a growth rate of 1%p.a.
was applied to all surveyed turning movements. This is considered to be relatively conservative, given the
limited growth potential in Noosa-Tewantin.
5.2 DEVELOPMENT TRAFFIC VOLUMES
The turning movement survey indicates that the surrounding road network peaks at the following times:
AM Road Network Peak = 8:00am to 9:00am; and
PM Road Network Peak = 4:00pm to 5:00pm.
Based on detailed parking occupancy data, it is clear that the existing RSL peak does not coincide with the
adjacent road network peak. Whilst we did not specifically survey traffic movements generated by the RSL,
we are of the view that this could be derived from the parking occupancy data.
As highlighted in Table 5.1 below, we have estimated that the existing RSL may generate in the order of 20
vehicle movements in the AM road network peak and 46 vehicle movements in the PM road network peak.
Apply the corresponding trip rate to the proposed expansion, we have estimated a potential net increase of
10 vehicle movements in the AM road network peak and 20 vehicle movements in the PM road network.
Table 5.1: Development Traffic Generation
Net
Road Off-Street Parking Existing Approximate Potential Net
Assumption Increase
Peaks Demand TUA Trip Rate Increase in Trips
in TUA
20 cars at 8:00am 20 vehicles IN 10 trips
AM 1,957.84m² 1 trip/100m² TUA 940.27m²
& 40 cars at 9:00am & 0 vehicles OUT (100% IN)
60 cars at 4:00pm 26 vehicles IN 19 trips
PM 1,957.84m² 2 trips/100m² TUA 940.27m²
& 66 cars at 5:00pm & 20 vehicles OUT (55% IN / 45% OUT)
This scale of traffic demand is typically considered to be minor from a traffic engineering perspective and in
our view would have negligible impacts on the surrounding road network.
5.3 DEVELOPMENT TRAFFIC DISTRIBUTION
As highlighted in Table 5.2 below, we have adopted distribution assumptions based on approach volumes
surveyed at the Memorial Drive/Doonella Road roundabout during each peak. We have conservatively
assumed that all new traffic generated by the expansion will be to/from either the west or south.
Table 5.2: Development Traffic Distribution
AM Peak PM Peak
Approach Direction Survey Adopted Estimated Survey Adopted Estimated
Demands Distribution Trips Demands Distribution Trips
Doonella Eastbound (IN) 891 58% 6 575 21% 4
Street
(West) Westbound (OUT) 532 - - 745 24% 5
Memorial Northbound (IN) 659 42% 4 912 34% 6
Avenue
(South) Southbound (OUT) 990 - - 659 21% 4
Project No: P2623 Version: 002 Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU16_0079 Appendix E - Traffic Impact Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.