MCU16/0079 Appendix E - Traffic Impact Assessment
MOVEMENT SUMMARY
Site: 1 [2016 AM BG]
Intersection of Memorial Dive & Doonella Street
Roundabout
Movement Performance - Vehicles
Mov OD Demand Flows Deg. Average Level of 95% Back of Queue Prop. Effective Average
ID Mov Total HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed
veh/h % v/c sec veh m per veh km/h
South: Memorial Drive (South)
1 L2 603 2.9 0.499 4.2 LOS A 4.5 32.3 0.22 0.47 54.3
2 T1 129 2.9 0.499 4.3 LOS A 4.5 32.3 0.22 0.47 55.5
3 R2 17 2.9 0.499 8.7 LOS A 4.5 32.3 0.22 0.47 55.3
3u U 9 2.9 0.499 10.7 LOS B 4.5 32.3 0.22 0.47 56.2
Approach 758 2.9 0.499 4.4 LOS A 4.5 32.3 0.22 0.47 54.5
East: Doonella Street (East)
4 L2 7 2.9 0.046 11.9 LOS B 0.3 2.1 0.86 0.77 48.9
5 T1 12 2.9 0.046 12.0 LOS B 0.3 2.1 0.86 0.77 49.9
6 R2 1 2.9 0.046 16.5 LOS B 0.3 2.1 0.86 0.77 49.8
6u U 1 2.9 0.046 18.4 LOS B 0.3 2.1 0.86 0.77 50.5
Approach 21 2.9 0.046 12.5 LOS B 0.3 2.1 0.86 0.77 49.6
North: Memorial Drive (North)
7 L2 6 2.9 0.282 11.3 LOS B 1.9 13.9 0.89 0.90 49.4
8 T1 121 2.9 0.282 11.4 LOS B 1.9 13.9 0.89 0.90 50.4
9 R2 15 2.9 0.282 15.8 LOS B 1.9 13.9 0.89 0.90 50.2
9u U 1 2.9 0.282 17.8 LOS B 1.9 13.9 0.89 0.90 50.9
Approach 143 2.9 0.282 11.9 LOS B 1.9 13.9 0.89 0.90 50.3
West: Doonella Street (West)
10 L2 15 2.9 0.709 5.7 LOS A 7.5 54.0 0.65 0.65 50.1
11 T1 21 2.9 0.709 5.8 LOS A 7.5 54.0 0.65 0.65 51.1
12 R2 847 2.9 0.709 10.3 LOS B 7.5 54.0 0.65 0.65 51.0
12u U 2 2.9 0.709 12.2 LOS B 7.5 54.0 0.65 0.65 51.7
Approach 885 2.9 0.709 10.1 LOS B 7.5 54.0 0.65 0.65 50.9
All Vehicles 1807 2.9 0.709 7.9 LOS A 7.5 54.0 0.49 0.60 52.3
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.