Original source · versioned page text
MCU16/0079 Appendix E - Traffic Impact Assessment
MOVEMENT SUMMARY
Site: 1 [2018 AM BG + DEV]
Intersection of Memorial Dive & Doonella Street
Roundabout
Movement Performance - Vehicles
Mov OD Demand Flows Deg. Average Level of 95% Back of Queue Prop. Effective Average
ID Mov Total HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed
veh/h % v/c sec veh m per veh km/h
South: Memorial Drive (South)
1 L2 615 2.9 0.511 4.2 LOS A 4.7 33.8 0.22 0.47 54.3
2 T1 133 2.9 0.511 4.3 LOS A 4.7 33.8 0.22 0.47 55.5
3 R2 20 2.9 0.511 8.7 LOS A 4.7 33.8 0.22 0.47 55.3
3u U 9 2.9 0.511 10.7 LOS B 4.7 33.8 0.22 0.47 56.2
Approach 777 2.9 0.511 4.4 LOS A 4.7 33.8 0.22 0.47 54.5
East: Doonella Street (East)
4 L2 7 2.9 0.048 12.3 LOS B 0.3 2.2 0.88 0.78 48.7
5 T1 12 2.9 0.048 12.4 LOS B 0.3 2.2 0.88 0.78 49.7
6 R2 1 2.9 0.048 16.8 LOS B 0.3 2.2 0.88 0.78 49.5
6u U 1 2.9 0.048 18.8 LOS B 0.3 2.2 0.88 0.78 50.2
Approach 21 2.9 0.048 12.9 LOS B 0.3 2.2 0.88 0.78 49.4
North: Memorial Drive (North)
7 L2 6 2.9 0.300 11.7 LOS B 2.1 15.0 0.91 0.92 49.1
8 T1 123 2.9 0.300 11.8 LOS B 2.1 15.0 0.91 0.92 50.1
9 R2 15 2.9 0.300 16.3 LOS B 2.1 15.0 0.91 0.92 49.9
9u U 1 2.9 0.300 18.2 LOS B 2.1 15.0 0.91 0.92 50.7
Approach 145 2.9 0.300 12.3 LOS B 2.1 15.0 0.91 0.92 50.1
West: Doonella Street (West)
10 L2 17 2.9 0.733 6.0 LOS A 8.2 58.5 0.69 0.66 50.0
11 T1 25 2.9 0.733 6.0 LOS A 8.2 58.5 0.69 0.66 51.0
12 R2 864 2.9 0.733 10.5 LOS B 8.2 58.5 0.69 0.66 50.9
12u U 2 2.9 0.733 12.4 LOS B 8.2 58.5 0.69 0.66 51.6
Approach 908 2.9 0.733 10.3 LOS B 8.2 58.5 0.69 0.66 50.8
All Vehicles 1851 2.9 0.733 8.0 LOS A 8.2 58.5 0.52 0.60 52.2
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.