Original source · versioned page text
MCU16/0079 Appendix E - Traffic Impact Assessment
MOVEMENT SUMMARY
Site: 1 [2028 AM BG]
Intersection of Memorial Dive & Doonella Street
Roundabout
Movement Performance - Vehicles
Mov OD Demand Flows Deg. Average Level of 95% Back of Queue Prop. Effective Average
ID Mov Total HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed
veh/h % v/c sec veh m per veh km/h
South: Memorial Drive (South)
1 L2 675 2.9 0.560 4.3 LOS A 5.7 40.7 0.26 0.46 54.2
2 T1 144 2.9 0.560 4.3 LOS A 5.7 40.7 0.26 0.46 55.4
3 R2 19 2.9 0.560 8.8 LOS A 5.7 40.7 0.26 0.46 55.2
3u U 10 2.9 0.560 10.7 LOS B 5.7 40.7 0.26 0.46 56.1
Approach 848 2.9 0.560 4.4 LOS A 5.7 40.7 0.26 0.46 54.4
East: Doonella Street (East)
4 L2 8 2.9 0.065 14.6 LOS B 0.4 3.2 0.94 0.83 47.3
5 T1 13 2.9 0.065 14.7 LOS B 0.4 3.2 0.94 0.83 48.3
6 R2 1 2.9 0.065 19.1 LOS B 0.4 3.2 0.94 0.83 48.1
6u U 1 2.9 0.065 21.0 LOS C 0.4 3.2 0.94 0.83 48.8
Approach 23 2.9 0.065 15.1 LOS B 0.4 3.2 0.94 0.83 47.9
North: Memorial Drive (North)
7 L2 7 2.9 0.404 14.8 LOS B 3.1 22.4 0.99 1.02 47.2
8 T1 136 2.9 0.404 14.9 LOS B 3.1 22.4 0.99 1.02 48.1
9 R2 17 2.9 0.404 19.3 LOS B 3.1 22.4 0.99 1.02 48.0
9u U 1 2.9 0.404 21.2 LOS C 3.1 22.4 0.99 1.02 48.6
Approach 161 2.9 0.404 15.4 LOS B 3.1 22.4 0.99 1.02 48.1
West: Doonella Street (West)
10 L2 17 2.9 0.808 7.6 LOS A 12.3 87.9 0.82 0.70 49.4
11 T1 24 2.9 0.808 7.7 LOS A 12.3 87.9 0.82 0.70 50.4
12 R2 949 2.9 0.808 12.2 LOS B 12.3 87.9 0.82 0.70 50.3
12u U 2 2.9 0.808 14.1 LOS B 12.3 87.9 0.82 0.70 51.0
Approach 992 2.9 0.808 12.0 LOS B 12.3 87.9 0.82 0.70 50.3
All Vehicles 2024 2.9 0.808 9.1 LOS A 12.3 87.9 0.60 0.63 51.7
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Site tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.