Council archive · source document
Revised Proposal Plans · MCU13/0261
Attached to the e-mail MCU13/0261 - Response to Information Request - 5 Stevens Street Sunshine Beach.
Plans and drawings: the text below has words only, no drawings.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
BUILDING UNDER
CONSTRUCTION
DRAWING SET
.0 Set No. Name
0
32.5
32.
31.
.5
31.5
34
33.
33
77°44'40" 33.066
0
0
WD.101 COVER SHEET / SITE PLAN
WD.102 EXISTING SITE PLAN
343°00'00" 19
2.0m setback WD.103 WHS NOTES
200 FLOOR PLANS WD.201 SUBFLOOR PLAN
WD.202 GROUND FLOOR PLAN
tback
designers
66
WD.203 FIRST FLOOR PLAN
'15" 9.9
6.0m se
.201
WD.204 ROOF PLAN PO Box 262
UNIT 1 300 REFLECTED CEILING WD.301 GARAGE LEVEL CEILING PLAN Noosa Heads QLD 4567
177°33
WD.302 GROUND FLOOR CEILING PLAN Telephone 07 5447 5633
WD.303 FIRST FLOOR CEILING PLAN
EET
400 LIGHTING ELECTRICAL WD.401 GARAGE LEVEL ELECTRICAL - LIGHTING [email protected]
6.0m setback BINS
WD.402 GROUND FLOOR ELECTRICAL PLAN www.kiddco.com.au
STR
WD.403 FIRST FLOOR ELECTRICAL PLAN
This drawing is to be read in
500 ELEVATION WD.501 ELEVATIONS conjunction with Engineers Drawings &
existing paperbark to be WD.502 ELEVATIONS Reports
BINS
removed and replaced as per
landscape plan
600 SECTIONS WD.601 SECTIONS STREET VIEW Construction to comply
WD.602 SECTIONS with all relevant SAA &
ENS
WD.603 SECTIONS BCA Codes & standard
700 DETAILS WD.701 DETAILS Bldg By-law 1975 & as
UNIT 2 amended
WD.702 DETAILS
STEV
Verify all dimensions on
WD.703 DETAILS site prior to commencement
of any works. These
26
800 JOINERY WD.801 PLANS
16.5
272° drawings are not to be
21'30 WD.802 BAR used for scaling
" 26.4
5 WD.803 BBQ Copyright for design &
25'
2.0m WD.804 BEDROOM 1 drawings remain the
setba
182°
ck property of the authors.
WD.805 BEDROOM 2
CONSULTANTS
WD.806 BEDROOM 3
WD.807 BEDROOM 4 Structural Engineers
SCG Consulting Engineers
TWO
REN STOREY WD.808 BEDROOM 5 Contact: Sean Richardson
SITE PLAN
DER
ED H Phone: (07) 5455 5604
OUS
E WD.809 BEDROOM 6
WD.101 SCALE1:200 WD.810 BUNK ROOM Surveyor
Max Watterson & Associates
900 SCHEDULES WD.901 DOOR SCHEDULE Contact: Max Watterson
WD.902 DOOR SCHEDULE Phone: (07) 5442 6121
WD.903 WINDOW SCHEDULE Private Certifier
WALL & FLOOR LEGEND REAL PROPERTY WD.904 WINDOW SCHEDULE Suncoast Building Approvals
Phone: (07) 5443 7288
WD.905 WINDOW SCHEDULE
RC Block DESCRIPTION WD.906 WINDOW SCHEDULE
Hydraulic Engineer
SCG Consulting Engineers
WD.907 GATE SCHEDULE Contact: Sean Richardson
Lot: 731
Reinforced Concrete Parish: WEYBA
Phone: (07) 5455 5604
Landscape Architect
Timber Framed Wall Address: 5 STEVENS STREET Seed Landscape Architects
SUNSHINE BEACH EXTERNAL FINISHES LEGEND Phone: (07) 3217 6491
FFL 3.500 Finished Floor Level generally (refer to A4 schedules for material description)
SFL 3.500 Structural Floor Level generally AS aluminium screen.
+SL 3.500 Spot Level AFL aluminium framed louvres, refer sched.
AFL aluminium framed window, refer sched.
RL 3.500 Reduced Level
AL aluminium louvres, refer sched.
TOW 3.500 Top of Wall level AFS aluminium framed slider, refer sched.
AFD aluminium framed door, refer sched.
BA sun control battens, refer detail.
BUILDING WORKS SETOUT GENERAL NOTES SURFACE WATER DRAINAGE TERMITE PROTECTION EXCAVATIONS
Building Works to be setout by Licensed Surveyor. Toilet doors are to open outwards or be fitted with lift off The ground beneath suspended floors must be graded so The building shall be protected from subterranean termites Sheet Piling to be designed and certified by RPEQ so as
BL1 balustrade type 1, refer detail.
hinges in accordance with part 3.8.3.3 of NCC Housing that the area beneath the building is above the adjacent by approved physical and/ or chemical barriers in to support likely imposed loads and not cause or allow BL2 balustrade type 1, refer detail.
Identification and height verification survey to be carried Provisions. external finished ground level and surface water is accordance with AS3660.1. damage to adjacent building works or land.
out once fascia/gutter and ridge to roof has been erected prevented from ponding under the building. Refer figure
BLK masonry blockwork.
to confirm no works encroach boundaries and the building All glazing in buildings to comply with the requirements of 3.1.2.3 of NCC Housing Provisions. The precise method of protection shall be determined by All boundary works, including temp. works not to encroach CL ceiling lining.
has been constructed in accordance with approved plans part 3.6 of NCC Housing Provision and AS1288. A glazing the owner/ s and/ or builder only after consultation with a over boundary.
and height does not exceed 8.0m height limit as per the certificate from the manufacturer for compliance with The external finished ground level surrounding the building licensed pest control operator.
CS concrete slab.
local planning scheme. AS1288 must be provided on completion. must be graded to a slope not less than 50mm over the Builder to make allowance to prop, shore and retain the DP down pipe.
first 1.0m from the building in accordance with Figure This information then shall be advised to the Local sides of all excavations required for building construction.
Where existing crossover is modified the builder shall 3.1.2.2 of NCC Housing Provisions. Government or Licensed Certifier prior to, or at the time of The builder shall satisfy himself as to employ prior to
FC fibre cement external cladding.
ENERGY EFFICIENCY construct Kerb & Channel to match adjacent and to local lodgement of the Building Permit Application. commencing 'any' excavation. Any slippage or damage FG fascia gutter.
REQUIREMENT authority requirements. The finished ground level is to be a minimum of 150mm caused as a result of excavation shall be made good by RHB rendered hebel block
below ground floor level. Thereafter, the owners shall ensure that any physical builder. Adequate retention methods are the full
Pro Therm "Reflecta Cell" 7mm insulation to be installed to
All Balustrading to Decks shall be engineer certified. barriers are kept clear of garden beds and/ or soil build up, responsibility of the builder.
MA metal awning, refer detail. Issue for Information 22/01/14
all roof spaces (excluding decks) to manufacturer's MAK polycarbonate roof sheeting, refer schedule.
that any chemical barriers remain undisturbed and that
direction.
Builder to allow for disposal from site all waste TANKING OF HABITABLE AREAS annual inspections (plus eradication as necessary ) are MR metal roofing. Project
materials during demolition and construction period. All steps in floors where retaining walls have been carried out thoughout the life of the building by a licensed STORMWATER NGL natural ground line. PROPOSED DUPLEX
Pro Therm "Reflecta Shield" 4mm insulation to be installed installed or where retaining walls are used as external Roof & surface stormwater to be disposed of in
to all exterior framed walls and framed floors in pest control operator in accordance with AS3660.1.
Smoke alarms must comply with AS 3786 and be walls of habitable rooms are to be waterproofed by an accordance with local authority requirements PW parapet wall. Location
accordance with manufacturer's direction
All external doors and windows to be fitted with a seal to connected to the consumer mains power. Smoke alarms approved tanking system and installed by an accredited On the completion of the building prior to the final PAB powder coated alum. battens 5 STEVENS STREET
must be located in accordance with part 3.7.2.3 of the installer. inspection by the licensed Building Certifier, a licensed
restrict air infiltration RC ridge capping. SUNSHINE BEACH
building code of Australia. Pest Controller is to inspect and confirm that the termite
The approved system is to be certified for compliance system installed has not been bridged or breached and the
SK skylight refer detail & schedule. Client
Hot water systems shall be fitted with a heat trap within upon completion. required visual barrier has been maintained. SP structural post, refer engineer. PILCHER + STAY
one metre of the outlet of the heater and before the first WATER SUPPLY SL soffit lining
Drawing Title
branch. Water Supply: Connect to street mains in accordance with COVER SHEET / SITE
development approval and Unity Water WATER PROOFING WET AREAS SF structural footing, refer engineer. PLAN
All exhaust fans to conditioned spaces to be fitted with a Waterproofing of wet areas to comply with AS3740. A STR stair, refer engineer. Scale Date
self closing damper. If mains water pressure exceeds or could exceed 500kPa, certificate including bathrooms, WC and laundry from an as shown @A2 NOV 13
TER tapered exp. rafters
a water pressure limiting device shall be installed to approved waterproofing applicator will be required before Drawn By Job No:
a final certificate can be issued.
TV turbo vent.
SEWERAGE ensure that the maximum operating pressure at any outlet
WB weatherboard cladding
DDT 1306
Connection of house drains to sewer main to be carried within the boundaries of the property does not exceed 500 Drawing No. Issue No.
kPa.
out in accordance with Unit Water
WD.101 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 6 (of 13)
Section 2
designers
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
[email protected]
www.kiddco.com.au
This drawing is to be read in
conjunction with Engineers Drawings &
Reports
Construction to comply
with all relevant SAA &
BCA Codes & standard
730 Bldg By-law 1975 & as
amended
PHOT RP48
111 Verify all dimensions on
O1 site prior to commencement
BUILDING UNDER of any works. These
705 CONSTRUCTION drawings are not to be
.23 used for scaling
RP48 33 2 Copyright for design &
111 .83 .40 .68 .71 .14 .16 .85 29.7
34 34 33 32 32 .95 30 29 drawings remain the
77°44'40" 30
BA 33.066 BA X property of the authors.
.68
31SH 4 CONSULTANTS
0.1
.34 .90 3PP
33 32 .22 .91 .78
.91 .30 31 29
Structural Engineers
33 32 BA 29
.68 SCG Consulting Engineers
32 0
.19 9.8 Contact: Sean Richardson
177°33
31 .93 2
9.966 5"
.65 29 Phone: (07) 5455 5604
33 .63
N 32 .90 Surveyor
Patio
29
.27 .08
.0
.34
'1
Max Watterson & Associates
33 .32 32
34
.65 32 31 Contact: Max Watterson
.70 32 .97
.95 32 FFL .06 BA .13 29 Phone: (07) 5442 6121
33 32 31 1
.45 32.68 .37 30
. 9
.84
33 31 Private Certifier
s
.66 29
Step
F BA
.93 32 .64 . 29 8 Suncoast Building Approvals
32 30 29.9
33 19.201
SING
32
343°00'00"
FIBR LE STOR .83
WM
Phone: (07) 5443 7288
.62
.97
O HO BA 30 BA
.70
E
EET
USE Y
33 31 .51
30 Hydraulic Engineer
G
SCG Consulting Engineers
.83 Contact: Sean Richardson
32 .64
.5 .52 31 .09 Phone: (07) 5455 5604
33 32 31P
STR
704 32
.98
.24 30
.70 Landscape Architect
.91
731
32 32 Seed Landscape Architects
.5
RP48 .0 .77 Phone: (07) 3217 6491
33
111 PB
32
31
.23 .81 .82
673 m² 31 3P0B
. 36 6 29
9
BA 30 29.
.64
.17
.5
32
33 B
31
.74
16.52 1.0
32 .0 .80
.54 B
32 31
3
BA 32
6
B .50 BA
.64 .41 31
25'
ENS
32 32 .04 .54 .23
182°
32I
C 31 31
Emt A .20 PI BA
32 .80 BA
SP19 31
1
7574 . 84
BA
26.45 .45 30
Emt B
31
SP233303
STEV
.07 2 B
32 72 PI .52
°21'30 .02 G 30
" 31
.46 4
31 SC 30.7
.5
Line
.43 .43
30
of Ea
IO 30 .43 30
30.0
Line ves
of Bu Gutte 3 0
.33
ilding
.70 .37 36
(Gro r
.79 Ste 5 EJ 30
und L
evel) Balco 37 30 30 0.
ny
. 7
ps 3
TWO 30 0.59
REN STOREY 3 .40 8
.93 0 30 9.8 BM: NAIL IN
DER
ED H
OUS
E
IL: 27
.14 29 29.9 2 RL: 2
9.764 KERB
By Unit
y Wate
COMM r Rec
ords MH
29
.60
PROP ON LL: 29
.79
29
.74
ERTY
SP23
3307
Issue for Information 22/01/14
Project
EXISTING SITE PLAN PROPOSED DUPLEX
WD.102 SCALE1:200
Location
5 STEVENS STREET
SUNSHINE BEACH
Client
PILCHER + STAY
Drawing Title
EXISTING SITE PLAN
Scale Date
as shown @A2 NOV 13
Drawn By Job No:
DDT 1306
Drawing No. Issue No.
WD.102 A
Section 3
designers
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
[email protected]
www.kiddco.com.au
1. FALLS, SLIPS, TRIPS 2. FALLING OBJECTS 5. MANUAL TASKS 7. CONFINED SPACES This drawing is to be read in
conjunction with Engineers Drawings &
LOOSE MATERIALS OR SMALL OBJECTS Components within this design with a mass in excess of 25kg EXCAVATION Reports
a) WORKING AT HEIGHTS should be lifted by two or more workers or by mechanical lifting
Construction, maintenance or demolition work on or around this Construction of this building and some maintenance on the
DURING CONSTRUCTION building is likely to involve persons working above ground level or device. Where this is not practical, suppliers or fabricators should building will require excavation and installation of items within Construction to comply
Wherever possible, components for this building should be above floor levels. Where this occurs one or more of the following be required to limit the component mass. excavations. Where practical, installation should be carried out with all relevant SAA &
prefabricated off-site or at ground level to minimise the risk of measures should be taken to avoid objects falling from the area All material packaging, building and maintenance components using methods which do not require workers to enter the BCA Codes & standard
workers falling more than two metres. However, construction of this where the work is being carried out onto persons below. should clearly show the total mass of packages and where excavation. Where this is not practical, adequate support for the Bldg By-law 1975 & as
building will require workers to be working at heights where a fall in 1. Prevent or restrict access to areas below where the work is practical all items should be stored on site in a way which excavated area should be provided to prevent collapse. Warning amended
excess of two metres is possible and injury is likely to result from such being carried out. minimises bending before lifting. Advice should be provided on signs and barriers to prevent accidental or unauthorised access to Verify all dimensions on
a fall. The builder should provide a suitable barrier wherever a 2. Provide toeboards to scaffolding or work platforms. safe lifting methods in all areas where lifting may occur. all excavations should be provided. site prior to commencement
person is required to work in a situation where falling more than 3. Provide protective structure below the work area. Construction, maintenance and demolition of this building will of any works. These
two metres is a possibility. 4. Ensure that all persons below the work area have Personal require the use of portable tools and equipment. These should be ENCLOSED SPACES
For buildings with enclosed spaces where maintenance or other drawings are not to be
Protective Equipment (PPE). fully maintained in accordance with manufacturer’s used for scaling
DURING OPERATION OR MAINTENANCE access may be required:
For houses or other low-rise buildings where scaffolding is specifications and not used where faulty or (in the case of Copyright for design &
BUILDING COMPONENTS Enclosed spaces within this building may present a risk to persons
appropriate: electrical equipment) not carrying a current electrical safety tag. drawings remain the
During construction, renovation or demolition of this building, parts of entering for construction, maintenance or any other purpose. The
Cleaning and maintenance of windows, walls, roof or other All safety guards or devices should be regularly checked and property of the authors.
the structure including fabricated steelwork, heavy panels and many design documentation calls for warning signs and barriers to
components of this building will require persons to be situated Personal Protective Equipment should be used in accordance CONSULTANTS
other components will remain standing prior to or after supporting unauthorised access. These should be maintained throughout the
where a fall from a height in excess of two metres is possible. Where with manufacturer’s specification.
life of the building. Where workers are required to enter enclosed
parts are in place. Contractors should ensure that temporary bracing Structural Engineers
this type of activity is required, scaffolding, ladders or trestles should spaces, air testing equipment and Personal Protective Equipment
or other required support is in place at all times when collapse which SCG Consulting Engineers
be used in accordance with relevant codes of practice,
regulations or legislation.
may injure persons in the area is a possibility. 6. HAZARDOUS SUBSTANCES should be provided. Contact: Sean Richardson
ASBESTOS SMALL SPACES Phone: (07) 5455 5604
For buildings where scaffold, ladders, trestles are not appropriate: For buildings with small spaces where maintenance or other access
Mechanical lifting of materials and components during construction, For alterations to a building constructed prior to 1990: Surveyor
Cleaning and maintenance of windows, walls, roof or other may be required:
maintenance or demolition presents a risk of falling objects. If this existing building was constructed prior to: Max Watterson & Associates
components of this building will require persons to be situated Some small spaces within this building will require access by
Contractors should ensure that appropriate lifting devices are used, 1990 - it therefore may contain asbestos Contact: Max Watterson
where a fall from a height in excess of two metres is possible. Where construction or maintenance workers. The design documentation Phone: (07) 5442 6121
that loads are properly secured and that access to areas below the 1986 - it therefore is likely to contain asbestos
this type of activity is required, scaffolding, fall barriers or Personal calls for warning signs and barriers to unauthorised access. These
load is prevented or restricted. either in cladding material or in fire retardant insulation material. In Private Certifier
Protective Equipment (PPE) should be used in accordance with should be maintained throughout the life of the building. Where
either case, the builder should check and, if necessary, take Suncoast Building Approvals
relevant codes of practice, regulations or legislation. 3. TRAFFIC MANAGEMENT appropriate action before demolishing, cutting, sanding, drilling or
workers are required to enter small spaces they should be Phone: (07) 5443 7288
For building on a major road, narrow road or steeply sloping road: scheduled so that access is for short periods. Manual lifting and
b) SLIPPERY OR UNEVEN SURFACES otherwise disturbing the existing structure. Hydraulic Engineer
Parking of vehicles or loading/unloading of vehicles on this roadway other manual activity should be restricted in small spaces.
POWDERED MATERIALS SCG Consulting Engineers
FLOOR FINISHES Specified may cause a traffic hazard. During construction, maintenance or
If finishes have been specified by designer, these have been demolition of this building designated parking for workers and loading
Many materials used in the construction of this building can cause 8. PUBLIC ACCESS Contact: Sean Richardson
harm if inhaled in powdered form. Persons working on or in the Phone: (07) 5455 5604
Public access to construction and demolition sites and to areas
selected to minimise the risk of floors and paved areas becoming areas should be provided. Trained traffic management personnel building during construction, operational maintenance or demolition under maintenance causes risk to workers and public. Warning Landscape Architect
slippery when wet or when walked on with wet shoes/feet. Any should be responsible for the supervision of these areas. should ensure good ventilation and wear Personal Protective Seed Landscape Architects
signs and secure barriers to unauthorised access should be
changes to the specified finish should be made in consultation with For building where on-site loading/unloading is restricted: Equipment including protection against inhalation while using Phone: (07) 3217 6491
provided. Where electrical installations, excavations, plant or loose
the designer or, if this is not practical, surfaces with an equivalent or Construction of this building will require loading and unloading of powdered material or when sanding, drilling, cutting or otherwise materials are present they should be secured when not fully
better slip resistance should be chosen. materials on the roadway. Deliveries should be well planned to avoid disturbing or creating powdered material. supervised.
FLOOR FINISHES By Owner congestion of loading areas and trained traffic management
personnel should be used to supervise loading/unloading areas. TREATED TIMBER
If designer has not not been involved in the selection of surface
For all buildings: The design of this building may include provision for the inclusion of 9. OPERATIONAL USE OF BUILDING
finishes, the owner is responsible for the selection of surface finishes
in the pedestrian trafficable areas of this building. Surfaces should Busy construction and demolition sites present a risk of collision where treated timber within the structure. Dust or fumes from this material RESIDENTIAL BUILDINGS
be selected in accordance with AS HB 197:1999 and AS/NZ deliveries and other traffic are moving within the site. A traffic can be harmful. Persons working on or in the building during This building has been designed as a residential building. If it, at a
4586:2004. management plan supervised by trained traffic management construction, operational maintenance or demolition should ensure later date, it is used or intended to be used as a workplace, the
STEPS, LOOSE OBJECTS AND UNEVEN SURFACES personnel should be adopted for the work site. good ventilation and wear Personal Protective Equipment including provisions of the Work Health and Safety Act 2011 or subsequent
Due to design restrictions for this building, steps and/or ramps are protection against inhalation of harmful material when sanding, replacement Act should be applied to the new use.
included in the building which may be a hazard to workers carrying 4. SERVICES drilling, cutting or using treated timber in any way that may cause
harmful material to be released. Do not burn treated timber.
objects or otherwise occupied. Steps should be clearly marked with GENERAL 10.OTHER HIGH RISK ACTIVITY
both visual and tactile warning during construction, maintenance, Rupture of services during excavation or other activity creates a VOLATILE ORGANIC COMPOUNDS All electrical work should be carried out in accordance with Code
demolition and at all times when the building operates as a variety of risks including release of hazardous material. Existing Many types of glue, solvents, spray packs, paints, varnishes and of Practice: Managing Electrical Risks at the Workplace, AS/NZ
workplace. services are located on or around this site. Where known, these are some cleaning materials and disinfectants have dangerous 3012 and all licensing requirements.
Building owners and occupiers should monitor the pedestrian identified on the plans but the exact location and extent of emissions. Areas where these are used should be kept well All work using Plant should be carried out in accordance with
access ways and in particular access to areas where maintenance services may vary from that indicated. Services should be located ventilated while the material is being used and for a period after Code of Practice: Managing Risks of Plant at the Workplace.
is routinely carried out to ensure that surfaces have not moved or using an appropriate service (such as Dial Before You Dig), installation. Personal Protective Equipment may also be required. All work should be carried out in accordance with Code of
cracked so that they become uneven and present a trip hazard. appropriate excavation practice should be used and, where The manufacturer’s recommendations for use must be carefully Practice: Managing Noise and Preventing Hearing Loss at Work.
Spills, loose material, stray objects or any other matter that may necessary, specialist contractors should be used. considered at all times. Due to the history of serious incidents it is recommended that
cause a slip or trip hazard should be cleaned or removed from Locations with underground power: particular care be exercised when undertaking work involving steel
access ways. Underground power lines MAY be located in or around this site. All SYNTHETIC MINERAL FIBRE
Fibreglass, rockwool, ceramic and other material used for thermal or construction and concrete placement. All the above applies.
Contractors should be required to maintain a tidy work site during underground power lines must be disconnected or carefully
construction, maintenance or demolition to reduce the risk of trips located and adequate warning signs used prior to any sound insulation may contain synthetic mineral fibre which may be
and falls in the workplace. Materials for construction or construction, maintenance or demolition commencing. harmful if inhaled or if it comes in contact with the skin, eyes or other THESE NOTES MUST BE READ AND UNDERSTOOD
maintenance should be stored in designated areas away from sensitive parts or the body. Personal Protective Equipment including
access ways and work areas.
Locations with overhead power lines:
protection against inhalation of harmful material should be used when BY ALL INVOLVED IN THE PROJECT.
Overhead power lines MAY be near or on this site. These pose a risk
of electrocution if struck or approached by lifting devices or other installing, removing or working near bulk insulation material.
plant and persons working above ground level. Where there is a TIMBER FLOORS THIS INCLUDES (but is not excluded to):
danger of this occurring, power lines should be, where practical, This building may contain timber floors which have an applied finish. OWNER, BUILDER, SUB-CONTRACTORS,
disconnected or relocated. Where this is not practical adequate Areas where finishes are applied should be kept well ventilated during
warning in the form of bright coloured tape or signage should be sanding and application and for a period after installation. Personal
CONSULTANTS, RENOVATORS, OPERATORS,
Issue for Information 22/01/14
used or a protective barrier provided. Protective Equipment may also be required. The manufacturer’s MAINTAINERS, DEMOLISHERS.
recommendations for use must be carefully considered at all times.
Project
PROPOSED DUPLEX
Location
5 STEVENS STREET
SUNSHINE BEACH
Client
PILCHER + STAY
Drawing Title
WHS NOTES
Scale Date
as shown @A2 NOV 13
Drawn By Job No:
DDT 1306
Drawing No. Issue No.
WD.103 A
Section 4
1-1 1-2 1-3 1-4 1-5 1-6 1-7
designers
PO Box 262
Noosa Heads QLD 4567
Telephone 07 5447 5633
E NE
#LayID [email protected]
www.kiddco.com.au
200 1,000 200 5,400 200 2,000 200 2,000 200 5,220 200 4,400 200 This drawing is to be read in
conjunction with Engineers Drawings &
block retaining wall, Reports
to engineers detail
2.0m setback
1-A
over
B B Construction to comply
#LayID pool shell #LayID with all relevant SAA &
200
or
BCA Codes & standard
line of flo
200
UNIT
UNIT
1 1 Bldg By-law 1975 & as
block retaining wall,
amended
to engineers detail
line of floor over
Verify all dimensions on
STORE
D02
line of steps over
site prior to commencement
GARAGE STORE
3,600
3,600
block retaining wall, 3.6 X 4.4 PLUNGE POOL of any works. These
FFL 30,700 concrete
to engineers detail drawings are not to be
5,400
concrete used for scaling
entry stair Copyright for design &
D03
to detail drawings remain the
200
property of the authors.
1-B CONSULTANTS
A pool shell A
retaining wall,
D04
900
WD.601 up WD.601
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. to engineers detail Structural Engineers
SCG Consulting Engineers
retaining wall, Contact: Sean Richardson
G01
200
to engineers detail D01 Phone: (07) 5455 5604
200
200 5,400 200 400 200 boundary wall
landscape path to future detail Surveyor
ck
to landscape architects detail Max Watterson & Associates
setba
Contact: Max Watterson
Phone: (07) 5442 6121
6.0m
TURNING AREAS rock retaining wall,
6.0m setback
Private Certifier
to engineers detail to engineers detail Suncoast Building Approvals
1-C F F Phone: (07) 5443 7288
900
#LayID #LayID Hydraulic Engineer
F1 line of party wall over
#LayID trafficable grated drain SCG Consulting Engineers
refer Schedule of driveway Contact: Sean Richardson
200
WE Materials & Finishes to engineers detail Phone: (07) 5455 5604
200 5,000 200
200
rock retaining wall, EE Landscape Architect
2-A
900
to engineers detail Seed Landscape Architects
Phone: (07) 3217 6491
2-B
200
D05
1-D D
#LayID landscape path
to landscape architects detail
5,400
D07
8. G02
up
4,300
1. 2. existing paperbark to be
3. 4.
C 2-C 5. 6.
7. removed and replaced as per
WD.602 GARAGE landscape plan
up
FFL 30,300
200
2-D concrete
entry stair
to detail
200
UNIT 2
200
1,800
block retaining wall, STORE
D06
pool s
ver
to engineers detail concrete hell
floor o
r
e ove
200
3,800
pool s s over
Terrac
line of
200
hell
step
line of
5,700
line of
3.6 X 4.4 PLUNGE POOL
3,600
200
2,000
200
D
3,370 2.0m #LayID
setba
ck
pool s
200
E hell
#LayID
SE
200
C
4,400 WD.602
2-1 200
Issue for Information 22/01/14
2-2
Project
2-3
PROPOSED DUPLEX
2-4 Location
5 STEVENS STREET
2-5 SUNSHINE BEACH
Client
2-6
PILCHER + STAY
2-7 Drawing Title
SUBFLOOR PLAN
2-8
Scale Date
as shown @A2 NOV 13
Drawn By Job No:
DDT 1306
SUBFLOOR PLAN Drawing No. Issue No.
WD.201 SCALE1:100 WD.201 A
Section 5
1-1 1-2 1-3 1-4 1-5 1-6 1-7
1,200 5,600 4,600 3,000 2,420 4,400 designers
100 3,100 100 1,550 100 1,850 100 4,400 100
PO Box 262
100 1,100 100 5,350 250 Noosa Heads QLD 4567
500 100
100 100 1,600 100 3,700 100 600 1,000 Telephone 07 5447 5633
E NE
#LayID [email protected]
www.kiddco.com.au
500
landscape steps and retaining
to landscape architects detail This drawing is to be read in
raking post, FFL 32,850 conjunction with Engineers Drawings &
to engineers detail landing
up Reports
tile
100
W10 W09 D13 W08 W07 2.0m setback
1-A
LANDSCAPE
B B Construction to comply
100
100
#LayID cpb tub #LayID with all relevant SAA &
shr
1,100
1,250
WM/ UNIT 1 BCA Codes & standard
BANK
W11
150
DRY 2.0 high masonry boundary wall, Bldg By-law 1975 & as
BATH wc L'DY
100
BED 3 refer engineer amended
line of floor over
LANDSCAPE tile tile s
W06
GAMES Verify all dimensions on
3,300
FFL 33,900
1,050
TERRACE TERRACE
4,400
4,200
carpet site prior to commencement
W12
FFL 33,550
2,200
bar
2,850
FFL 33,850 D10 D09 polished concrete up PLUNGE POOL of any works. These
900 high FFL 33,550
tile tile drawings are not to be
100
store under
D11
FFL 33,900 used for scaling
D12 screen
W13
up Copyright for design &
1,700
34,950 6. 7. 8. 9. 10.11. drawings remain the
100
block retaining under,
900
W05
100
150
2. 1. property of the authors.
polycarbonate screen infill over
1-B
1,800
W03 W04 CONSULTANTS
100
100
A A
ENTRY
D08
up
1,100
900
WD.601 34,775 5. 4. 3. 2. 1. WD.601 Structural Engineers
PORCH 4. 3. 2. 1.
1,850
D14 SCG Consulting Engineers
1,975
tile screen
100
towels
Contact: Sean Richardson
900
retaining wall, wc
200
screen W02 18.17.16.15.14.13.12.11. landscape existing paperbark to be removed and Phone: (07) 5455 5604
to engineers detail W14 line of roof over
4,100
200
to landscape architects detail replaced as per landscape plan
100
Surveyor
E/S BED 2
line of floor over
entry stair
ck
Max Watterson & Associates
1,900
D15
2,975
setba
site area 333.06 m2 FFL 33,900 to detail
banquette
tile
680
Contact: Max Watterson
carpet
W15
W01
BINS Phone: (07) 5442 6121
screen
6.0m
60/60/60 twin stud wall,
6.0m setback
shr u/g gas Private Certifier
CSR System 103 Suncoast Building Approvals
fence to detail storage
1-C F G02 F Phone: (07) 5443 7288
line of floor over
275 1,900 250
250
#LayID #LayID Hydraulic Engineer
F1 shr driveway below
banquette
#LayID screen to engineers detail SCG Consulting Engineers
4,370
W31
W16
site area 340.15 m2 Contact: Sean Richardson
WE E/S BED 2 Phone: (07) 5455 5604
3,200
D18
FFL 33,150
2,975
G01
tile 200 Landscape Architect
carpet entry stair EE
2-A
100
1,200 200 Seed Landscape Architects
W17 screen to detail
3,500
W30
towels
line of 900 Phone: (07) 3217 6491
wc 200 8
900
800
roof o 00
800
2-B D17
ver 200
1-D D landing 16.15. landsc G03
100
100
14.13. a
680
to lan pe
100
#LayID up 12.11.
D16
FFL 34,395
150
10.
ENTRY PORCH 9. dscap BINS
W18
7. 6. 5. e arch
timber 4. 3. itects
2. 1. tile scree up detail 2.0 high masonry boundary wall,
2,680
200
900
n
W29
2,480
LANDSCAPE D23 8. refer engineer
W19
200
2,380
8.
900 200
1,200 u/g gas F1
TERRACE 200
900 storage
screen #LayID
FFL 33,050 1200h robe / 200
2-C
100
C
W20
tile store under stair
D19
WD.602 up W28
FFL 33,150 2.
1,120
BUNKROOM
1,020
150
D20 1.
W21
2-D FFL 33,150 block retaining under,
W27
D21
carpet bar
UNIT 2 polycarbonate screen infill over
100
BATH FFL 31,850
tile wc LIVING 2
1,000
bunkbeds L'DY WM/ FFL 32,800
ver
2,000
tile DRY
shr
W26
polished concrete
floor o
W22
cpb TERRACE
100
FFL 32,800
tub
line of
W23 tile
landscape steps and retaining
D22 up
to landscape architects detail
100
up W24
1,200
landing PLUNGE POOL
tile W25
500100
D
5,200
2.0m #LayID
setba 6. 5. 4. 3. 2
100
3,000 ck . 1.
6,700
4,500
100 500 E
100 #LayID
100
1,200100 250
2,600
3,000 SE
100
100 1,250 100 50 C
500
1,550 0 landscape steps
600 WD.602
100 100
3,100 1,850
2-1 100
Issue for Information 22/01/14
2-2
100
100
3,800
3,700
Project
2-3 100
3,000 PROPOSED DUPLEX
Section 6
3,900
2-4 1,250
500
850 Location
3,000 block retaining under, 5 STEVENS STREET
2-5 4,401 polycarbonate screen infill over
SUNSHINE BEACH
2,101
397 Client
2-6
4,400 PILCHER + STAY
2-7 Drawing Title
GROUND FLOOR
2-8 PLAN
Scale Date
as shown @A2 NOV 13
Drawn By Job No:
DDT 1306
GROUND FLOOR PLAN Drawing No. Issue No.
WD.202 SCALE1:100 WD.202 A
The text continues on section 7.
Used in these records
Revised Proposal Plans.PDFRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.