Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Negotiated Report (Representations made) MCU25 0118 (As Published) · MCU25/0118

of 11

Text shows just the words. Original shows the document exactly as it was published.

               REQUEST FOR NEGOTIATED DECISION REPORT
               Author                  Senior Development Planner, Georgina Schramm
                                       Development Assessment



                  APPLICATION DETAILS

                  Application No.                     MCU25/0118

                  Development Approval                Material Change of Use - Multiple Dwelling – Affordable
                                                      Rental Premises (25 x small dwellings)

                  Applicant                           Coast2Bay Housing Group Limited C/- Ben Heaton

                  Representations Received On         16 March 2026

                  Negotiated Decision Due Date        24 April 2026

                  Report Reviewed & Finalised         Patrick Murphy
                  By
                                                      27.04.2026

                  Number of Submissions for           Fifty-three (53)
                  Original Application
                                                      1 in support
                                                      1 impartial
                                                      51 objections


                  PROPERTY DETAILS

                  Property Address                    64 Lake Macdonald Dr Cooroy Qld 4563

                  RP Description                      Lot 2 SP 348613 (part)

                  Land Area                           25,302.36m² / 25.3 hectares
                                                      (Future Lot 1 – 3,158m2)

                  Existing Use of Land                Vacant – Council Owned Land


                  STATUTORY DETAILS

                  SEQRP Designation                   Urban Footprint

                  Zone                                Community Facilities Zone

                  Precinct                            Not applicable

                  Local Plan Area                     Cooroy Local Plan Area

                  Overlays                            Biodiversity, Waterways and Wetlands Overlay


                                                                                                     Page 1 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026
Full text of the other 10 pages

Page 2

                                                       Local Resource Separation Area (limited only to the north-
                                                       eastern corner of property)
                                                       Flood Hazard Overlay
                                                       Landslide Hazard Overlay

                    Assessment Type                    Representations made to original approval



               1.        BACKGROUND
               A development approval for a Material Change of Use - Multiple dwelling was issued on 19
               February 2026
               The applicant suspended the appeal period and made representations on 16 March 2026 to the
               development approval conditions. The representations are detailed below but primarily relate to
               changes as a result further investigations having been undertaken (detailed design stage)
               including:
                     -    Utility services within the front setback and outside of the approved building footprint to
                          meet the relevant fire servicing requirements, and subsequent change to the approved
                          landscaped plans; and
                     -    Item of clarity relating to the building height condition
               At the time the application was publicly notified 53 properly made submissions were received. The
               submitters were primarily concerned with works being undertaken relating to the subdivision of the
               site and associated operational works, which is separate to the subject application.
               2.        ASSESSMENT
               An assessment in relation to each of the submitted representations is provided below:
               Existing Condition 4
                         Approved Plans
               4.        Development authorised by this approval must be undertaken generally in accordance with
                         the Approved Plans listed in the table below.

                           Plan No.           Rev.    Plan/Document Name                            Date

                           SK-4               G       Site Sections, prepared by Hollindale 4 December
                                                      Mainwaring Architecture               2025

                           SK-6               G       Material Selection, prepared by Hollindale 4 December
                                                      Mainwaring Architecture                    2025

                           SK-7-0             G       Ground Floor Plan, prepared by Hollindale 4 December
                                                      Mainwaring Architecture                   2025

                           SK-7-1             G       First Floor Plan, prepared by Hollindale 4 December
                                                      Mainwaring Architecture                  2025

                           SK-7-2             G       Second Floor Plan, prepared by Hollindale 4 December
                                                      Mainwaring Architecture                   2025

                           SK7-3              G       Roof Level, prepared         by   Hollindale 4 December
                                                      Mainwaring Architecture                      2025

                           SK8-1              G       Elevations,  prepared       by    Hollindale 4 December
                                                      Mainwaring Architecture                      2025

                                                                                                       Page 2 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 3

                         SK-8-2              G       Elevations,  prepared       by     Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         SK-8-3              G       North Elevation Detail, prepared           by 4 December
                                                     Hollindale Mainwaring Architecture            2025

                         SK-9-1              G       Sections,   prepared        by     Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         SK-9-2              G       Sections,   prepared        by     Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         SK-9-3              G       Sections,   prepared        by     Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         SK-9-4              G       Sections,   prepared        by     Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         SK-10-a             G       Unit A Plans, prepared by Hollindale 4 December
                                                     Mainwaring Architecture              2025

                         SK-10-c             G       Unit C Plans, prepared by Hollindale 4 December
                                                     Mainwaring Architecture              2025

                         SK-10-d             G       Unit D & Type E Plans, prepared by 4 December
                                                     Hollindale Mainwaring Architecture 2025

                         SK-11-1             G       Perspectives, prepared       by    Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         SK11-3              G       Perspectives, prepared       by    Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         Sk-11-4             G       Perspectives, prepared       by    Hollindale 4 December
                                                     Mainwaring Architecture                       2025

                         24228               I       Landscape Concept Plan             Package, November
                                                     prepared by Project Urban                   2025


               Applicant’s Request
               The applicant has requested existing condition be amended to reflect the revised plans and has
               provided the following justification.
                      Since responding to Council’s information request in late 2025, Coast2Bay have progressed
                      detailed design with input from additional technical consultants, including building certifier,
                      mechanical and hydraulic engineering. Advice on fire servicing has been sought from MRP
                      Hydraulic & Fire Services Consultants on the likely infrastructure requirements to ensure that
                      the development can be safeguarded in the event of a fire. Usually, at this stage of the design,
                      a flow and pressure test would be undertaken on site to determine the existing capacity of
                      the water network. As the subdivision works are still in progress, actual testing pertaining to
                      the specific site is not available. However, MRP have made assumptions based on
                      experience and prior available data in the area. Importantly, the capacity of the water network
                      for fire flow is outside of Coast2Bay’s control and any future upgrades by Unitywater are not
                      known / allowed for. Based on MRP’s advice, a booster assembly unit is required and would
                      need to be located adjacent to the road frontage, while a fire pump room has also been

                                                                                                        Page 3 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 4

                      determined as being a highly likely requirement. These services are shown in the images
                      provided at Figures 1 & 2 below.
                      In this regard, MRP have advised that the approved development requires a minimum fire
                      hydrant system pressure of 350 kPa at 20 L/s at the two most disadvantaged hydrant outlets
                      located on Level 2. Historic flow and pressure data for the Cooroy area indicate an available
                      street supply of approximately 390 kPa at 20 L/s. After accounting for pressure losses
                      through the required pipework, valves, fittings, and vertical rise of 9m+ through the building,
                      hydraulic modelling of the hydrant system from the Unitywater water main to the most
                      disadvantaged hydrants indicates the minimum required performance likely cannot be
                      achieved from the Unitywater water main supply alone. Accordingly, provision for a single
                      fire pump housed within a dedicated fire-rated pump room (3m x 5m x 2.1m high) is required
                      to supplement supply pressure and ensure compliance with the applicable fire services
                      standards. Importantly, this has been located clear of Council’s required 6.0m setback from
                      the frontage.




                      Given the need to introduce these utility structures, a suite of amended architectural and
                      landscape plans have been produced by Hollindale Mainwaring Architecture and Project


                                                                                                       Page 4 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 5

                      Urban respectively, for endorsement by Council in conjunction with this request for a
                      Negotiated Decision Notice – refer Appendix A & B of this correspondence.
                      While the changes described above only affect the floor plans, elevations and some section
                      drawings, for ease of updating their plans, Hollindale Mainwaring have updated their entire
                      suite of drawings, labelled Version H dated 10 March 2026. Similarly, Project Urban have
                      amended their Landscape Concept Plan Package to reflect these new infrastructure
                      requirements, issuing Revision J, for endorsement by Council.
                      From a site cover perspective, our updated calculations including these structures remain
                      under 50% at 49.7% - please find attached amended Ground Flood Plan with this updated
                      calculation.
                      It is requested that the list of plans referenced in Condition 4 be updated accordingly
               Assessment of Request
               Agree
               The utility structures are essential infrastructure, and the location of the hydrant booster enclosure
               has been designed in a way that reflects the approved development’s design.
               The fire hydrant and pump room remain outside of setbacks and within site cover parameters of
               the Noosa Plan 2020.
               The revised plans reflecting the changes to the built form for the purpose of the utility structures
               are recommended to be amended.
               Recommendation
               It is recommended existing condition be amended accordingly.
                      Approved Plans
               4.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                         Plan No.            Rev.   Plan/Document Name                              Date

                         SK-2                H      Site Plan, prepared          by    Hollindale Tuesday, 10
                                                    Mainwaring Architecture                       March 2026

                         SK-4                H      Site Sections, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture               March 2026

                         SK-6                H      Material Selection, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                    March 2026

                         SK-7-0              H      Ground Floor Plan, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                   March 2026

                         SK-7-1              H      First Floor Plan, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                  March 2026

                         SK-7-2              H      Second Floor Plan, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                   March 2026

                         SK7-3               H      Roof Level, prepared         by    Hollindale Tuesday, 10
                                                    Mainwaring Architecture                       March 2026

                         SK8-1               H      Elevations,  prepared       by     Hollindale Tuesday, 10
                                                    Mainwaring Architecture                       March 2026


                                                                                                       Page 5 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 6

                         SK-8-2           H      Elevations,  prepared     by    Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         SK-8-3           H      North Elevation Detail, prepared      by Tuesday, 10
                                                 Hollindale Mainwaring Architecture       March 2026

                         SK-9-1           H      Sections,   prepared      by    Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         SK-9-2           H      Sections,   prepared      by    Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         SK-9-3           H      Sections,   prepared      by    Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         SK-9-4           H      Sections,   prepared      by    Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         SK-10-a          H      Unit A Plans, prepared by Hollindale Tuesday, 10
                                                 Mainwaring Architecture              March 2026

                         SK-10-c          H      Unit C Plans, prepared by Hollindale Tuesday, 10
                                                 Mainwaring Architecture              March 2026

                         SK-10-d          H      Unit D & Type E Plans, prepared by Tuesday, 10
                                                 Hollindale Mainwaring Architecture March 2026

                         SK-11-1          H      Perspectives, prepared     by   Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         SK11-3           H      Perspectives, prepared     by   Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         Sk-11-4          H      Perspectives, prepared     by   Hollindale Tuesday, 10
                                                 Mainwaring Architecture                    March 2026

                         24228            I      Landscape Concept Plan          Package, Tuesday, 10
                                                 prepared by Project Urban                March 2026


               Existing Condition 7
               Building Height
               7.     The maximum height of the development must not exceed 8 metres above the natural and
                      finished ground levels.
               Applicant’s Request
               The applicant has requested existing condition 7 be amended and replaced with the following
               amended condition:
               7.     The maximum height of the development must not exceed 8 metres above the natural and
                      finished ground levels, as shown on the Approved Plans.
               Assessment of Request
               Agree



                                                                                             Page 6 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 7

               No concerns with amending the condition accordingly, the prescribed building height remains no
               more than 8 metres from natural and finished ground levels.
               Recommendation
               It is recommended existing condition be amended accordingly.
               7.     The maximum height of the development must not exceed 8 metres above the natural and
                      finished ground levels, as shown on the Approved Plans.



               Existing Conditions 26 (b) & (c)
               26.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      The works shown on the Approved Landscape Concept Plan.
                      b.      Incorporation of addition large trees capable of scaling the built form provided along
                              the northern, eastern and western boundaries spaced at 5 metre centres along each
                              of the boundaries.
                      c.      Incorporation of additional tall trees on each side of the footpath identified to the east
                              and northeast of “Unit 01” identified on the Landscape Design 3.3 Detail Plan-Ground
                              Floor Plan. Trees are to be spaced at 5 metre centres on each side of the path.
                      d.      Vegetated screening of the development from all boundaries, designed such that the
                              built form will be screened / softened at maturity
                      e.      Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
               Applicant’s Request
               The applicant has requested existing condition be amended to delete 26 (b) and (c).
                      As well as showing the new infrastructure requirements described above, the amended
                      Landscape Concept Package provided at Appendix B has also been updated to include
                      additional large trees to the boundaries, where there is adequate spatial allowance. While
                      provision of additional large trees can be readily accommodated along the northern
                      boundary, providing large trees along the eastern and western boundaries is more
                      challenging. In this regard, the DDA-compliant ramp in the site’s south-eastern corner does
                      not afford room for any additional large trees, as such no changes have been made in this
                      location. Feature trees placed at 5m centres have been introduced in the north-easter corner,
                      ensuring the appearance of the fire hydrant pump room is softened, as depicted in Figure 2
                      above and Figure 3 below. It is also suggested that Coast2Bay could contribute to the
                      provision of trees along the boundary interface with the adjoining bioretention basin.




                                                                                                          Page 7 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 8

                      In terms of the western boundary, given the availability of 1.2m between the boundary fence
                      and the retaining wall located adjacent to Unit 07, it is not considered suitable to provide
                      large trees along this interface. Rather, Project Urban has recommended the use of medium
                      size columnar trees in this location, as depicted in Figure 4 below.




                                                                                                    Page 8 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 9

                      Similarly, the tiered retaining walls located along the south-western boundary only afford a
                      very narrow area for planting that is unsuitable for trees. This area has therefore been
                      purposefully notated on the approved Landscape Concept Plan as comprising ‘lush shade
                      tolerant shrubs’, bordered by medium sized columnar trees to the north and feature pine
                      trees in the south-western corner – refer Figure 5.




                      In light of the above, given the Landscape Concept Plan package provided at Appendix B
                      has been updated to maximise the amount of tree planting achievable to the northern,
                      eastern and western boundaries, we request that Condition 26 (b) be deleted. Similarly, given
                      introduction of the fire hydrant pump room prevents any additional tall trees being placed
                      along the western side of the footpath adjacent to “Unit 01”, we request that (c) also be
                      deleted.
               Assessment of Request
               Agree
               The proposed species replacement shown in the landscape package are agreed to be more
               appropriate in context of underground infrastructure, shading and retaining walls.
               Recommendation
               It is recommended existing condition 26 be amended to read as follows:
               26.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      The works shown on the Approved Landscape Concept Plan.
                      b.      Incorporation of addition large trees capable of scaling the built form provided along
                              the northern, eastern and western boundaries spaced at 5 metre centres along each
                              of the boundaries. Deleted.


                                                                                                      Page 9 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 10

                      c.      Incorporation of additional tall trees on each side of the footpath identified to the east
                              and northeast of “Unit 01” identified on the Landscape Design 3.3 Detail Plan-Ground
                              Floor Plan. Trees are to be spaced at 5 metre centres on each side of the path. Deleted.
                      d.      Vegetated screening of the development from all boundaries, designed such that the
                              built form will be screened / softened at maturity.
                      e.      Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage.


               3.     CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme. The
               requested changes to the conditions do not raise any significant issues and are therefore
               supported. The application is therefore recommended for approval.
               The report is provided in accordance with Section 76 of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No. MCU25/0118, and the representations made, Council on 27 April
               2026 decided to:
               A.     Agree to amend conditions 4, 17 & 26 to read as follows:
                      Approved Plans
               4.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                           Plan No.            Rev.   Plan/Document Name                               Date

                           SK-2                H      Site Plan, prepared           by    Hollindale Tuesday, 10
                                                      Mainwaring Architecture                        March 2026

                           SK-4                H      Site Sections, prepared by Hollindale Tuesday, 10
                                                      Mainwaring Architecture               March 2026

                           SK-6                H      Material Selection, prepared by Hollindale Tuesday, 10
                                                      Mainwaring Architecture                    March 2026

                           SK-7-0              H      Ground Floor Plan, prepared by Hollindale Tuesday, 10
                                                      Mainwaring Architecture                   March 2026

                           SK-7-1              H      First Floor Plan, prepared by Hollindale Tuesday, 10
                                                      Mainwaring Architecture                  March 2026

                           SK-7-2              H      Second Floor Plan, prepared by Hollindale Tuesday, 10
                                                      Mainwaring Architecture                   March 2026

                           SK7-3               H      Roof Level, prepared          by    Hollindale Tuesday, 10
                                                      Mainwaring Architecture                        March 2026

                           SK8-1               H      Elevations,  prepared        by     Hollindale Tuesday, 10
                                                      Mainwaring Architecture                        March 2026

                           SK-8-2              H      Elevations,  prepared        by     Hollindale Tuesday, 10
                                                      Mainwaring Architecture                        March 2026




                                                                                                        Page 10 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Page 11

                           SK-8-3             H       North Elevation Detail, prepared         by Tuesday, 10
                                                      Hollindale Mainwaring Architecture          March 2026

                           SK-9-1             H       Sections,   prepared       by     Hollindale Tuesday, 10
                                                      Mainwaring Architecture                      March 2026

                           SK-9-2             H       Sections,   prepared       by     Hollindale Tuesday, 10
                                                      Mainwaring Architecture                      March 2026

                           SK-9-3             H       Sections,   prepared       by     Hollindale Tuesday, 10
                                                      Mainwaring Architecture                      March 2026

                           SK-9-4             H       Sections,   prepared       by     Hollindale Tuesday, 10
                                                      Mainwaring Architecture                      March 2026

                           SK-10-a            H       Unit A Plans, prepared by Hollindale Tuesday, 10
                                                      Mainwaring Architecture              March 2026

                           SK-10-c            H       Unit C Plans, prepared by Hollindale Tuesday, 10
                                                      Mainwaring Architecture              March 2026

                           SK-10-d            H       Unit D & Type E Plans, prepared by Tuesday, 10
                                                      Hollindale Mainwaring Architecture March 2026

                           SK-11-1            H       Perspectives, prepared      by    Hollindale Tuesday, 10
                                                      Mainwaring Architecture                      March 2026

                           SK11-3             H       Perspectives, prepared      by    Hollindale Tuesday, 10
                                                      Mainwaring Architecture                      March 2026

                           Sk-11-4            H       Perspectives, prepared      by    Hollindale Tuesday, 10
                                                      Mainwaring Architecture                      March 2026

                           24228              I       Landscape Concept Plan            Package, Tuesday, 10
                                                      prepared by Project Urban                  March 2026

                      Building Height
               7.     The maximum height of the development must not exceed 8 metres above the natural and
                      finished ground levels, as shown on the Approved Plans.
                      Landscaping
               26.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      The works shown on the Approved Landscape Concept Plan.
                      b.      Deleted.
                      c.      Deleted.
                      d.      Vegetated screening of the development from all boundaries, designed such that the
                              built form will be screened / softened at maturity
                      e.      Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage




                                                                                                      Page 11 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Report (Representations made) MCU25 0118 (As Published).pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.