Negotiated Report (Representations made) MCU25 0118 (As Published) · MCU25/0118
Urban respectively, for endorsement by Council in conjunction with this request for a
Negotiated Decision Notice – refer Appendix A & B of this correspondence.
While the changes described above only affect the floor plans, elevations and some section
drawings, for ease of updating their plans, Hollindale Mainwaring have updated their entire
suite of drawings, labelled Version H dated 10 March 2026. Similarly, Project Urban have
amended their Landscape Concept Plan Package to reflect these new infrastructure
requirements, issuing Revision J, for endorsement by Council.
From a site cover perspective, our updated calculations including these structures remain
under 50% at 49.7% - please find attached amended Ground Flood Plan with this updated
calculation.
It is requested that the list of plans referenced in Condition 4 be updated accordingly
Assessment of Request
Agree
The utility structures are essential infrastructure, and the location of the hydrant booster enclosure
has been designed in a way that reflects the approved development’s design.
The fire hydrant and pump room remain outside of setbacks and within site cover parameters of
the Noosa Plan 2020.
The revised plans reflecting the changes to the built form for the purpose of the utility structures
are recommended to be amended.
Recommendation
It is recommended existing condition be amended accordingly.
Approved Plans
4. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
SK-2 H Site Plan, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
SK-4 H Site Sections, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
SK-6 H Material Selection, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
SK-7-0 H Ground Floor Plan, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
SK-7-1 H First Floor Plan, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
SK-7-2 H Second Floor Plan, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
SK7-3 H Roof Level, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
SK8-1 H Elevations, prepared by Hollindale Tuesday, 10
Mainwaring Architecture March 2026
Page 5 of 11
Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU25 0118 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.