                      Urban respectively, for endorsement by Council in conjunction with this request for a
                      Negotiated Decision Notice – refer Appendix A & B of this correspondence.
                      While the changes described above only affect the floor plans, elevations and some section
                      drawings, for ease of updating their plans, Hollindale Mainwaring have updated their entire
                      suite of drawings, labelled Version H dated 10 March 2026. Similarly, Project Urban have
                      amended their Landscape Concept Plan Package to reflect these new infrastructure
                      requirements, issuing Revision J, for endorsement by Council.
                      From a site cover perspective, our updated calculations including these structures remain
                      under 50% at 49.7% - please find attached amended Ground Flood Plan with this updated
                      calculation.
                      It is requested that the list of plans referenced in Condition 4 be updated accordingly
               Assessment of Request
               Agree
               The utility structures are essential infrastructure, and the location of the hydrant booster enclosure
               has been designed in a way that reflects the approved development’s design.
               The fire hydrant and pump room remain outside of setbacks and within site cover parameters of
               the Noosa Plan 2020.
               The revised plans reflecting the changes to the built form for the purpose of the utility structures
               are recommended to be amended.
               Recommendation
               It is recommended existing condition be amended accordingly.
                      Approved Plans
               4.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below.

                         Plan No.            Rev.   Plan/Document Name                              Date

                         SK-2                H      Site Plan, prepared          by    Hollindale Tuesday, 10
                                                    Mainwaring Architecture                       March 2026

                         SK-4                H      Site Sections, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture               March 2026

                         SK-6                H      Material Selection, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                    March 2026

                         SK-7-0              H      Ground Floor Plan, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                   March 2026

                         SK-7-1              H      First Floor Plan, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                  March 2026

                         SK-7-2              H      Second Floor Plan, prepared by Hollindale Tuesday, 10
                                                    Mainwaring Architecture                   March 2026

                         SK7-3               H      Roof Level, prepared         by    Hollindale Tuesday, 10
                                                    Mainwaring Architecture                       March 2026

                         SK8-1               H      Elevations,  prepared       by     Hollindale Tuesday, 10
                                                    Mainwaring Architecture                       March 2026


                                                                                                       Page 5 of 11

Document Set ID: 24667136
Version: 3, Version Date: 25/04/2026

Used in these records

About this file

File size
1.9 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Report (Representations made) MCU25 0118 (As Published).pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.