Original source · versioned page text
2020-11-10 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 NOVEMBER 2020
DA_148 ILU Type C (2B-1G) prepared by Smith + Tracey November 2018
Architects
DA_149 ILU Type C (3B-2G) prepared by Smith + Tracey November 2018
Architects
DA_150 ILU Type D (3B-2G) prepared by Smith + Tracey November 2018
Architects
DA_151 ILU Type H1 (2B-1G) + K1 (3B-2G) prepared by November 2018
Smith + Tracey Architects
DA_152 ILU Type H2 (2B-1G) + H2 (3B-2G) prepared by November 2018
Smith + Tracey Architects
DA_153 Independent Living Units – Roof Plans prepared by November 2018
Smith + Tracey Architects
DA_154 Independent Living Units – Elevation Sheet 1 November 2018
prepared by Smith + Tracey Architects
DA_155 Independent Living Units – Elevation Sheet 2 November 2018
prepared by Smith + Tracey Architects
DA_156 Independent Living Units – Typical Sections November 2018
prepared by Smith + Tracey Architects
Nature and Extent of Approved Use
5. The approved development comprises the following:
Multiple Housing – Type 3 Retirement & Special Needs (122 independent living
units and apartments and 102 aged care beds)
Commercial Business – Type 2 Medical (as indicated on approved plans)
Staging
7. The development must be staged in accordance with the plan titled ‘Masterplan’
prepared by Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3 with
the Residential Aged Care Facility provided in the first stage.
LANDSCAPE & ECOLOGY
Flora
12. In conjunction with an application for operational works on the site for the first stage,
the applicant must submit an operational works application for Vegetation Management
for the development site. The Vegetation Management operational works application
must detail:
12.1 Identification of all active Glossy Black Cockatoo food trees within the
development footprint or in areas likely to be impacted upon by the operation or
construction of the development.
12.2 A Vegetation Clearing Offset program to be undertaken to re-establish the habitat
to be cleared from the site to a nearby location with similar soil properties. A
receiving site is to be identified and maintained for a specified period (minimum
5 years) after the establishment of the receiving site.
12.3 The Vegetation Clearing Offset program must include the details of the transfer
methods to be engaged including:
12.3.1 The transfer of soil/seed bank media off the site to the designated
receiving site(s);
Page 19 of 113
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.